Underwater multi-target tracking logic and decision (UMTLD) has difficulty resolving multi-target tracking problems for underwater vehicles. Present methods assume factors in UMTLD are uncorrelated, when these are a...Underwater multi-target tracking logic and decision (UMTLD) has difficulty resolving multi-target tracking problems for underwater vehicles. Present methods assume factors in UMTLD are uncorrelated, when these are actually in a complex, interdependent relationship. To provide this, an index set of multi-target tracking decision characteristics and an analytic network process (ANP) model of the UMTLD method was -established. This method brings the index set of multi-target tracking decision into the ANP model, and the optimization multitarket tracking decision is achieved via computation of the resulting supermatrix. The rationality and robustness of decision results increase in simulations by 13% and 47% respectively with analytic hierarchy process (AHP). These results indicate that the ANP method should be the preferred method when UMTLD factors are interdependent.展开更多
The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the su...The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.展开更多
The aim of this paper is to select the best location for the construction of a dry port in Niger which is a land locked country (LLC). Niger is located in the Sahel and has a land area of 1,267,000 square kilometers [...The aim of this paper is to select the best location for the construction of a dry port in Niger which is a land locked country (LLC). Niger is located in the Sahel and has a land area of 1,267,000 square kilometers [1], with the closest port being port of Cotonou in Benin. The transport corridor from Niamey to Cotonou is approximately 1036 km long [2]. It is estimated that this corridor carries about 40 percent of Niger’s overseas trade traffic [3]. In this work, the Analytic Network Process (ANP) model is used to determine the optimal location of the dry port, among three major cities: Niamey (capital city), Dosso and Gaya. From the application of this selection model, Dosso was selected as the best location for the location of the dry port, while Gaya and Niamey were placed second and third respectively. The results obtained in this work strongly confirm the decision of the government of Niger to construct a dry port in Dosso, a project that commenced in 2010 and is still in progress.展开更多
The employment of natural fibres in fused deposition modeling has raised much attention from researchers in finding a suitable formulation for the natural fibre composite filaments.Moreover,selection of suitable natur...The employment of natural fibres in fused deposition modeling has raised much attention from researchers in finding a suitable formulation for the natural fibre composite filaments.Moreover,selection of suitable natural fibres for fused deposition modeling should be performed before the development of the composites.It could not be performed without identifying selection criteria that comprehend both materials and fused deposition modeling process requirements.Therefore,in this study,integration of the Analytic Hierarchy Process(AHP)/Analytic Network Process(ANP)has been introduced in selecting the natural fibres based in different clusters of selection concurrently.The selection process has been performed based on the interdependency among the selection criteria.Pairwise comparison matrices are constructed based on AHP’s hierarchical model and super matrices are constructed based on the ANP’s network model.As a result,flax fibre has ranked at the top of the selection by scored 19.5%from the overall evaluation.Flax fibre has excellent material properties and been found in various natural fibre composite applications.Further investigation is needed to study the compatibility of this fibre to be reinforced with a thermoplastic polymer matrix to develop a resultant natural fibre composite filament for fused deposition modeling.展开更多
This paper explores a fuzzy analytic network process(FANP)approach in identifying the content of manufacturing strategy infrastructural decisions that integrates sustainability and classical manufacturing strategy fra...This paper explores a fuzzy analytic network process(FANP)approach in identifying the content of manufacturing strategy infrastructural decisions that integrates sustainability and classical manufacturing strategy framework with firm size component.The findings are as follows:(1)firms must ensure highquality product requirements with a make-to-order production system;(2)large firms must prioritize decentralization of functional areas but they must also provide higher systems integration of all production-related information to mobilize better communication channels;(3)large firms must employ highly skilled human resources in order to provide strong support on functional areas;and(4)small and medium enterprises must focus on product introduction to the market as a strategy priority area.The main contribution of this paper is the decision-making framework under uncertainty that holistically identifies the decisions that comprise a sustainable manufacturing strategy which may serve as guidelines in improving existing sustainable manufacturing practices or in creating new ones.展开更多
基金Supported by the State Key Laboratory Foundation under Grant No.9140C2304080607the Aviation Science Foundation under Grant No.05F53027
文摘Underwater multi-target tracking logic and decision (UMTLD) has difficulty resolving multi-target tracking problems for underwater vehicles. Present methods assume factors in UMTLD are uncorrelated, when these are actually in a complex, interdependent relationship. To provide this, an index set of multi-target tracking decision characteristics and an analytic network process (ANP) model of the UMTLD method was -established. This method brings the index set of multi-target tracking decision into the ANP model, and the optimization multitarket tracking decision is achieved via computation of the resulting supermatrix. The rationality and robustness of decision results increase in simulations by 13% and 47% respectively with analytic hierarchy process (AHP). These results indicate that the ANP method should be the preferred method when UMTLD factors are interdependent.
