Xinqiao Gully is located in the area of the 2008 Wenchuan M_(s)8.0 earthquake in Sichuan province,China.Based on the investigation of the 2023"6-26"Xinqiao Gully debris flow event,this study assessed the eff...Xinqiao Gully is located in the area of the 2008 Wenchuan M_(s)8.0 earthquake in Sichuan province,China.Based on the investigation of the 2023"6-26"Xinqiao Gully debris flow event,this study assessed the effectiveness of the debris flow control project and evaluated the debris flow hazards.Through field investigation and numerical simulation methods,the indicators of flow intensity reduction rate and storage capacity fullness were proposed to quantify the effectiveness of the engineering measures in the debris flow event.The simulation results show that the debris flow control project reduced the flow intensity by41.05%to 64.61%.The storage capacity of the dam decreases gradually from upstream to the mouth of the gully,thus effectively intercepting and controlling the debris flow.By evaluating the debris flow of different recurrence intervals,further measures are recommended for managing debris flow events.展开更多
The reduction of fuel consumption in engines is always considered of vital importance.Along these lines,in this work,this goal was attained by optimizing the heavy-duty commercial vehicle engine control strategy.More ...The reduction of fuel consumption in engines is always considered of vital importance.Along these lines,in this work,this goal was attained by optimizing the heavy-duty commercial vehicle engine control strategy.More specifically,at first,a general first principles model for heavy-duty commercial vehicles and a transient fuel consumptionmodel for heavy-duty commercial vehicles were developed and the parameters were adjusted to fit the empirical data.The accuracy of the proposed modelwas demonstrated fromthe stage and the final results.Next,the control optimization problem resulting in low fuel consumption in heavy commercial vehicles was described,with minimal fuel usage as the optimization goal and throttle opening as the control variable.Then,a time-continuous engine management approach was assessed.Next,the factors that influence low fuel consumption in heavy-duty commercial vehicles were systematically examined.To reduce the computing complexity,the control strategies related to the time constraints of the engine were parametrized using three different methods.The most effective solution was obtained by applying a global optimization strategy because the constrained optimization problem was nonlinear.Finally,the effectiveness of the low-fuel consumption engine control strategy was demonstrated by comparing the simulated and field test results.展开更多
Determining the main controlling factors of earthquake-triggered geohazards is a prerequisite for studying earthquake geohazards and post-disaster emergency response.By studying these factors,the geomorphic and geolog...Determining the main controlling factors of earthquake-triggered geohazards is a prerequisite for studying earthquake geohazards and post-disaster emergency response.By studying these factors,the geomorphic and geological factors controlling the nature,condition,and distribution of earthquake-induced geohazards can be analyzed.Such insights facilitate earthquake disaster prediction and emergency response planning.The authors combined field investigations and spatial data analysis to examine geohazards induced by seismic events,examining ten earthquakes including the Wenchuan,Yushu,Lushan events,to elucidate the main control factors of seismic geohazard.The authors observed that seismic geohazard occurrence is usually affected by many factors,among which active nature of the seismogenic fault,seismic peak ground acceleration(PGA),topographic slope and geomorphic height differences,and distance from the fault zone and river system are the most important.Compared with strike-slip earthquakes,thrust earthquakes induce more high-altitude and high-speed remote landslides,which can cause great harm.Slopes of 0°–40°are prone to secondary seismic geohazards,which are mainly concentrated 0–6 km from the river system.Secondary geohazards are not only related to seismogenic fault but also influenced by the associated faults in the earthquake area.The maximum seismic PGA and secondary seismic geohazard number are positively correlated,and the horizontal and vertical ground motions play leading and promoting roles in secondary geohazard formation,respectively.Through the research,the spatial distribution of seismic geohazards is predicted,providing a basis for the formulation of emergency response plans following disasters.展开更多
To meet the requirements of marine natural gas hydrate exploitation,it is necessary to improve the penetration of completion sand control string in the large curvature borehole.In this study,large curvature test wells...To meet the requirements of marine natural gas hydrate exploitation,it is necessary to improve the penetration of completion sand control string in the large curvature borehole.In this study,large curvature test wells were selected to carry out the running test of sand control string with pre-packed screen.Meanwhile,the running simulation was performed by using the Landmark software.The results show that the sand control packer and screen can be run smoothly in the wellbore with a dogleg angle of more than 20°/30 m and keep the structure stable.Additionally,the comprehensive friction coefficient is 0.4,under which and the simulation shows that the sand control string for hydrate exploitation can be run smoothly.These findings have important guiding significance for running the completion sand control string in natural gas hydrate exploitation.展开更多
