期刊文献+
共找到44篇文章
< 1 2 3 >
每页显示 20 50 100
Effectiveness of groundwater extraction in Beijing since the ingauration of the first phase of the South-to-North Water Diversion Project, China
1
作者 Yuan-yuan Gao Qing-yu Sun +1 位作者 Ai-xin Wen Yan-pei Cheng 《Journal of Groundwater Science and Engineering》 2023年第3期294-307,共14页
This study assess the effectiveness of groundwater pressure extraction in Beijing since the opening of the first phase of the South-to-North Water Diversion Project,using survey and evaluation methods.Firstly,an analy... This study assess the effectiveness of groundwater pressure extraction in Beijing since the opening of the first phase of the South-to-North Water Diversion Project,using survey and evaluation methods.Firstly,an analysis of water consumption structure and the usage of diverted river water in Beijing in recent years was conducted.Secondly,the volume of groundwater pressure extraction in Beijing after the 33 project's inauguration was examined,revealing a decrease from 1.96 billion m^(3) in 2014 to 1.35 billion m^(3) in 2020.The proportion of water supply reduced from 52.3%in 2014 to 33.3%in 2020,leading to an optimized water supply structure.By the end of 2020,groundwater pressure extraction in Beijing is estimated at 446 million m3,with a substantial reduction in over-exploitation of groundwater.Groundwater resources have been effectively replenished,and the strategic reserve capacity has been enhanced.Furthermore,this study evaluates the change in groundwater levels as an indicator of the effectiveness of pressure extraction.The declining trend of groundwater levels in Beijing has been effectively mitigated,and there has been a consistent rebound in groundwater levels over the past five years. 展开更多
关键词 beijing City south-to-north water diversion Groundwater Over-exploitation Groundwater Pressure Extraction
下载PDF
Spatio-temporal distribution of phytoplankton in the Danjiangkou Reservoir, a water source area for the South-to-North Water Diversion Project (Middle Route), China 被引量:12
2
作者 殷大聪 郑凌凌 宋立荣 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2011年第3期531-540,共10页
One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR ... One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR area before water diversion, as well as to estimate potential risks of water quality after water diversion, we conducted an investigation on phytoplankton in the DJKR from August 2008 to May 2009. The investigation included 10 sampling sites, each with four depths of 0.5, 5, 10, and 20 m. In this study, 117 taxa belonging to 76 genera were identified, consisting of diatoms (39 taxa), green algae (47 taxa), blue-green algae (19 taxa), and others (12 taxa). Annual average phytoplankton abundance was 2.01×10^6 ind./L, and the highest value was 14.72 ×10^6 ind/L (at site 3 in August 2008). Phytoplankton abundance in front of the Danjiangkou Dam (DJKD) was higher than that of the Danjiang Reservoir Basin. Phytoplankton distribution showed a vertical declining trend from 0.5 m to 20 m at most sites in August 2008 (especially at sites of 1, 2, 4 and 10), but no distinct pattern in other sampling months. In December 2008 and March 2009, Stephanodiseus sp. was the most abundant species, amounting to 55.23% and 72.34%, respectively. We propose that high abundance ofStephanodiscus sp. may have contributed greatly to the frequent occurrence of Stephanodiscus sp. blooms in middle-low reaches of the Hanjiang River during the early spring of 2009. In comparison with previous studies conducted from 1992 to 2006, annual average phytoplankton density, green algae and blue-green algae species, as well as major nutrient concentrations increased, while phytoplankton diversity indices declined. This indicates a gradual decline in water quality. More research should be conducted and countermeasures taken to prevent further deterioration of water quality in the DJKR. 展开更多
