The simplified transfer function diagram block for a monitor automatic gauge control (Mon-AGC) system of strip steel rolling process was investigated. The new notion of strip sample length was given. In this way, th...The simplified transfer function diagram block for a monitor automatic gauge control (Mon-AGC) system of strip steel rolling process was investigated. The new notion of strip sample length was given. In this way, the delay time varying with the rolling speed was evaded. After a Smith predictor was used to monitor the AGC system, the control laws were deduced for both proportional and integral regulators. The control strategies showed that by choosing the controller parameter P=∞ for both control algo- rithms each regulator could compensate the whole strip gage error in the first control step. The result shows that the integral algo- rithm is more controllable for the system regulating process and has a better steady-state precision than the proportional regulator. Compared with the traditional control strategy, the new control laws have a faster response speed and a hieher steadv-state precision.展开更多
Beacuse the practical mathematic model of rolling process can't be built accurately,this paper established an expert system to control the rolling steels' gauge by adjusting the setup roll open, which combined...Beacuse the practical mathematic model of rolling process can't be built accurately,this paper established an expert system to control the rolling steels' gauge by adjusting the setup roll open, which combined the experience of theoreticians and operators. The system applied the expression method of rule-skeleton+rule-body', and selected an appropriate non-exact reference model and self-study algorithm. The whole system, including auxiliary routes, is designed in Borland C++. Some experiments on this system have been done, and a good result has been achieved.展开更多
Essentially, it is significant to supply the consumer with reliable and sufficient power. Since, power quality is measured by the consistency in frequency and power flow between control areas. Thus, in a power system ...Essentially, it is significant to supply the consumer with reliable and sufficient power. Since, power quality is measured by the consistency in frequency and power flow between control areas. Thus, in a power system operation and control,automatic generation control(AGC) plays a crucial role. In this paper, multi-area(Five areas: area 1, area 2, area 3, area 4 and area 5) reheat thermal power systems are considered with proportional-integral-derivative(PID) controller as a supplementary controller. Each area in the investigated power system is equipped with appropriate governor unit, turbine with reheater unit, generator and speed regulator unit. The PID controller parameters are optimized by considering nature bio-inspired firefly algorithm(FFA). The experimental results demonstrated the comparison of the proposed system performance(FFA-PID)with optimized PID controller based genetic algorithm(GAPID) and particle swarm optimization(PSO) technique(PSOPID) for the same investigated power system. The results proved the efficiency of employing the integral time absolute error(ITAE) cost function with one percent step load perturbation(1 % SLP) in area 1. The proposed system based FFA achieved the least settling time compared to using the GA or the PSO algorithms, while, it attained good results with respect to the peak overshoot/undershoot. In addition, the FFA performance is improved with the increased number of iterations which outperformed the other optimization algorithms based controller.展开更多
Present day power scenarios demand a high quality uninterrupted power supply and needs environmental issues to be addressed. Both concerns can be dealt with by the introduction of the renewable sources to the existing...Present day power scenarios demand a high quality uninterrupted power supply and needs environmental issues to be addressed. Both concerns can be dealt with by the introduction of the renewable sources to the existing power system. Thus, automatic generation control(AGC) with diverse renewable sources and a modified-cascaded controller are presented in the paper.Also, a new hybrid scheme of the improved teaching learning based optimization-differential evolution(hITLBO-DE) algorithm is applied for providing optimization of controller parameters. A study of the system with a technique such as TLBO applied to a proportional integral derivative(PID), integral double derivative(IDD) and PIDD is compared to hITLBO-DE tuned cascaded controller with dynamic load change.The suggested methodology has been extensively applied to a 2-area system with a diverse source power system with various operation time non-linearities such as dead-band of, generation rate constraint and reheat thermal units. The multi-area system with reheat thermal plants, hydel plants and a unit of a wind-diesel combination is tested with the cascaded controller scheme with a different controller setting for each area. The variation of the load is taken within 1% to 5% of the connected load and robustness analysis is shown by modifying essential factors simultaneously by± 30%. Finally, the proposed scheme of controller and optimization technique is also tested with a 5-equal area thermal system with non-linearities. The simulation results demonstrate the superiority of the proposed controller and algorithm under a dynamically changing load.展开更多
