期刊文献+
共找到4,325篇文章
< 1 2 217 >
每页显示 20 50 100
Auto-parametric resonance of a continuous-beam-bridge model under two-point periodic excitation:an experimental investigation and stability analysis
1
作者 Li Yuchun Shen Chao +1 位作者 Liu Wei Li Dong 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2024年第2期445-454,共10页
The auto-parametric resonance of a continuous-beam bridge model subjected to a two-point periodic excitation is experimentally and numerically investigated in this study.An auto-parametric resonance experiment of the ... The auto-parametric resonance of a continuous-beam bridge model subjected to a two-point periodic excitation is experimentally and numerically investigated in this study.An auto-parametric resonance experiment of the test model is conducted to observe and measure the auto-parametric resonance of a continuous beam under a two-point excitation on columns.The parametric vibration equation is established for the test model using the finite-element method.The auto-parametric resonance stability of the structure is analyzed by using Newmark's method and the energy-growth exponent method.The effects of the phase difference of the two-point excitation on the stability boundaries of auto-parametric resonance are studied for the test model.Compared with the experiment,the numerical instability predictions of auto-parametric resonance are consistent with the test phenomena,and the numerical stability boundaries of auto-parametric resonance agree with the experimental ones.For a continuous beam bridge,when the ratio of multipoint excitation frequency(applied to the columns)to natural frequency of the continuous girder is approximately equal to 2,the continuous beam may undergo a strong auto-parametric resonance.Combined with the present experiment and analysis,a hypothesis of Volgograd Bridge's serpentine vibration is discussed. 展开更多
关键词 auto-parametric resonance continuous beam bridge model two-point excitation experimental investigation stability analysis vibration of Volgograd Bridge
下载PDF
Ultimate negative bending-moment capacity of outer-plated steel-concrete continuous composite beams 被引量:1
2
作者 陈丽华 李爱群 +1 位作者 娄宇 李培彬 《Journal of Southeast University(English Edition)》 EI CAS 2009年第1期89-93,共5页
Static load tests and bearing capacity analyses are carried out for two outer-plated steel-concrete continuous composite beams. The load-deflection curve and the load-strain curve of specimens are obtained and analyze... Static load tests and bearing capacity analyses are carried out for two outer-plated steel-concrete continuous composite beams. The load-deflection curve and the load-strain curve of specimens are obtained and analyzed. The test results indicate that effective cooperation can be achieved by the shearresistant connection between the reinforcement in the negative moment area and the outer-plated steel beam, and the overall working performance of the composite beams is favorable. At the load-bearing limiting state, the plastic strain on the maximum negative and positive moment section becomes fully developed so as to form relatively ideal plastic hinges. With the increase in the reinforcement ratio, the moment-carrying capacity of the composite beams improves significantly, but the ductility of the beams and the rotation ability of the plastic hinges decrease. The formulae for calculating the limit bending capacity in the negative moment area of outer-plated steel-concrete composite beams are proposed based on the test data. The calculated results agree well with the test results. 展开更多
关键词 outer-plated steel-concrete composite beam continuous beam negative moment bending-moment bearing capacity
下载PDF
Fluid Flow and Solidification Simulation in Beam Blank Continuous Casting Process With 3D Coupled Model 被引量:14
3
作者 YANG Jian-wei DU Yan-ping +1 位作者 SHI Rong CUI Xiao-chao 《Journal of Iron and Steel Research International》 SCIE EI CAS CSCD 2006年第4期17-21,共5页
Based on turbulent theory, a 3D coupled model of fluid flow and solidification was built using finite difference method and used to study the influence of superheating degree and casting speed on fluid flow and solidi... Based on turbulent theory, a 3D coupled model of fluid flow and solidification was built using finite difference method and used to study the influence of superheating degree and casting speed on fluid flow and solidification, analyze the interaction between shell and molten steel, and compare the temperature distribution under different technological conditions. The results indicate that high superheating degree can lengthen the liquid-core depth and make the crack and breakout possible, so suitable superheating should be controlled within 35℃ according to the simulation results. Casting speed which is one of the most important technological parameters of improving production rate, should be controlled between 0. 85 m/min and 1.05 m/min and the caster has great potential in the improvement of blank quality. 展开更多
关键词 beam blank continuous casting flow field temperature distribution coupled model SOLIDIFICATION
下载PDF
NUMERICAL SIMULATION OF THE THERMO-MECHANICAL PROCESS FOR BEAM BLANK CONTINUOUS CASTING 被引量:8
4
作者 W. Chen Y.Z. Zhang +4 位作者 C.J. Zhang L.G. Zhu B.X. Wang W.G. Lu J.H. Ma 《Acta Metallurgica Sinica(English Letters)》 SCIE EI CAS CSCD 2007年第4期241-250,共10页