关键词 Danjiangkou Reservoir PHYTOPLANKTON south-to-north water diversion project EUTROPHICATION
下载PDF
Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North Water Diversion Project 被引量:3
3
作者 Jing-chun FENG Lei LI +4 位作者 Nan YANG Yu-zhen HONG Min PANG Xiong YAO Li-cheng WANG 《Water Science and Engineering》 EI CAS 2011年第2期225-236,共12页
Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the sy... Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields. 展开更多
关键词 multi-resource constraints south-to-north water diversion project project portfolio critical chain
下载PDF
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period 被引量:3
4
作者 Feng Jingchun Zhou Yang +2 位作者 Hong Yuzhen Zhao Shixin Ren Xiaoqiang 《Water Science and Engineering》 EI CAS 2008年第4期107-113,共7页
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connectio... In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up. 展开更多
关键词 south-to-north water diversion project reliability model management chain parallel connection series connection
下载PDF
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:3
5
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification Middle Route of the south-to-north water diversion project(MR-SNWDP) China
下载PDF
Wet-Dry Runoff Correlation in Western Route of South-to-North Water Diversion Project,China 被引量:2
6
作者 HUANG Xiao-rong ZHAO Jing-wei YANG Peng-peng 《Journal of Mountain Science》 SCIE CSCD 2015年第3期592-603,共12页
The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upst... The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upstream of the Yellow River (water- importing area). The long-term hydrologieal data from 14 stream gauging stations in the Western Route area and techniques including the pre-whitening approach, non-parametric test, Bayes, law, variance analysis extrapolation, and Wavelet Analysis are applied to identify the streamflow eharacteristics and trends, streamflow time series cross-correlations, wetness-dryness encountering probability, and periodicities that occurred over the last 50 years. The results show that the water-exporting area, water- importing area, and the streteh downstream of the water-exporting have synehronization in high-low flow relationship, whereas they display non- synchronization in long-term evolution. This corresponds to the complicated and variable climate of the plateau region. There is no obvious increasing or decreasing trend in runoff at any gauging station. The best hydrological eompensation probability for rivers where water is diverted is about 25% to lO%, and those rivers influenced significantly by diversion are the Jinsha and Yalong rivers. Proper planning and design of compensation reservoirs for the water-exporting area and stretch downstream of the water- exporting area can increase the hydrological compensation possibility from water-exporting area to the water-importing area, and reduce the impact on the stretch of river downstream of the water- exporting area. 展开更多
关键词 south-to-north water diversion project Yangtze River Streamflow Encounter probability Correlation coefficient Cycle Hydrologicalcompensation
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
7
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model south-to-north water diversion project
下载PDF
IMPACTS OF THE SOUTH-TO-NORTH WATER DIVERSION PROJECTS (MIDDLE ROUTE)ON THE WATER ENVIRONMENT OF THE MIDDLE AND LOWER REACHES OF THE HANJIANG RIVER