To scientifically and effectively conduct comprehensive control of water sources to achieve water safety,the importance,main steps and plan of comprehensive control of ecological environment in water sources were anal...To scientifically and effectively conduct comprehensive control of water sources to achieve water safety,the importance,main steps and plan of comprehensive control of ecological environment in water sources were analyzed on the basis of analyzing the development and protection process of foreign water sources.The results show that for the comprehensive control of water sources,it is needed to pay attention to the accurate grasp of the current environmental quality of water sources and carefully analyze the problems in the ecological environment of water sources.Besides,it is necessary to ensure the water quality and quantity of sources,focus on the implementation of environmental remediation and ecological restoration,implement regional protection of water sources,and combine engineering and non-engineering measures to take comprehensive control of environmental problems.展开更多
In view of social development,the demand for water conservancy engineering applications continues to increase.The number and scale of water conservancy projects in China have been in a state of continuous expansion in...In view of social development,the demand for water conservancy engineering applications continues to increase.The number and scale of water conservancy projects in China have been in a state of continuous expansion in recent years.As a result,how to achieve efficient testing and effective control of the quality of water conservancy projects has always been a topic of discussion in the field of water conservancy engineering in our country.This paper summarizes the application of non-destructive testing technology in the quality testing and control of water conservancy projects.On the basis of explaining the connotation and application advantages of non-destructive testing technology,the non-destructive testing application strategies for concrete strength,steel corrosion and shallow cracks in water conservancy projects were studied.展开更多
In recent years,the scale of China’s highway projects have been expanding.However,in real life,road construction projects in some places have not passed professional and rigorous inspections,resulting in various qual...In recent years,the scale of China’s highway projects have been expanding.However,in real life,road construction projects in some places have not passed professional and rigorous inspections,resulting in various quality problems,and seriously affecting the safety of drivers and pedestrians.This paper analyzes the current situation of highway engineering test and detection,expounds the application of new technologies for highway engineering test and detection.In this paper,a case study was carried out on ground penetrating radar(GPR),which aims to improve highway engineering test and detection and provide reference for reducing highway safety risks.展开更多
Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example t...Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example to analyze deep foundation pit excavation technology,including the nature of this construction project,the main technical measures in the construction of deep foundation pit,and the analysis of the safety risk prevention and control measures.The purpose of this analysis is to provide scientific reference for the construction quality and safety of deep foundation pits.展开更多
点云配准是实物和场景数字孪生模型构建的关键技术。为了适应航空工业高效、精确的虚实结合工业模式,提出了基于快速点特征直方图FPFH(Fast Point Feature Histogram)特征识别配准算法的数字孪生模型构建方法。该方法在保障精确性的前提...点云配准是实物和场景数字孪生模型构建的关键技术。为了适应航空工业高效、精确的虚实结合工业模式,提出了基于快速点特征直方图FPFH(Fast Point Feature Histogram)特征识别配准算法的数字孪生模型构建方法。该方法在保障精确性的前提下,通过数字化检测、信息采集、数据处理与融合,构建物理与虚拟高效互通的数字孪生模型。最后,以燃气涡轮式航空发动机中尾喷管风扇类零件为实例,验证该方法应用于该类发动机零件用于构建数字孪生模型的可行性,并最终将该方法作用于整个涡扇发动机。展开更多
基金supported by the project of the China Geological Survey(No.DD20221746)the National Natural Science Foundation of China(Grant Nos.41101086)。
文摘Xinqiao Gully is located in the area of the 2008 Wenchuan M_(s)8.0 earthquake in Sichuan province,China.Based on the investigation of the 2023"6-26"Xinqiao Gully debris flow event,this study assessed the effectiveness of the debris flow control project and evaluated the debris flow hazards.Through field investigation and numerical simulation methods,the indicators of flow intensity reduction rate and storage capacity fullness were proposed to quantify the effectiveness of the engineering measures in the debris flow event.The simulation results show that the debris flow control project reduced the flow intensity by41.05%to 64.61%.The storage capacity of the dam decreases gradually from upstream to the mouth of the gully,thus effectively intercepting and controlling the debris flow.By evaluating the debris flow of different recurrence intervals,further measures are recommended for managing debris flow events.
