期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Application of Capability Maturity Model Integration to Innovation Management for Software and Service Companies
1
作者 李静 《Journal of Southwest Jiaotong University(English Edition)》 2008年第2期188-194,共7页
To look through innovation management in small project-based firms, such as software engineering companies, which are service firms that conduct projects for their clients, capability maturity model integration (CMMI... To look through innovation management in small project-based firms, such as software engineering companies, which are service firms that conduct projects for their clients, capability maturity model integration (CMMI) is introduced. It is a process improvement approach that provides organizations with the essential elements of effective processes. Taking ABC Software Company as an example, the performances before and after the introduction of CMMI in the firm were compared. The results indicated that after two years of application, the productivity increased 92%, and the ability of detecting errors improved 26.45% ; while the rate of faults and the cost of software development dropped 12.45% and 77.55%, respectively. To conclude, small project-based firms benefit a lot if they take CMMI into their process of innovation management, particularly for those R&D firms, since the implementation of CMMI leads them to a promising future with higher efficiency and better effects. 展开更多
关键词 capability maturity model integration Software and service company Innovation management
下载PDF
A Benefit Measurement Framework for an Online Contract Change Management System
2
作者 Tejas Oza 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期205-210,共6页
The contract change management (CCM) system is an online collaboration tool, which supports the contract change management process of new engineering contract (NEC) contract. It is currently used in practice on a wide... The contract change management (CCM) system is an online collaboration tool, which supports the contract change management process of new engineering contract (NEC) contract. It is currently used in practice on a wide range of civil, power, and building projects in the UK. The aim of this study is first to identify the tangible and intangible benefits of the system through a user survey; then to develop a framework to measure these benefits. A questionnaire survey is conducted, which reveals that CCM can help project teams improve process effectiveness, reduce risk of process failures, and increase the compliance with NEC requirements. Subsequently, a spreadsheet tool is developed to allow CCM users to calculate the tangible cost savings as a result of using the system. For intangible benefits, a change management maturity model (CM3) is developed, which provides a measurement framework for assessing the improvement of a project team’s capability in dealing with contract changes. 展开更多
关键词 contract change management IT benefit measurement capability maturity model benefit measurement framework new engineering contract (NEC) processes
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部