This paper presented an automatic gain control (AGC) circuit suitable for FM/cw ladar. The proposed architecture was based on two-stage variable gain amplifier (VGA) chain with a novel DC offset canceller circuit,...This paper presented an automatic gain control (AGC) circuit suitable for FM/cw ladar. The proposed architecture was based on two-stage variable gain amplifier (VGA) chain with a novel DC offset canceller circuit, which contained an improved Gilbert cell and a Gm-C feedback loop. To keep the VGA with a linearity in dB characteristic, an improved exponential gain control circuit was introduced. The AGC was implemented in 0.18 gm standard CMOS process. Simulation and measurement results verified that its gain ranged from -20 dB to 30 dB, and band- width ranged from 100 kHz to 10 MHz. Its power consumption was 19.8 mW under a voltage supply of 3.3 V.展开更多
The performance of Smith prediction monitoring automatic gauge control(AGC) system is influenced by model mismatching greatly in strip rolling process. Aiming at this problem, a feedback-assisted iterative learning co...The performance of Smith prediction monitoring automatic gauge control(AGC) system is influenced by model mismatching greatly in strip rolling process. Aiming at this problem, a feedback-assisted iterative learning control strategy, which learned unknown modeling error by using previous control information repeatedly, was introduced into Smith prediction monitoring AGC system. Firstly, conventional Smith predictor and improved Smith predictor with PI-P controller were analyzed. Secondly, on the basis of establishing of feedback-assisted iterative learning control strategy for improved Smith predictor, process control signal update law and control error were deduced, then convergence condition of this strategy was put forward and proved. Finally, after modeling the automatic position control system, the PI-P Smith prediction monitoring AGC system with feedback-assisted iterative learning control was researched through simulation. Simulation results indicate that this system remains stable during model mismatching. The robustness and response of monitoring AGC is improved by development of feedback-assisted iterative learning control strategy for PI-P Smith predictor.展开更多
Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid...Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid planning and construction, and will make a heavy impact on the safe and reliable operation of power systems. To deal with the diff iculties of large scale wind power dispatch, this paper presents a new automatic generation control (AGC) scheme that involves the participation of wind farms. The scheme is based on ultra-short-term wind power forecast. The author establishes a generation output distribution optimization mode for the power system with wind farms and verif ies the feasibility of the scheme by an example.展开更多
基金supported by the National High-Tech Research and Development Program of China (No.2003AA33G010)
文摘The simplified transfer function diagram block for a monitor automatic gauge control (Mon-AGC) system of strip steel rolling process was investigated. The new notion of strip sample length was given. In this way, the delay time varying with the rolling speed was evaded. After a Smith predictor was used to monitor the AGC system, the control laws were deduced for both proportional and integral regulators. The control strategies showed that by choosing the controller parameter P=∞ for both control algo- rithms each regulator could compensate the whole strip gage error in the first control step. The result shows that the integral algo- rithm is more controllable for the system regulating process and has a better steady-state precision than the proportional regulator. Compared with the traditional control strategy, the new control laws have a faster response speed and a hieher steadv-state precision.
文摘Beacuse the practical mathematic model of rolling process can't be built accurately,this paper established an expert system to control the rolling steels' gauge by adjusting the setup roll open, which combined the experience of theoreticians and operators. The system applied the expression method of rule-skeleton+rule-body', and selected an appropriate non-exact reference model and self-study algorithm. The whole system, including auxiliary routes, is designed in Borland C++. Some experiments on this system have been done, and a good result has been achieved.
文摘Essentially, it is significant to supply the consumer with reliable and sufficient power. Since, power quality is measured by the consistency in frequency and power flow between control areas. Thus, in a power system operation and control,automatic generation control(AGC) plays a crucial role. In this paper, multi-area(Five areas: area 1, area 2, area 3, area 4 and area 5) reheat thermal power systems are considered with proportional-integral-derivative(PID) controller as a supplementary controller. Each area in the investigated power system is equipped with appropriate governor unit, turbine with reheater unit, generator and speed regulator unit. The PID controller parameters are optimized by considering nature bio-inspired firefly algorithm(FFA). The experimental results demonstrated the comparison of the proposed system performance(FFA-PID)with optimized PID controller based genetic algorithm(GAPID) and particle swarm optimization(PSO) technique(PSOPID) for the same investigated power system. The results proved the efficiency of employing the integral time absolute error(ITAE) cost function with one percent step load perturbation(1 % SLP) in area 1. The proposed system based FFA achieved the least settling time compared to using the GA or the PSO algorithms, while, it attained good results with respect to the peak overshoot/undershoot. In addition, the FFA performance is improved with the increased number of iterations which outperformed the other optimization algorithms based controller.
