Achieving water purity in Poyang Lake has become a major concern in recent years, thus appropriate evaluation of spatial and temporal water quality variations has become essential. Variations in 11 water quality param...Achieving water purity in Poyang Lake has become a major concern in recent years, thus appropriate evaluation of spatial and temporal water quality variations has become essential. Variations in 11 water quality parameters from 15 sampling sites in Poyang Lake were investigated from 2009 to 2012. An integrative fuzzy variable evaluation(IFVE) model based on fuzzy theory and variable weights was developed to measure variations in water quality. Results showed that: 1) only chlorophyll-a concentration and Secchi depth differed significantly among the 15 sampling sites(P < 0.01), whereas the 11 water quality parameters under investigation differed significantly throughout the seasons(P < 0.01). The annual variations of all water quality variables except for temperature, electrical conductivity, suspended solids and total phosphorus were considerable(P < 0.05). 2) The IFVE model was reasonable and flexible in evaluating water quality status and any possible ′bucket effect′. The model fully considered the influences of extremely poor indices on overall water quality. 3) A spatial analysis indicated that anthropogenic activities(particularly industrial sewage and dredging) and lake bed topography might directly affect water quality in Poyang Lake. Meanwhile, hydrological status and sewage discharged into the lake might be responsible for seasonal water quality variations.展开更多
The jetting and cementing bucket platform (JCBP) is a new type offshore oil-drilling platform. This paper aims to establish an analysis method for calculating the dynamic response of this platform. Based on the theo...The jetting and cementing bucket platform (JCBP) is a new type offshore oil-drilling platform. This paper aims to establish an analysis method for calculating the dynamic response of this platform. Based on the theory of elastic half space, the dynamic stiffness and damping of the platform' s foundation were obtained and attached to the end of the platform' s main jackets as a boundary condition. Then using finite element method (FEM), the dynamic response of the platform due to wave and current loading was calculated. Furthermore, the whole platform' s finite element model was established and the dynamic response of the platform was calculated. The numerical results demonstrate that the present method by the usage of elastic half space theory and FEM is simple and it is reliable and efficient to calculate dynamic behavior of the platform in response to wave and current loading.展开更多
基金Under the auspices of National Basic Research Program of China(No.2012CB417006)National Natural Science Foundation of China(No.41271500,41571107,41601041)
文摘Achieving water purity in Poyang Lake has become a major concern in recent years, thus appropriate evaluation of spatial and temporal water quality variations has become essential. Variations in 11 water quality parameters from 15 sampling sites in Poyang Lake were investigated from 2009 to 2012. An integrative fuzzy variable evaluation(IFVE) model based on fuzzy theory and variable weights was developed to measure variations in water quality. Results showed that: 1) only chlorophyll-a concentration and Secchi depth differed significantly among the 15 sampling sites(P < 0.01), whereas the 11 water quality parameters under investigation differed significantly throughout the seasons(P < 0.01). The annual variations of all water quality variables except for temperature, electrical conductivity, suspended solids and total phosphorus were considerable(P < 0.05). 2) The IFVE model was reasonable and flexible in evaluating water quality status and any possible ′bucket effect′. The model fully considered the influences of extremely poor indices on overall water quality. 3) A spatial analysis indicated that anthropogenic activities(particularly industrial sewage and dredging) and lake bed topography might directly affect water quality in Poyang Lake. Meanwhile, hydrological status and sewage discharged into the lake might be responsible for seasonal water quality variations.
文摘The jetting and cementing bucket platform (JCBP) is a new type offshore oil-drilling platform. This paper aims to establish an analysis method for calculating the dynamic response of this platform. Based on the theory of elastic half space, the dynamic stiffness and damping of the platform' s foundation were obtained and attached to the end of the platform' s main jackets as a boundary condition. Then using finite element method (FEM), the dynamic response of the platform due to wave and current loading was calculated. Furthermore, the whole platform' s finite element model was established and the dynamic response of the platform was calculated. The numerical results demonstrate that the present method by the usage of elastic half space theory and FEM is simple and it is reliable and efficient to calculate dynamic behavior of the platform in response to wave and current loading.