The Red-Thai Binh River system is an important water resource to the Northern Delta, serving the development of agriculture, people’s livelihood and other economic sectors through its upstream reservoirs and a system...The Red-Thai Binh River system is an important water resource to the Northern Delta, serving the development of agriculture, people’s livelihood and other economic sectors through its upstream reservoirs and a system of water abstraction works along the rivers. However, due to the impact of climate change and pressure from socio-economic development, the operation of the reservoir system according to Decision No. 740/QD-TTg was issued on June 17, 2019 by the Prime Minister of Government promulgating the Red-Thai Binh River system inter-reservoir operation rules (Operation rules 740) has some shortcomings that need adjustments for higher water use efficiency, meeting downstream water demand and power generation benefits. Through the results of water balance calculation and analysis of economic benefits from water use scenarios, this research proposed adjustment to the inter-reservoir operation during dry season in the Red River system. The result showed that an average water level of 1.0 - 1.7 m should be maintained at Hanoi during the increased release period.展开更多
Automatic solution of vehicle operation adjustment is the important content in realizing vehicle traffic command automation on Internet of Things platform. Based on both the organization realization of Internet of Thi...Automatic solution of vehicle operation adjustment is the important content in realizing vehicle traffic command automation on Internet of Things platform. Based on both the organization realization of Internet of Things platform and the merging vehicle operation adjustment into the Flow-Shop scheduling problem in manufacturing systems,this paper has constructed the optimization model with a two-lane vehicle operation adjustment. With respect to the large model solution space and complex constraints,a better solution algorithm is proposed based on ant colony algorithm for optimal quick solution. The simulation results show that the algorithm is feasible and the approximate optimal solution can be quickly obtained.展开更多
Modeling the application of train operation adjustment actions to recover from delays is of great importance to supporting the decision-making of dispatchers.In this study,the effects of two train operation adjustment...Modeling the application of train operation adjustment actions to recover from delays is of great importance to supporting the decision-making of dispatchers.In this study,the effects of two train operation adjustment actions on train delay recovery were explored using train operation records from scheduled and actual train timetables.First,the modeling data were sorted to extract the possible influencing factors under two typical train operation adjustment actions,namely the compression of the train dwell time at stations and the compression of the train running time in sections.Stepwise regression methods were then employed to determine the importance of the influencing factors corresponding to the train delay recovery time,namely the delay time,the scheduled supplement time,the running interval,the occurrence time,and the place where the delay occurred,under the two train operation adjustment actions.Finally,the gradient-boosted regression tree(GBRT)algorithm was applied to construct a delay recovery model to predict the delay recovery effects of the train operation adjustment actions.A comparison of the prediction results of the GBRT model with those of a random forest model confirmed the better performance of the GBRT prediction model.展开更多
This article from a whole new perspective on existing studies was classified, from the specific issues addressed by starting on two key issues of recent train scheduling plan: train running diagram and train operation...This article from a whole new perspective on existing studies was classified, from the specific issues addressed by starting on two key issues of recent train scheduling plan: train running diagram and train operation adjustment. Solutions, basic ideas and researches are discussed in detail. Among them, the train working diagram is divided into single and double lane sections and Passenger Train Running Diagram. And the train operation adjustment includes the real-time adjustment, the service of train insert and the conflict prediction. This paper introduces automatic train operation dispatching system in scheduling applications, and discusses the train scheduling problems and the future direction of development.展开更多
We present a directed graph-based method for distribution network reconfiguration considering distributed generation. Two reconfiguration situations are considered: operation mode adjustment with the objective of mini...We present a directed graph-based method for distribution network reconfiguration considering distributed generation. Two reconfiguration situations are considered: operation mode adjustment with the objective of minimizing active power loss(situation Ⅰ) and service restoration with the objective of maximizing loads restored(situation Ⅱ). These two situations are modeled as a mixed integer quadratic programming problem and a mixed integer linear programming problem, respectively. The properties of the distribution network with distributed generation considered are reflected as the structure model and the constraints described by directed graph. More specifically, the concepts of "in-degree" and "out-degree"are presented to ensure the radial structure of the distribution network, and the concepts of "virtual node" and"virtual demand" are developed to ensure the connectivity of charged nodes in every independent power supply area.The validity and effectiveness of the proposed method are verified by test results of an IEEE 33-bus system and a 5-feeder system.展开更多
In this paper, we present the design, simulation, fabrication and characterization of a terahertz(THz) filter based on metamaterial consisting of the periodical double symmetric splits ring resonator(DS-SRR) array. We...In this paper, we present the design, simulation, fabrication and characterization of a terahertz(THz) filter based on metamaterial consisting of the periodical double symmetric splits ring resonator(DS-SRR) array. We can observe that the metamaterial-based filter possesses a band-pass transmission when the electrical field is along y direction, and it possesses a low-pass transmission when the electrical field is along x direction. Our results demonstrate that the proposed filter can realize the switching between band-pass effect and low-pass effect by only changing the polarization direction of the incident electromagnetic wave. Moreover, the calculated surface current distributions are also used to analyze the switchable mechanism of the THz metamatrial filter. Therefore, the proposed THz wave filter has a potential application in THz wave communication systems.展开更多
文摘The Red-Thai Binh River system is an important water resource to the Northern Delta, serving the development of agriculture, people’s livelihood and other economic sectors through its upstream reservoirs and a system of water abstraction works along the rivers. However, due to the impact of climate change and pressure from socio-economic development, the operation of the reservoir system according to Decision No. 740/QD-TTg was issued on June 17, 2019 by the Prime Minister of Government promulgating the Red-Thai Binh River system inter-reservoir operation rules (Operation rules 740) has some shortcomings that need adjustments for higher water use efficiency, meeting downstream water demand and power generation benefits. Through the results of water balance calculation and analysis of economic benefits from water use scenarios, this research proposed adjustment to the inter-reservoir operation during dry season in the Red River system. The result showed that an average water level of 1.0 - 1.7 m should be maintained at Hanoi during the increased release period.