文摘Present day power scenarios demand a high quality uninterrupted power supply and needs environmental issues to be addressed. Both concerns can be dealt with by the introduction of the renewable sources to the existing power system. Thus, automatic generation control(AGC) with diverse renewable sources and a modified-cascaded controller are presented in the paper.Also, a new hybrid scheme of the improved teaching learning based optimization-differential evolution(hITLBO-DE) algorithm is applied for providing optimization of controller parameters. A study of the system with a technique such as TLBO applied to a proportional integral derivative(PID), integral double derivative(IDD) and PIDD is compared to hITLBO-DE tuned cascaded controller with dynamic load change.The suggested methodology has been extensively applied to a 2-area system with a diverse source power system with various operation time non-linearities such as dead-band of, generation rate constraint and reheat thermal units. The multi-area system with reheat thermal plants, hydel plants and a unit of a wind-diesel combination is tested with the cascaded controller scheme with a different controller setting for each area. The variation of the load is taken within 1% to 5% of the connected load and robustness analysis is shown by modifying essential factors simultaneously by± 30%. Finally, the proposed scheme of controller and optimization technique is also tested with a 5-equal area thermal system with non-linearities. The simulation results demonstrate the superiority of the proposed controller and algorithm under a dynamically changing load.
基金supported by National Natural Science Foundation of China(61100159,61233007,61503371)National High Technology Research and Development Program of China(863 Program)(2011AA040103)+2 种基金Foundation of Chinese Academy of Sciences(KGCX2-EW-104)the Strategic Priority Research Program of the Chinese Academy of Sciences(XDA06021100)the Cross-disciplinary Collaborative Teams Program for Science,Technology,and Innovation of Chinese Academy of Sciences-Network and System Technologies for Security Monitoring and Information Interaction in Smart Grid,Energy Management System for Micro-smart Grid
基金Supported by the National Science and Technology Major Project of the Ministry of Science and Technology of China(No.2012ZX03004008)
文摘This paper presented an automatic gain control (AGC) circuit suitable for FM/cw ladar. The proposed architecture was based on two-stage variable gain amplifier (VGA) chain with a novel DC offset canceller circuit, which contained an improved Gilbert cell and a Gm-C feedback loop. To keep the VGA with a linearity in dB characteristic, an improved exponential gain control circuit was introduced. The AGC was implemented in 0.18 gm standard CMOS process. Simulation and measurement results verified that its gain ranged from -20 dB to 30 dB, and band- width ranged from 100 kHz to 10 MHz. Its power consumption was 19.8 mW under a voltage supply of 3.3 V.
基金Project(51074051)supported by the National Natural Science Foundation of China
文摘The performance of Smith prediction monitoring automatic gauge control(AGC) system is influenced by model mismatching greatly in strip rolling process. Aiming at this problem, a feedback-assisted iterative learning control strategy, which learned unknown modeling error by using previous control information repeatedly, was introduced into Smith prediction monitoring AGC system. Firstly, conventional Smith predictor and improved Smith predictor with PI-P controller were analyzed. Secondly, on the basis of establishing of feedback-assisted iterative learning control strategy for improved Smith predictor, process control signal update law and control error were deduced, then convergence condition of this strategy was put forward and proved. Finally, after modeling the automatic position control system, the PI-P Smith prediction monitoring AGC system with feedback-assisted iterative learning control was researched through simulation. Simulation results indicate that this system remains stable during model mismatching. The robustness and response of monitoring AGC is improved by development of feedback-assisted iterative learning control strategy for PI-P Smith predictor.
文摘Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid planning and construction, and will make a heavy impact on the safe and reliable operation of power systems. To deal with the diff iculties of large scale wind power dispatch, this paper presents a new automatic generation control (AGC) scheme that involves the participation of wind farms. The scheme is based on ultra-short-term wind power forecast. The author establishes a generation output distribution optimization mode for the power system with wind farms and verif ies the feasibility of the scheme by an example.