期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
CAPACITATED LOT SIZING AND SCHEDULING PROBLEMS USING HYBRID GA/TS APPROACHES 被引量:3
1
作者 Yang Honghong Wu ZhimingDepartment of Automation,Shanghai Jiaotong University,Shanghai 200030, China 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2003年第1期21-24,共4页
The capacitated lot sizing and scheduling problem that involves indetermining the production amounts and release dates for several items over a given planning horizonare given to meet dynamic order demand without incu... The capacitated lot sizing and scheduling problem that involves indetermining the production amounts and release dates for several items over a given planning horizonare given to meet dynamic order demand without incurring backloggings. The problem consideringovertime capacity is studied. The mathematical model is presented, and a genetic algorithm (GA)approach is developed to solve the problem. The initial solutions are generated after usingheuristic method. Capacity balancing procedure is employed to stipulate the feasibility of thesolutions. In addition, a technique based on Tabu search (TS) is inserted into the genetic algorithmdeal with the scheduled overtime and help the convergence of algorithm. Computational simulation isconducted to test the efficiency of the proposed hybrid approach, which turns out to improve boththe solution quality and execution speed. 展开更多
关键词 Production planning Capacitated lot sizing Genetic algorithm Tabusearch capacity balancing
下载PDF
Five Major Concerns about China’s Wind Power Development
2
作者 Wu Jiang State Electricity Regulatory Commission Zhu Li 《Electricity》 2010年第3期43-47,共5页
Economic issue is the very focus of China's wind power development.Although all the security problems can be dealt with through technical measures,the compensation for supportive thermal power units and the subsid... Economic issue is the very focus of China's wind power development.Although all the security problems can be dealt with through technical measures,the compensation for supportive thermal power units and the subsidy from economically developed regions to resource-outputting regions would require a higher level of strategic considerations.The core purpose of developing wind energy is to reduce pollutant emissions,so planners should take into account the overall cost of all sides,without touching the bottom of social affordability. 展开更多
关键词 power planning wind power capacity balance auxiliary service
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部