基金This work was supported in part by the Science and Technology Major Project of Guangxi under Grant AA22068001in part by the Key Research and Development Program of Guangxi AB21196029+3 种基金in part by the Project of National Natural Science Foundation of China 51965012in part by the Scientific Research and TechnologyDevelopment in Liuzhou 2022AAA0102,2021AAA0104 and 2021AAA0112in part by Agricultural Science and Technology Innovation and Extension Special Project of Jiangsu Province NJ2021-21,in part by the Guangxi Key Laboratory of Manufacturing System and Advanced Manufacturing Technology,in part by the Guilin University of Electronic Technology 20-065-40-004Zin part by the Innovation Project of GUET Graduate Education 2022YCXS017.
文摘The reduction of fuel consumption in engines is always considered of vital importance.Along these lines,in this work,this goal was attained by optimizing the heavy-duty commercial vehicle engine control strategy.More specifically,at first,a general first principles model for heavy-duty commercial vehicles and a transient fuel consumptionmodel for heavy-duty commercial vehicles were developed and the parameters were adjusted to fit the empirical data.The accuracy of the proposed modelwas demonstrated fromthe stage and the final results.Next,the control optimization problem resulting in low fuel consumption in heavy commercial vehicles was described,with minimal fuel usage as the optimization goal and throttle opening as the control variable.Then,a time-continuous engine management approach was assessed.Next,the factors that influence low fuel consumption in heavy-duty commercial vehicles were systematically examined.To reduce the computing complexity,the control strategies related to the time constraints of the engine were parametrized using three different methods.The most effective solution was obtained by applying a global optimization strategy because the constrained optimization problem was nonlinear.Finally,the effectiveness of the low-fuel consumption engine control strategy was demonstrated by comparing the simulated and field test results.
基金supported by the National Natural Science Foundation of China(41977258)the National Key Research and Development Program of China(2017YFC1501005 and 2018YFC1504704)。
文摘Determining the main controlling factors of earthquake-triggered geohazards is a prerequisite for studying earthquake geohazards and post-disaster emergency response.By studying these factors,the geomorphic and geological factors controlling the nature,condition,and distribution of earthquake-induced geohazards can be analyzed.Such insights facilitate earthquake disaster prediction and emergency response planning.The authors combined field investigations and spatial data analysis to examine geohazards induced by seismic events,examining ten earthquakes including the Wenchuan,Yushu,Lushan events,to elucidate the main control factors of seismic geohazard.The authors observed that seismic geohazard occurrence is usually affected by many factors,among which active nature of the seismogenic fault,seismic peak ground acceleration(PGA),topographic slope and geomorphic height differences,and distance from the fault zone and river system are the most important.Compared with strike-slip earthquakes,thrust earthquakes induce more high-altitude and high-speed remote landslides,which can cause great harm.Slopes of 0°–40°are prone to secondary seismic geohazards,which are mainly concentrated 0–6 km from the river system.Secondary geohazards are not only related to seismogenic fault but also influenced by the associated faults in the earthquake area.The maximum seismic PGA and secondary seismic geohazard number are positively correlated,and the horizontal and vertical ground motions play leading and promoting roles in secondary geohazard formation,respectively.Through the research,the spatial distribution of seismic geohazards is predicted,providing a basis for the formulation of emergency response plans following disasters.
