Beijing Daxing International Airport,a major landmark project in China and a new driver for national development,will represent the direction for the development of civil aviation airports in China.The airport,situate...Beijing Daxing International Airport,a major landmark project in China and a new driver for national development,will represent the direction for the development of civil aviation airports in China.The airport,situated in the junction of Nangezhuang,Daxing District,Beijing City and Gu’an County,Hebei Province,has seen its north terminal area and north terminal built in the first phase,covering a total construction area of about 1.4 million m2.The north terminal area is designed to have an annual throughput of 45 million passengers.展开更多
THE extension of the terminal at the Beijing Capital International Airport, one of the key construction projects of the Ninth National Five Year Plan, was completed successfully in September 1999. The Hshaped new term...THE extension of the terminal at the Beijing Capital International Airport, one of the key construction projects of the Ninth National Five Year Plan, was completed successfully in September 1999. The Hshaped new terminal building covers a total area of 336 thousand square meters -- four times that of the old one. It stands three floors above ground (part of it four floors) and one floor underground. Its opening upgrades peak time展开更多
文摘Beijing Daxing International Airport,a major landmark project in China and a new driver for national development,will represent the direction for the development of civil aviation airports in China.The airport,situated in the junction of Nangezhuang,Daxing District,Beijing City and Gu’an County,Hebei Province,has seen its north terminal area and north terminal built in the first phase,covering a total construction area of about 1.4 million m2.The north terminal area is designed to have an annual throughput of 45 million passengers.
文摘THE extension of the terminal at the Beijing Capital International Airport, one of the key construction projects of the Ninth National Five Year Plan, was completed successfully in September 1999. The Hshaped new terminal building covers a total area of 336 thousand square meters -- four times that of the old one. It stands three floors above ground (part of it four floors) and one floor underground. Its opening upgrades peak time