8
作者 FAN Bei-Lin, WAN Jian-Rong, ZHANG Jie and LIN Qiu-Sheng (Yangtze River Scientific Research Institute,River Research Deparment, Wuhan 430010,China) 《水生生物学报》 CAS CSCD 北大核心 2006年第6期643-646,共4页
In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well... In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well as their impacts on the environment of the middle and lower reaches of the Hanjiang River. The results showed that the 95×10 8m 3 water diversion scheme will cause less erosion and water level decrease than the 15×10 8m 3 water diversion scheme. Using a water diversion scheme of 95×10 8m 3, the decrease of water quantity can impact the river hydrodynamic regime substantially and the environments of the middle and lower reaches of the Hanjiang River will be greatly affected. It is therefore necessary to develop new water resources or build projects to meet the need of the environment and the needs for navigation. 展开更多
关键词 south-to-north water diversion project River regime water environment Mathematical model
下载PDF
Water diversion and agricultural production:Evidence from China 被引量:1
9
作者 YANG Rui XU Hang 《Journal of Integrative Agriculture》 SCIE CAS CSCD 2023年第4期1244-1257,共14页
Water diversion can alleviate water shortages caused by the uneven distribution of water resources.China’s Southto-North Water Diversion Project(SNWD)is the largest water diversion project worldwide.Based on the pref... Water diversion can alleviate water shortages caused by the uneven distribution of water resources.China’s Southto-North Water Diversion Project(SNWD)is the largest water diversion project worldwide.Based on the prefecturelevel data of China’s Huang-Huai-Hai Plain from 2000 to 2020,this study employs an empirical strategy of Differencesin-Differences(DID)to analyze the impact of SNWD on agricultural production.The results show that SNWD has significantly increased agricultural production,measured by the agricultural value added.The estimated results of the benchmark model remain robust when the contemporaneous policy is addressed,an alternative outcome is used,subsamples are estimated,and alternative estimation techniques are employed.This study argues that the potential impact mechanism may be that SNWD significantly increases the acreage for cash crops but reduces that for grain crops.Heterogeneity analysis shows that in prefectures with high temperature or land potential,SNWD’s impact on agricultural value added is relatively low.In contrast,in areas with prolonged sunshine or high slopes,SNWD’s impact on agricultural value added is relatively large.Given the low added value of grain crops,the government should consider strengthening food security by subsidizing water supply to sustain grain production. 展开更多
关键词 south-to-north water diversion project agricultural production Differences-in-Differences China
下载PDF
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
10
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec... Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years. 展开更多
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water Transfer project
下载PDF
Water-saving potential evaluation of water-receiving regions in Shandong province on the East Route of the South-to-North Water Transfer Project of China
11
作者 YIN Xiao-lin GAO Yuan-yuan +1 位作者 WU Hai-ping ZHAO Xue-ming 《Journal of Groundwater Science and Engineering》 2020年第3期287-297,共11页
Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route... Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route of the South-to-North(MRSNWDP),the current water-saving potential of the water-receiving areas within the municipalities of Shandong was analyzed.Different water-saving scenarios were constructed and analyzed with key water-saving indexes in various industries.These indexes include the effective utilization coefficient of farmland irrigation water,total water consumption of industrial sectors with an added value of over 10000 RMB,average leakage rate of the urban public water supply pipe network and the penetration rate of water-saving appliances.Based on the scenarios,comprehensive water-saving potential of the 13 water-receiving area cities was calculated.The results show that the water-saving potential of the study area is at a relative high level.However,some cities still have a certain amount of water-saving potential for agriculture and industry to be elevated.Under the recommended water-saving scenario,the water-saving potential is 1.134 billion m3,accounting for 5.33%of the current total water consumption,of which 460 million m3 is in agriculture,600 million m3 in industry,is and 74.20 million m3 in urban domestic sector.Comprehensive water-saving measures for the study area were proposed from the aspects of agricultural,industrial and domestic water uses.Agricultural and industrial water saving are more significant.The major cities for agricultural water saving include Jining City,Heze City,Weifang City and Jinan City;the focus cities of industrial water saving mainly include Weihai City,Jining City and Qingdao City and etc.;the key water-saving areas for urban use mainly include Zaozhuang City,Jining City and Heze City. 展开更多
关键词 East Route of south-to-north water diversion project Shandong water receiving area water-saving level water-saving potential
下载PDF
On conservation and development of architecture and environment in the construction of large-scale national infrastructure——Exemplified by the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project 被引量:1
12
作者 DUAN Jin ,LUO JianLi,WANG XingPing,TANG Jun&YU Gang School of Architecture,Southeast University,Nanjing 210096,China 《Science China(Technological Sciences)》 SCIE EI CAS 2009年第12期3613-3625,共13页
The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through ... The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined. 展开更多
关键词 Jiangsu Section of Eastern Route south-to-north water diversion project CANAL culture routes water resources heritage CORRIDORS landscape and RECREATION CORRIDORS town economic CORRIDORS synthetical ZONING and grading
原文传递
Application of SEDEA to evaluation of degree of harmony between water resources and economic development 被引量:1
13
作者 Jun MA Chui-yong ZHENG 《Water Science and Engineering》 EI CAS 2011年第1期110-120,共11页
This paper introduces the method of data envelopment analysis (DEA) for evaluation of the degree of harmony between water resources and economic development of the water conservancy area of China's South-to-North W... This paper introduces the method of data envelopment analysis (DEA) for evaluation of the degree of harmony between water resources and economic development of the water conservancy area of China's South-to-North Water Diversion Project (SNWDP). For this evaluation, a super-efficiency DEA (SEDEA) model was developed based on the super-efficiency method. To verify the applicability of the SEDEA model, both the SEDEA model and a normal-efficiency DEA (NEDEA) model were used to evaluate the degree of harmony between water resources and economic development of typical cities in the SNWDP water conservancy area. The results show that the SEDEA model ranks the degree of harmony of typical cities more efficiently than the NEDEA model, and thus can better evaluate the degree of harmony between water resources and economic development of different cities than the NEDEA model. Furthermore, the SEDEA model can be applied as an operational research tool in regional water resources management. 展开更多