基金supported jointly by one of the major projects of Basic and Applied Basic Research in Guangdong Province“Key Basic Theory Research for Natural Gas Hydrate Trial Production in Shenhu Pilot Test Area”(2020B0301030003)the project from Southern Marine Science&Engineering Guangdong Laboratory Guangzhou City“Research on New Closed Circulation Drilling Technology without Riser”(GML2019ZD0501)the special project for hydrate from China Geological Survey“Trial Production Implementation for Natural Gas Hydrate in Shenhu Pilot Test Area”(DD20190226)。
文摘To meet the requirements of marine natural gas hydrate exploitation,it is necessary to improve the penetration of completion sand control string in the large curvature borehole.In this study,large curvature test wells were selected to carry out the running test of sand control string with pre-packed screen.Meanwhile,the running simulation was performed by using the Landmark software.The results show that the sand control packer and screen can be run smoothly in the wellbore with a dogleg angle of more than 20°/30 m and keep the structure stable.Additionally,the comprehensive friction coefficient is 0.4,under which and the simulation shows that the sand control string for hydrate exploitation can be run smoothly.These findings have important guiding significance for running the completion sand control string in natural gas hydrate exploitation.
基金Supported by the Innovation and Entrepreneurship Training Program for College Students of Shaanxi Province in 2022(S202211396028)Innovation and Entrepreneurship Training Program for College Students of Shaanxi Province in 2021(S202111396068).
文摘To scientifically and effectively conduct comprehensive control of water sources to achieve water safety,the importance,main steps and plan of comprehensive control of ecological environment in water sources were analyzed on the basis of analyzing the development and protection process of foreign water sources.The results show that for the comprehensive control of water sources,it is needed to pay attention to the accurate grasp of the current environmental quality of water sources and carefully analyze the problems in the ecological environment of water sources.Besides,it is necessary to ensure the water quality and quantity of sources,focus on the implementation of environmental remediation and ecological restoration,implement regional protection of water sources,and combine engineering and non-engineering measures to take comprehensive control of environmental problems.
文摘In view of social development,the demand for water conservancy engineering applications continues to increase.The number and scale of water conservancy projects in China have been in a state of continuous expansion in recent years.As a result,how to achieve efficient testing and effective control of the quality of water conservancy projects has always been a topic of discussion in the field of water conservancy engineering in our country.This paper summarizes the application of non-destructive testing technology in the quality testing and control of water conservancy projects.On the basis of explaining the connotation and application advantages of non-destructive testing technology,the non-destructive testing application strategies for concrete strength,steel corrosion and shallow cracks in water conservancy projects were studied.
文摘In recent years,the scale of China’s highway projects have been expanding.However,in real life,road construction projects in some places have not passed professional and rigorous inspections,resulting in various quality problems,and seriously affecting the safety of drivers and pedestrians.This paper analyzes the current situation of highway engineering test and detection,expounds the application of new technologies for highway engineering test and detection.In this paper,a case study was carried out on ground penetrating radar(GPR),which aims to improve highway engineering test and detection and provide reference for reducing highway safety risks.
文摘Deep foundation pit excavation is a basic and key step involved in modern building construction.In order to ensure the construction quality and safety of deep foundation pits,this paper takes a project as an example to analyze deep foundation pit excavation technology,including the nature of this construction project,the main technical measures in the construction of deep foundation pit,and the analysis of the safety risk prevention and control measures.The purpose of this analysis is to provide scientific reference for the construction quality and safety of deep foundation pits.
文摘点云配准是实物和场景数字孪生模型构建的关键技术。为了适应航空工业高效、精确的虚实结合工业模式,提出了基于快速点特征直方图FPFH(Fast Point Feature Histogram)特征识别配准算法的数字孪生模型构建方法。该方法在保障精确性的前提下,通过数字化检测、信息采集、数据处理与融合,构建物理与虚拟高效互通的数字孪生模型。最后,以燃气涡轮式航空发动机中尾喷管风扇类零件为实例,验证该方法应用于该类发动机零件用于构建数字孪生模型的可行性,并最终将该方法作用于整个涡扇发动机。