Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requir...Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requirements of safety,comfort and stability of the train under high-speed condition. At the same time,concepts of environmental adaptability,service to transportation and comprehensive benefits were observed. On the whole line,long-bridge schemes were adopted and the most advanced technologies of unballasted track were utilized on bridges,the length of which accounts for 87.7 % of the total line. The success of design and construction of the bridges on this rail has accumulated valuable experience for high-speed railway construction on a large scale in the future,and made it a marking,demonstrating,and model project to follow.展开更多
Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determi...Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.展开更多
文摘Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requirements of safety,comfort and stability of the train under high-speed condition. At the same time,concepts of environmental adaptability,service to transportation and comprehensive benefits were observed. On the whole line,long-bridge schemes were adopted and the most advanced technologies of unballasted track were utilized on bridges,the length of which accounts for 87.7 % of the total line. The success of design and construction of the bridges on this rail has accumulated valuable experience for high-speed railway construction on a large scale in the future,and made it a marking,demonstrating,and model project to follow.
文摘Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.