期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
坑槽土方开挖工程量计算与校验——基于EXCEL和BIM3D模型 被引量:5
1
作者 郝存河 王哲 王亚 《工程造价管理》 2022年第4期79-85,共7页
随着BIM3D和4D(3D+Time)模型的发展与广泛应用,对模型自动计算结果的校验与对建模参数的修正成为保证建模精准性的关键。文章基于EXCEL链接、计算和BIM3D模型自动计算及查量功能,根据土方工程计算规范《房屋建筑与装饰工程工程量计算规... 随着BIM3D和4D(3D+Time)模型的发展与广泛应用,对模型自动计算结果的校验与对建模参数的修正成为保证建模精准性的关键。文章基于EXCEL链接、计算和BIM3D模型自动计算及查量功能,根据土方工程计算规范《房屋建筑与装饰工程工程量计算规范》(GB 50854-2013)与定额工程量计算规则《全国统一建筑工程基础定额河北省消耗定额》(2012)计算校验的基坑与沟槽挖方工程量,并与BIM3D模型自动计算的挖方量、扣减交叉量对比校验,以为工程量清单及控制价提供依据;借助布尔逻辑运算对基坑与沟槽的实际挖方量计算方法进行梳理优化,通过EXCLE的链接与自动计算功能进行计算并与BIM3D模型自动计算的挖方量、扣减交叉量对比校验,不仅为企业投标挖方报价提供了算量参考,而且也为土方开挖方式的选择及既定机械开挖的租赁或机械调配方案的优化提供了算量方法借鉴。 展开更多
关键词 挖方量 EXCEL bim3d模型 布尔运算
下载PDF
Integration of Digital Technologies into Underground Utility Asset Management
2
作者 Eronmonsele Esekhaigbe Emrah Kazan Mumtaz Usmen 《Open Journal of Civil Engineering》 2020年第4期403-428,共26页
Installation, detection, maintenance, mapping, and management of underground utility assets present challenges to owners, engineers and contractors. Industry-wide practices include the use of geophysical and similar t... Installation, detection, maintenance, mapping, and management of underground utility assets present challenges to owners, engineers and contractors. Industry-wide practices include the use of geophysical and similar technologies to determine depth and location, and 2D as-built plans integrated with GIS databases for information management. The feasibility of incorporating 3D BIM models of the subsurface to replace the 2D plans to improve visualization and data management is examined in this paper. Obtaining an accurate image of the underground infrastructure would help minimize excavation accidents due to equipment-utility collisions and prevent property damage. Further, the inclusion of automated data collection and sharing features realized through BIM technology can enhance operations of smart cities. The research methodology consists of a state-of-the-art review of the current underground utility management systems, combined with statistical analysis of survey responses received from utility providers and one-call centers in the U.S. Three categories of utility practices are identified based on the level of digital technology integration. It is found that a vast majority of utility firms have adopted GIS databases with 2D plans, depth and other asset information, while a smaller percentage of providers have achieved full GIS-BIM in<span style="font-family:Verdana;">tegration, incorporating a wide range of asset data. Future progress on</span><span style="font-family:Verdana;"> broader implementation appears to be constrained by the digital literacy of personnel </span><span style="font-family:Verdana;">and high costs of technology acquisition and application. A three-step frame</span><span style="font-family:Verdana;">work for converting 2D plans to 3D BIM models is also presented and discussed. The process model proposed for this purpose allows the utilization of commercially available software with minimal need for additional coding.</span> 展开更多
关键词 Underground Utilities Asset Management Digital Technologies GIS Database 3D BIM model
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部