Wireless relay and network coding are two critical techniques to increase the reliability and throughput of wireless cooperative communication systems. In this paper, a complex field network coding (CFNC) scheme wit...Wireless relay and network coding are two critical techniques to increase the reliability and throughput of wireless cooperative communication systems. In this paper, a complex field network coding (CFNC) scheme with the K-th best relay selection (KBS) is proposed and investigated, wherein the K-th best relay is selected to forward the multiplexed signal to the destination. First, the upper bound of the symbol error probability (SEP), the diversity order, and the coding gain are derived for the CFNC scheme with KBS. Then, the coding gain is utilized as the optimized cri- terion to determine the optimal power allocation. It is validated through analysis and simulation that the CFNC scheme with KBS can achieve full diversity only when K=I, while the diversity order decreases with increasing parameter K, and the optimal power allocation can significantly improve the performance of the CFNC scheme with KBS.展开更多
This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system runnin...This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system running in two cases of whether the pumped storage power station is put into operation. The difference of the total coal consumption between the two cases is the peak load shifting benefit. Furthermore, we build load model and power generation model to calculate the benefit of emergency use and frequency modulation, which are the major projects of dynamic benefits. At last, on the premise of ensuring the system requirements, the developed method employs the maximum benefit of the unit capacity as the objective function to get the best installed capacity of pumped storage power station by simulations. Tests on a provincial power grid have shown that the developed method which combines of load characteristics, electric structure and other factors can get the best installed capacity of pumped storage power station easily and has a certain guiding significance for the planning and construction of the pumped storage power station.展开更多
基金supported by the Major State Basic Research Development Program of China(973 Program No.2012CB316100)the National Natural Science Foundation of China(Nos.61032002/61271246)the 111 Project(No.111-2-14)
文摘Wireless relay and network coding are two critical techniques to increase the reliability and throughput of wireless cooperative communication systems. In this paper, a complex field network coding (CFNC) scheme with the K-th best relay selection (KBS) is proposed and investigated, wherein the K-th best relay is selected to forward the multiplexed signal to the destination. First, the upper bound of the symbol error probability (SEP), the diversity order, and the coding gain are derived for the CFNC scheme with KBS. Then, the coding gain is utilized as the optimized cri- terion to determine the optimal power allocation. It is validated through analysis and simulation that the CFNC scheme with KBS can achieve full diversity only when K=I, while the diversity order decreases with increasing parameter K, and the optimal power allocation can significantly improve the performance of the CFNC scheme with KBS.
文摘This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system running in two cases of whether the pumped storage power station is put into operation. The difference of the total coal consumption between the two cases is the peak load shifting benefit. Furthermore, we build load model and power generation model to calculate the benefit of emergency use and frequency modulation, which are the major projects of dynamic benefits. At last, on the premise of ensuring the system requirements, the developed method employs the maximum benefit of the unit capacity as the objective function to get the best installed capacity of pumped storage power station by simulations. Tests on a provincial power grid have shown that the developed method which combines of load characteristics, electric structure and other factors can get the best installed capacity of pumped storage power station easily and has a certain guiding significance for the planning and construction of the pumped storage power station.
文摘为针对性地解决转炉炼钢作业时的消防安全问题,提出将熵权-最优最劣法(Best Worst Method,BWM)和物元可拓模型相结合的转炉车间火灾风险评估模型。通过将指标分为人、物料设备、环境、管理及消防设施5大类,构建转炉车间火灾风险评估指标体系;利用复合语言对35个指标进行评价,引入有序加权平均算子(Ordered Weighted Averaging,OWA)计算各语言的犹豫语言术语集(Hesitant Fuzzy Linguistic Term Set,HFLTS)模糊包络,再根据各专家权重进行加权计算并将语言量化构成评价矩阵;基于熵权、BWM分别算得各指标权重,再运用最小二乘法得到综合权重;最后利用物元可拓模型确定各指标及转炉车间的火灾风险等级。以河北省某炼钢转炉车间为例进行评估得出:该转炉车间的综合风险等级为I级(安全),其中动火监护的人员监管情况、氧枪法兰松紧度、炉前温度环境、作业现场物品摆放情况、作业巡查及设备检查情况和消防疏散通道堵塞情况仍需改善。