The high-speed railway construction involves multiple professional fields,such as railway design,construction,and supervision.This paper architects the"BIM+"project refined management platform,designs the pl...The high-speed railway construction involves multiple professional fields,such as railway design,construction,and supervision.This paper architects the"BIM+"project refined management platform,designs the platform's logical architecture,physical architecture,and solves several key technology difficulties.This"BIM+"platform has been applied on the Jingxiong Bridge Project and achieved all-round,whole-process and multi-management of high-speed railway engineering construction.It significantly improves the level of construction management,and plays a role in promoting the development of high-speed railway construction informatization.展开更多
为实现BIM(Building Information Modeling)+GIS(Geographic Information System)技术在铁路四电工程建造过程中的应用,提出铁路四电工程智能建造方案。通过构建BIM族库、参数化建模、模型轻量化等技术手段,实现模型快速生成及项目各阶...为实现BIM(Building Information Modeling)+GIS(Geographic Information System)技术在铁路四电工程建造过程中的应用,提出铁路四电工程智能建造方案。通过构建BIM族库、参数化建模、模型轻量化等技术手段,实现模型快速生成及项目各阶段数据的集成共享;设计BIM+GIS管理平台,将项目管理过程中的生产要素信息、管理要素信息与BIM模型信息、GIS技术深度融合,满足不同管理部门、不同层级用户的三维可视化、数字化、全要素信息建设管理精益化需求,实现铁路四电工程项目的数字化交付。应用表明,该方案可为推动BIM+GIS技术在铁路四电工程的应用发展提供技术支撑。展开更多
为了让电力事业更好适应时代的发展需求,在建筑信息模型(Building information model,BIM)平台不断发展的大背景之下,对于电力工程造价管理系统进行了研究分析。首先简要介绍了BIM技术的应用特点及其实际情况,对于BIM技术的可视性、协...为了让电力事业更好适应时代的发展需求,在建筑信息模型(Building information model,BIM)平台不断发展的大背景之下,对于电力工程造价管理系统进行了研究分析。首先简要介绍了BIM技术的应用特点及其实际情况,对于BIM技术的可视性、协调性、模拟性展开研究分析。探讨了BIM技术在电力工程造价中的应用价值。运用对比分析的方式,阐述了现阶段电力工程造价控制过程中存在的问题,结合BIM技术的具体优势,分析了该项技术在电力工程造价管理中的应用价值。合理运用BIM技术,能够实现对于电力系统运行全过程的有效掌控,也能够通过构建数据信息平台的方式,对工程造价进行有效控制,该项技术在施工阶段以及竣工阶段都有较大的应用价值。展开更多
基金supported by China State Railway Group Co.,Ltd.Science and Technology Research and Development Plan(K2021G025).
文摘The high-speed railway construction involves multiple professional fields,such as railway design,construction,and supervision.This paper architects the"BIM+"project refined management platform,designs the platform's logical architecture,physical architecture,and solves several key technology difficulties.This"BIM+"platform has been applied on the Jingxiong Bridge Project and achieved all-round,whole-process and multi-management of high-speed railway engineering construction.It significantly improves the level of construction management,and plays a role in promoting the development of high-speed railway construction informatization.
文摘为实现BIM(Building Information Modeling)+GIS(Geographic Information System)技术在铁路四电工程建造过程中的应用,提出铁路四电工程智能建造方案。通过构建BIM族库、参数化建模、模型轻量化等技术手段,实现模型快速生成及项目各阶段数据的集成共享;设计BIM+GIS管理平台,将项目管理过程中的生产要素信息、管理要素信息与BIM模型信息、GIS技术深度融合,满足不同管理部门、不同层级用户的三维可视化、数字化、全要素信息建设管理精益化需求,实现铁路四电工程项目的数字化交付。应用表明,该方案可为推动BIM+GIS技术在铁路四电工程的应用发展提供技术支撑。
文摘为了让电力事业更好适应时代的发展需求,在建筑信息模型(Building information model,BIM)平台不断发展的大背景之下,对于电力工程造价管理系统进行了研究分析。首先简要介绍了BIM技术的应用特点及其实际情况,对于BIM技术的可视性、协调性、模拟性展开研究分析。探讨了BIM技术在电力工程造价中的应用价值。运用对比分析的方式,阐述了现阶段电力工程造价控制过程中存在的问题,结合BIM技术的具体优势,分析了该项技术在电力工程造价管理中的应用价值。合理运用BIM技术,能够实现对于电力系统运行全过程的有效掌控,也能够通过构建数据信息平台的方式,对工程造价进行有效控制,该项技术在施工阶段以及竣工阶段都有较大的应用价值。