期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Determination of the Financing Scale,Time Limit and Returns from the Investment in BOT Projects
1
作者 Chen Shouke Wei Zhuobin 《Engineering Sciences》 EI 2008年第1期83-89,共7页
The key aspect to the successful implementation of BOT concept is the raising of finance by project sponsor,so financial engineering techniques and capital structuring skills are required to find the proper mix of deb... The key aspect to the successful implementation of BOT concept is the raising of finance by project sponsor,so financial engineering techniques and capital structuring skills are required to find the proper mix of debt and equity.The capital structure and present a model to determine the equity level from the aspects of financing scale,construction time and return on investment are analyzed.The resulting model can help the sponsor to avoid the capital risk,and offer the government a criterion to evaluate management ability of the sponsor.To show the application and availability of this model,a case study is conducted.Thus,this paper is concern with the determination of financing scale,construction time,and return on investment which would assist the sponsor to ensure that the equity level for optimal capital structure is available prior to the implementation stage in BOT project operation. 展开更多
关键词 capital risk financing scale time limit returns of investment bot project
下载PDF
Two power projects under BOT funding scheme progressing smoothly
2
《Electricity》 1997年第1期48-48,共1页
关键词 bot Two power projects under bot funding scheme progressing smoothly
下载PDF
The SP's first overseas BOT project
3
《Electricity》 2001年第1期43-43,共1页
关键词 bot SP The SP’s first overseas bot project
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部