关键词 degree of harmony super-efficiency DEA model water conservancy area south-to-north water diversion project
下载PDF
北京市南水北调受水区地下水压采成效分析
14
作者 高媛媛 孙晓悦 +2 位作者 李佳 王仲鹏 袁浩瀚 《水利发展研究》 2023年第12期30-35,共6页
文章系统评估了南水北调中线一期工程通水以来北京市受水区地下水压采量、水位变化等压采成效,分析了近年来地下水开采量及其在供水总量中的比例变化趋势。自通水以来,北京市地下水开采量由2014年的19.6亿m^(3)逐渐下降至2022年的12.16... 文章系统评估了南水北调中线一期工程通水以来北京市受水区地下水压采量、水位变化等压采成效,分析了近年来地下水开采量及其在供水总量中的比例变化趋势。自通水以来,北京市地下水开采量由2014年的19.6亿m^(3)逐渐下降至2022年的12.16亿m^(3),供水比例也从52.3%降至约30%,地下水压采量已达4.46亿m^(3)。连续下降多年的地下水水位逐步回升,超采问题得以有效缓解,地下水系统得以有效涵养,地下水储备能力得以提升。针对后续压采工作开展提出了加强地下合理水位管理、加强地下水计量监管、持续优化供水管网建设、不断提升地下水战略储备能力等建议。 展开更多
关键词 地下水压采 地下水超采 南水北调 北京市
下载PDF
京密引水工程管理模式与效益分析
15
作者 孙艳华 刘培斌 沈玉亭 《水利建设与管理》 2023年第4期76-80,共5页
京密引水工程是为解决北京中心城区供水和沿线农田灌溉而修建的,现已运行六十余年。本文回顾了京密引水工程的建设和运行历程,总结了创新管理手段和观念,以及推进京密引水工程运行管理标准化、实现高质量发展的经验和做法,对京密引水工... 京密引水工程是为解决北京中心城区供水和沿线农田灌溉而修建的,现已运行六十余年。本文回顾了京密引水工程的建设和运行历程,总结了创新管理手段和观念,以及推进京密引水工程运行管理标准化、实现高质量发展的经验和做法,对京密引水工程产生的经济、社会和生态环境效益进行了分析,可为相关工程提供借鉴和参考。 展开更多
关键词 京密引水工程 管理模式 供水效益分析
下载PDF
北京市西山地区地下水数值模拟及预测 被引量:24
16
作者 吴乐 张有全 +3 位作者 宫辉力 叶超 沈媛媛 王荣 《水文地质工程地质》 CAS CSCD 北大核心 2016年第3期29-36,共8页
北京西山地区地下水资源丰富,水质优良,是北京市重要的地下水供水水源地之一。长期过量开采地下水已经引起了区域地下水水位下降等环境问题。南水北调客水进京后,将会改变区域用水结构,逐步实现对含水层系统的涵养目的。采用有限差分方... 北京西山地区地下水资源丰富,水质优良,是北京市重要的地下水供水水源地之一。长期过量开采地下水已经引起了区域地下水水位下降等环境问题。南水北调客水进京后,将会改变区域用水结构,逐步实现对含水层系统的涵养目的。采用有限差分方法进行区域含水层系统数值模拟,分析不同开采条件下含水层系统响应特征。取得如下认识:西山地区地下水开采总量达到3.546 2×108m3/a,为达到可持续开采目的,需要将开采量压至2.798 8×108m3/a,实现采补平衡;维持现状开采至2030年,岩溶水水位下降22m,第四系承压水水位下降约28m,部分地区第四系潜水含水层出现疏干现象;南水北调进京后,按照规划压采方案实施,2030年末岩溶水水位平均恢复约5m,第四系承压水水位下降约6m。区域岩溶含水层恢复贮水0.185 4×108m3,第四系含水层系统贮水损失2.782 8×108m3。 展开更多
关键词 北京 西山 地下水 数值模拟 南水北调
下载PDF
南水北调中线京石段冰期输水规律研究 被引量:6
17
作者 徐冬梅 辛悦 +1 位作者 王文川 邱林 《南水北调与水利科技》 CAS CSCD 北大核心 2015年第1期168-172,共5页
南水北调中线京石段供水工程起于河北省石家庄,止于北京的团城湖,渠道全长307km,由于沿线冬季天气寒冷,通常都会出现结冰现象。为了做好冰期调水运行工作,确保冰期通水工作的顺利进行,输水本文利用京石段四次冰期调度运行数据,在分析各... 南水北调中线京石段供水工程起于河北省石家庄,止于北京的团城湖,渠道全长307km,由于沿线冬季天气寒冷,通常都会出现结冰现象。为了做好冰期调水运行工作,确保冰期通水工作的顺利进行,输水本文利用京石段四次冰期调度运行数据,在分析各输水渠段的冰情时空分布特征的基础上,提出了冰期输水调度的经验与规律,为南水北调中线工程的冰期调度运行、冰期灾害防治和冰期灾情预报提供技术支撑。 展开更多
关键词 南水北调中线 京石段 冰期 输水规律 时空分布特征
下载PDF
南水北调京石段应急供水输水损失规律分析 被引量:4
18
作者 田景环 常思源 +1 位作者 黄鑫 王文川 《南水北调与水利科技》 CAS CSCD 北大核心 2015年第2期395-398,共4页
影响渠道输水损失率的因素很多,但主要因素是渠道施工质量、天气条件、输水流量等。利用南水北调中线京石段应急输水运行的实测数据,采用水量平衡原理,对不同时段输水损失率进行分析计算,得出输水渠道在正常运行期、汛期、冰期不同输水... 影响渠道输水损失率的因素很多,但主要因素是渠道施工质量、天气条件、输水流量等。利用南水北调中线京石段应急输水运行的实测数据,采用水量平衡原理,对不同时段输水损失率进行分析计算,得出输水渠道在正常运行期、汛期、冰期不同输水阶段的损失率规律,为即将开始的中线南水北调工程全线输水调度运行提供技术支撑。 展开更多
关键词 南水北调京石段 输水损失率 输水时段 水量平衡 分析
下载PDF
南水北调东线北延进京工程规划研究 被引量:2
19
作者 杨鸣婵 陈峰 +1 位作者 杜勇 刘光东 《水利水电技术》 CSCD 北大核心 2017年第1期139-143,153,共6页
北京市水资源严重短缺,在考虑南水北调中线扩能增加供水量的条件下,到2030年水资源供求缺口仍有9~14亿m^3。南水北调东线外调水源可靠、水量充足、水质达标,向北延伸具有可行性。通过水资源供需平衡计算,确定2030年东线北延进京工程调... 北京市水资源严重短缺,在考虑南水北调中线扩能增加供水量的条件下,到2030年水资源供求缺口仍有9~14亿m^3。南水北调东线外调水源可靠、水量充足、水质达标,向北延伸具有可行性。通过水资源供需平衡计算,确定2030年东线北延进京工程调水规模10亿m^3。基于低碳发展理念,探索在河北省文安县新建文安洼水库(库容4.2亿m^3)将汛期不调水调节为全年连续输水进京。北京境内工程布局以优水优用、一水多用为目标,现有一环输水线路(107 km)水源为优质中线水,供城市生活为主;规划二环输水线路(140 km)水源为东线北延水,供生态环境为主。以此,促进形成一环、二环分质供水,相对独立,调度灵活,运行安全及备用可靠的工程体系。 展开更多
关键词 水资源供需分析 南水北调东线北延进京工程 调水规模 京津冀协同发展 生态文明建设 水资源规划 需水预测 分质供水
下载PDF
北京市南水北调密云调水工程引水渠绿色廊道生态格局研究 被引量:3
20
作者 吴东敏 王绍斌 肖志广 《水利水电技术》 CSCD 北大核心 2016年第2期128-134,共7页
以南水北调工程为契机,针对京密引水渠绿色廊道生态格局进行了研究,以便对保障北京市水源生态安全并构筑北京市完善的生态格局起到重要的支撑作用。本文通过对场地调研及优劣势分析,探讨了引水渠绿色廊道生态格局的功能定位、策略、主... 以南水北调工程为契机,针对京密引水渠绿色廊道生态格局进行了研究,以便对保障北京市水源生态安全并构筑北京市完善的生态格局起到重要的支撑作用。本文通过对场地调研及优劣势分析,探讨了引水渠绿色廊道生态格局的功能定位、策略、主题及研究要点等,旨在供类似工程及今后的有关生态景观设计参考。 展开更多
关键词 南水北调工程 京密引水渠 绿色廊道 水源 生态安全 生态格局 北京
下载PDF
上一页 1 2 3 下一页 到第
使用帮助 返回顶部