Bleed air system is one of the most important components of air management system(AMS).It acts as transfer pipes responsible for air supply at high temperature and pressure.The thermal and flow performance of the blee...Bleed air system is one of the most important components of air management system(AMS).It acts as transfer pipes responsible for air supply at high temperature and pressure.The thermal and flow performance of the bleed air system is a key issue for the design of AMS since the characteristics of air source have a great influence on the anti-ice system,the environmental control system and other downstream system in need of high temperature pressurized air.Based on the one-dimensional lumped parameter technology,a computer analysis model of bleed air system is developed in order to analyze the thermal and flow behaviors of the nodal points in the pipeline network.The simulation are performed with a given flight assignment using the analysis model,and the results verify that the system meets the design requirements.展开更多
There are certification and airworthiness requirements relevant to the provision of clean breathing air in the crew and passenger compartments. There have been continuing reports and studies over the years regarding o...There are certification and airworthiness requirements relevant to the provision of clean breathing air in the crew and passenger compartments. There have been continuing reports and studies over the years regarding oil fumes in aircraft, including impaired crew performance. Oil fumes are viewed in varying ways ranging from rare seal bearing failures, to low level leakage in normal flight. A Masters of Science (MSc) research degree was undertaken to assess whether there is any gap between the certification requirements for the provision of clean air in crew and passenger compartments, and the theoretical and practical implementation of the requirements using the bleed air system. A comprehensive literature search reviewed applicable certification standards, documented and theoretical understanding of oil leakage. Two types of interviews were conducted to address the research questions. Key aviation regulators were questioned about the process by which they certify and ensure compliance with the clean air requirements. Aerospace engineers and sealing professionals were interviewed about their understanding of how oil may leak past compressor oil bearing seals, and into the air supply under various flight conditions. The outcome of the research showed that there is a gap between the clean air certification requirements, and the theoretical and practical implementation of the requirements using the bleed air system. Low level oil leakage into the aircraft cabin in normal flight operations is a function of the design of the engine lubricating system and bleed air systems, both utilising pressurised air. The use of the bleed air system to supply the regulatory required air quality standards is not being met or being enforced as required.展开更多
This paper aims to obtain the thermodynamic characteristics of the air system control device sealing part in different compressor bleed air and ambient temperature.On the basis of considering the main factors affectin...This paper aims to obtain the thermodynamic characteristics of the air system control device sealing part in different compressor bleed air and ambient temperature.On the basis of considering the main factors affecting the heat exchange process and simplifying the physical model of the air system control device,the thermodynamic model of air system control device is established based on the basic theory of laminar flow heat transfer and heat conduction theory.Then the piston motion characteristics and the thermodynamic characteristics of the air system control device seal are simulated.The simulation results show that the valve actuation dynamic time of piston is about 0.13 s in the actual working conditions,and the temperature effect on the dynamic response of the piston rod is only 5 ms when the inlet air temperature at 300 ℃ and 370 ℃.The maximum temperature of the air system control device sealing part is not more than 290 ℃ under long time working condition of compressor air entraining.The highest temperature of the sealing part can reach up to 340 ℃ when the air flow temperature reaches the limit temperature of 370 ℃,and the longest duration working temperature limit is not more than 14 s.Therefore,the selection of control device sealing material should consider the work characteristic of instantaneous temperature limit.展开更多
文摘Bleed air system is one of the most important components of air management system(AMS).It acts as transfer pipes responsible for air supply at high temperature and pressure.The thermal and flow performance of the bleed air system is a key issue for the design of AMS since the characteristics of air source have a great influence on the anti-ice system,the environmental control system and other downstream system in need of high temperature pressurized air.Based on the one-dimensional lumped parameter technology,a computer analysis model of bleed air system is developed in order to analyze the thermal and flow behaviors of the nodal points in the pipeline network.The simulation are performed with a given flight assignment using the analysis model,and the results verify that the system meets the design requirements.
文摘There are certification and airworthiness requirements relevant to the provision of clean breathing air in the crew and passenger compartments. There have been continuing reports and studies over the years regarding oil fumes in aircraft, including impaired crew performance. Oil fumes are viewed in varying ways ranging from rare seal bearing failures, to low level leakage in normal flight. A Masters of Science (MSc) research degree was undertaken to assess whether there is any gap between the certification requirements for the provision of clean air in crew and passenger compartments, and the theoretical and practical implementation of the requirements using the bleed air system. A comprehensive literature search reviewed applicable certification standards, documented and theoretical understanding of oil leakage. Two types of interviews were conducted to address the research questions. Key aviation regulators were questioned about the process by which they certify and ensure compliance with the clean air requirements. Aerospace engineers and sealing professionals were interviewed about their understanding of how oil may leak past compressor oil bearing seals, and into the air supply under various flight conditions. The outcome of the research showed that there is a gap between the clean air certification requirements, and the theoretical and practical implementation of the requirements using the bleed air system. Low level oil leakage into the aircraft cabin in normal flight operations is a function of the design of the engine lubricating system and bleed air systems, both utilising pressurised air. The use of the bleed air system to supply the regulatory required air quality standards is not being met or being enforced as required.
基金supported by the National Major Special Projects for Gas Engine and Aero Engine(No.2017-V-0013)the Aviation Funds(No.20150653006)the Fundamental Research Funds for the Central Universities(No.G2017KY0003)
文摘This paper aims to obtain the thermodynamic characteristics of the air system control device sealing part in different compressor bleed air and ambient temperature.On the basis of considering the main factors affecting the heat exchange process and simplifying the physical model of the air system control device,the thermodynamic model of air system control device is established based on the basic theory of laminar flow heat transfer and heat conduction theory.Then the piston motion characteristics and the thermodynamic characteristics of the air system control device seal are simulated.The simulation results show that the valve actuation dynamic time of piston is about 0.13 s in the actual working conditions,and the temperature effect on the dynamic response of the piston rod is only 5 ms when the inlet air temperature at 300 ℃ and 370 ℃.The maximum temperature of the air system control device sealing part is not more than 290 ℃ under long time working condition of compressor air entraining.The highest temperature of the sealing part can reach up to 340 ℃ when the air flow temperature reaches the limit temperature of 370 ℃,and the longest duration working temperature limit is not more than 14 s.Therefore,the selection of control device sealing material should consider the work characteristic of instantaneous temperature limit.