文摘The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.
文摘The aim of this paper is to select the best location for the construction of a dry port in Niger which is a land locked country (LLC). Niger is located in the Sahel and has a land area of 1,267,000 square kilometers [1], with the closest port being port of Cotonou in Benin. The transport corridor from Niamey to Cotonou is approximately 1036 km long [2]. It is estimated that this corridor carries about 40 percent of Niger’s overseas trade traffic [3]. In this work, the Analytic Network Process (ANP) model is used to determine the optimal location of the dry port, among three major cities: Niamey (capital city), Dosso and Gaya. From the application of this selection model, Dosso was selected as the best location for the location of the dry port, while Gaya and Niamey were placed second and third respectively. The results obtained in this work strongly confirm the decision of the government of Niger to construct a dry port in Dosso, a project that commenced in 2010 and is still in progress.
基金Mastura M.T.received financial support from the Ministry of Higher Education Malaysia(https://www.mohe.gov.my/en/services/research/mygrants)Universiti Teknikal Malaysia Melaka through the Fundamental Research Grant Scheme(FRGS/1/2020/FTKMP-CARE/F00456).
文摘The employment of natural fibres in fused deposition modeling has raised much attention from researchers in finding a suitable formulation for the natural fibre composite filaments.Moreover,selection of suitable natural fibres for fused deposition modeling should be performed before the development of the composites.It could not be performed without identifying selection criteria that comprehend both materials and fused deposition modeling process requirements.Therefore,in this study,integration of the Analytic Hierarchy Process(AHP)/Analytic Network Process(ANP)has been introduced in selecting the natural fibres based in different clusters of selection concurrently.The selection process has been performed based on the interdependency among the selection criteria.Pairwise comparison matrices are constructed based on AHP’s hierarchical model and super matrices are constructed based on the ANP’s network model.As a result,flax fibre has ranked at the top of the selection by scored 19.5%from the overall evaluation.Flax fibre has excellent material properties and been found in various natural fibre composite applications.Further investigation is needed to study the compatibility of this fibre to be reinforced with a thermoplastic polymer matrix to develop a resultant natural fibre composite filament for fused deposition modeling.
基金The support provided by the University of San Carlos in terms of resource use is also recognized.
文摘This paper explores a fuzzy analytic network process(FANP)approach in identifying the content of manufacturing strategy infrastructural decisions that integrates sustainability and classical manufacturing strategy framework with firm size component.The findings are as follows:(1)firms must ensure highquality product requirements with a make-to-order production system;(2)large firms must prioritize decentralization of functional areas but they must also provide higher systems integration of all production-related information to mobilize better communication channels;(3)large firms must employ highly skilled human resources in order to provide strong support on functional areas;and(4)small and medium enterprises must focus on product introduction to the market as a strategy priority area.The main contribution of this paper is the decision-making framework under uncertainty that holistically identifies the decisions that comprise a sustainable manufacturing strategy which may serve as guidelines in improving existing sustainable manufacturing practices or in creating new ones.