基金Sponsored by the Natural Science Foundation of Shandong Province(Grant No.ZR2011FL006)2012 International Cooperation Training Fund of Outstanding Young Backbone Teachers of Colleges and Universities in Shandong Province,and Shandong Province Science,2012 Shandong ProvinceSpark Program and Technology Development Plan(Grant No.2011YD01044)
文摘Automatic solution of vehicle operation adjustment is the important content in realizing vehicle traffic command automation on Internet of Things platform. Based on both the organization realization of Internet of Things platform and the merging vehicle operation adjustment into the Flow-Shop scheduling problem in manufacturing systems,this paper has constructed the optimization model with a two-lane vehicle operation adjustment. With respect to the large model solution space and complex constraints,a better solution algorithm is proposed based on ant colony algorithm for optimal quick solution. The simulation results show that the algorithm is feasible and the approximate optimal solution can be quickly obtained.
基金the National Nature Science Foundation of China(Nos.71871188 and U1834209)the Science and Technology Department of Sichuan Province(No.2018JY0567)。
文摘Modeling the application of train operation adjustment actions to recover from delays is of great importance to supporting the decision-making of dispatchers.In this study,the effects of two train operation adjustment actions on train delay recovery were explored using train operation records from scheduled and actual train timetables.First,the modeling data were sorted to extract the possible influencing factors under two typical train operation adjustment actions,namely the compression of the train dwell time at stations and the compression of the train running time in sections.Stepwise regression methods were then employed to determine the importance of the influencing factors corresponding to the train delay recovery time,namely the delay time,the scheduled supplement time,the running interval,the occurrence time,and the place where the delay occurred,under the two train operation adjustment actions.Finally,the gradient-boosted regression tree(GBRT)algorithm was applied to construct a delay recovery model to predict the delay recovery effects of the train operation adjustment actions.A comparison of the prediction results of the GBRT model with those of a random forest model confirmed the better performance of the GBRT prediction model.
文摘This article from a whole new perspective on existing studies was classified, from the specific issues addressed by starting on two key issues of recent train scheduling plan: train running diagram and train operation adjustment. Solutions, basic ideas and researches are discussed in detail. Among them, the train working diagram is divided into single and double lane sections and Passenger Train Running Diagram. And the train operation adjustment includes the real-time adjustment, the service of train insert and the conflict prediction. This paper introduces automatic train operation dispatching system in scheduling applications, and discusses the train scheduling problems and the future direction of development.
基金supported by the National Science and Technology Support Program of China (No. 2013BAA01B02)
文摘We present a directed graph-based method for distribution network reconfiguration considering distributed generation. Two reconfiguration situations are considered: operation mode adjustment with the objective of minimizing active power loss(situation Ⅰ) and service restoration with the objective of maximizing loads restored(situation Ⅱ). These two situations are modeled as a mixed integer quadratic programming problem and a mixed integer linear programming problem, respectively. The properties of the distribution network with distributed generation considered are reflected as the structure model and the constraints described by directed graph. More specifically, the concepts of "in-degree" and "out-degree"are presented to ensure the radial structure of the distribution network, and the concepts of "virtual node" and"virtual demand" are developed to ensure the connectivity of charged nodes in every independent power supply area.The validity and effectiveness of the proposed method are verified by test results of an IEEE 33-bus system and a 5-feeder system.
基金supported by the Major State Basic Research Development Program of China(No.2010CB934104)the Science and Technology Research Funding of State Cultural Relics Bureau Cultural Relics(No.20110135)+1 种基金the National Special Fund for the Development of Major Research Equipment and Instruments(No.2012YQ14000508)"985 Project"(No.0301-01402904)
文摘In this paper, we present the design, simulation, fabrication and characterization of a terahertz(THz) filter based on metamaterial consisting of the periodical double symmetric splits ring resonator(DS-SRR) array. We can observe that the metamaterial-based filter possesses a band-pass transmission when the electrical field is along y direction, and it possesses a low-pass transmission when the electrical field is along x direction. Our results demonstrate that the proposed filter can realize the switching between band-pass effect and low-pass effect by only changing the polarization direction of the incident electromagnetic wave. Moreover, the calculated surface current distributions are also used to analyze the switchable mechanism of the THz metamatrial filter. Therefore, the proposed THz wave filter has a potential application in THz wave communication systems.