Corporate sustainability reporting has become increasingly important in recent years.However,conventional approaches reach their limits when it comes to quantifying and measuring the actual sustainability performance ...Corporate sustainability reporting has become increasingly important in recent years.However,conventional approaches reach their limits when it comes to quantifying and measuring the actual sustainability performance of a company.This article presents a new approach:Sustainable Performance Accounting(SPA),which is based on an extension of bookkeeping by including ESG bookkeeping.SPA enables companies to systematically measure and manage their sustainability performance.The article provides an overview of the basics of SPA methodology and uses a comprehensive example showing how SPA can be implemented in practice.The article is aimed at interested readers from science and practice as well as decision-makers who are interested in future-oriented sustainability reporting.展开更多
The supercritical CO_(2)(sCO_(2))power cycle could improve efficiencies for a wide range of thermal power plants.The sCO_(2)turbine generator plays an important role in the sCO_(2)power cycle by directly converting th...The supercritical CO_(2)(sCO_(2))power cycle could improve efficiencies for a wide range of thermal power plants.The sCO_(2)turbine generator plays an important role in the sCO_(2)power cycle by directly converting thermal energy into mechanical work and electric power.The operation of the generator encounters challenges,including high temperature,high pressure,high rotational speed,and other engineering problems,such as leakage.Experimental studies of sCO_(2)turbines are insufficient because of the significant difficulties in turbine manufacturing and system construction.Unlike most experimental investigations that primarily focus on 100 kW‐or MW‐scale power generation systems,we consider,for the first time,a small‐scale power generator using sCO_(2).A partial admission axial turbine was designed and manufactured with a rated rotational speed of 40,000 rpm,and a CO_(2)transcritical power cycle test loop was constructed to validate the performance of our manufactured generator.A resistant gas was proposed in the constructed turbine expander to solve the leakage issue.Both dynamic and steady performances were investigated.The results indicated that a peak electric power of 11.55 kW was achieved at 29,369 rpm.The maximum total efficiency of the turbo‐generator was 58.98%,which was affected by both the turbine rotational speed and pressure ratio,according to the proposed performance map.展开更多
文摘Corporate sustainability reporting has become increasingly important in recent years.However,conventional approaches reach their limits when it comes to quantifying and measuring the actual sustainability performance of a company.This article presents a new approach:Sustainable Performance Accounting(SPA),which is based on an extension of bookkeeping by including ESG bookkeeping.SPA enables companies to systematically measure and manage their sustainability performance.The article provides an overview of the basics of SPA methodology and uses a comprehensive example showing how SPA can be implemented in practice.The article is aimed at interested readers from science and practice as well as decision-makers who are interested in future-oriented sustainability reporting.
基金National Science Fund for Excellent Young Scholars,Grant/Award Number:52022066。
文摘The supercritical CO_(2)(sCO_(2))power cycle could improve efficiencies for a wide range of thermal power plants.The sCO_(2)turbine generator plays an important role in the sCO_(2)power cycle by directly converting thermal energy into mechanical work and electric power.The operation of the generator encounters challenges,including high temperature,high pressure,high rotational speed,and other engineering problems,such as leakage.Experimental studies of sCO_(2)turbines are insufficient because of the significant difficulties in turbine manufacturing and system construction.Unlike most experimental investigations that primarily focus on 100 kW‐or MW‐scale power generation systems,we consider,for the first time,a small‐scale power generator using sCO_(2).A partial admission axial turbine was designed and manufactured with a rated rotational speed of 40,000 rpm,and a CO_(2)transcritical power cycle test loop was constructed to validate the performance of our manufactured generator.A resistant gas was proposed in the constructed turbine expander to solve the leakage issue.Both dynamic and steady performances were investigated.The results indicated that a peak electric power of 11.55 kW was achieved at 29,369 rpm.The maximum total efficiency of the turbo‐generator was 58.98%,which was affected by both the turbine rotational speed and pressure ratio,according to the proposed performance map.