The aim of this study was to simulate the solidification process of beam blank continuous casting, and then find the reasons for the typical defects of the beam blank. A two-dimensional transient coupled finite elemen... The aim of this study was to simulate the solidification process of beam blank continuous casting, and then find the reasons for the typical defects of the beam blank. A two-dimensional transient coupled finite element model has been developed to compute the temperature and stress profile in beam blank continuous casting. The enthalpy method was used in the heat conduction equation. The thermo-mechanical property in the mushy zone was taken into consideration in this calculation. It is shown that at the mold exit the thickness of the shell had its maximum value at the flange tip and its minimum value at the fillet. The temperature had a great fluctuation on the surface of the beam blank in the secondary cooling zone. At the unbending point, the surface temperature of the web was in the brittleness temperature range under the present condition. To ensure the quality, it is necessary to weaken the intensity of secondary cooling. At the mold exit the equivalent stress and strain have higher values at the flange tip and at the web. From the spray 1 to the unbending point, the maximum values of stress and strain gradually moved to the internal section of the flange tip and the web. However, whenever, there were bigger stress and strain values near the flange tip and the web than in the other parts, it must be very easy to generate cracks at those positions. Now, online verification of this simulation has been developed, which has proved to be very useful and efficient to instruct the practical production of beam blank continuous casting. 展开更多
关键词 beam blank continuous basting thermo-mechanical process SIMULATION
下载PDF
THEORETICAL MODEL ON INTERFACE FAILURE MECHANISM OF REINFORCED CONCRETE CONTINUOUS BEAM STRENGTHENED BY FRP 被引量:4
5
作者 Hong Yuan Zifeng Lin 《Acta Mechanica Solida Sinica》 SCIE EI 2009年第2期161-170,共10页
Fiber reinforced polymer (FRP) composites are increasingly being used for the re-pair and strengthening of deteriorated concrete structural components through adhesive bonding of prefabricated strips/plates and the ... Fiber reinforced polymer (FRP) composites are increasingly being used for the re-pair and strengthening of deteriorated concrete structural components through adhesive bonding of prefabricated strips/plates and the wet lay-up of fabric. Interfacial bond failure modes have attracted the attention of researchers because of the importance. The objective of the present study is to analyse the interface failure mechanism of reinforced concrete continuous beam strength-ened by FRP. An analytical solution has been firstly presented to predict the entire debonding process of the model. The realistic bi-linear bond-slip interfacial law was adopted to study this problem. The crack propagation process of the loaded model was divided into four stages (elastic,elastic-softening,elastic-softening-debonded and softening-debonded stage). Among them,elastic-softening-debonded stage has four sub-stages. The equations are solved by adding suitable stress and displacement boundary conditions. Finally,critical value of bond length is determined to make the failure mechanism in the paper effective by solving the simultaneously linear algebraic equations. The interaction between the upper and lower FRP plates can be neglected if axial stiffness ratio of the concrete-to-plate prism is large enough. 展开更多
关键词 FRP INTERFACE bond-slip law critical length continuous beam ultimate load
下载PDF
Impact coefficient and reliability of mid-span continuous beam bridge under action of extra heavy vehicle with low speed 被引量:11
6
作者 刘波 王有志 +1 位作者 胡朋 袁泉 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第4期1510-1520,共11页
To analyze the dynamic response and reliability of a continuous beam bridge under the action of an extra heavy vehicle, a vehicle–bridge coupled vibration model was established based on the virtual work principle and... To analyze the dynamic response and reliability of a continuous beam bridge under the action of an extra heavy vehicle, a vehicle–bridge coupled vibration model was established based on the virtual work principle and vehicle–bridge displacement compatibility equation, which can accurately simulate the dynamic characteristics of the vehicle and bridge. Results show that deck roughness has an important function in the effect of the vehicle on the bridge. When an extra heavy vehicle passes through the continuous beam bridge at a low speed of 5 km/h, the impact coefficient reaches a high value, which should not be disregarded in bridge safety assessments. Considering that no specific law exists between the impact coefficient and vehicle speed, vehicle speed should not be unduly limited and deck roughness repairing should be paid considerable attention. Deck roughness has a significant influence on the reliability index, which decreases as deck roughness increases. For the continuous beam bridge in this work, the reliability index of each control section is greater than the minimum reliability index. No reinforcement measures are required for over-sized transport. 展开更多
关键词 continuous beam bridge extra heavy vehicle coupled vibration impact coefficient reliability
下载PDF
Structural Behavior of Continuous Prestressed Steel Fiber Reinforced High Strength Concrete Beam 被引量:2
7
作者 刘海波 向天宇 赵人达 《Journal of Southwest Jiaotong University(English Edition)》 2008年第1期37-45,共9页
The flexural behaviors of continuous fully and partially prestressed steel fiber reinforced high strength concrete beams are studied by experiment and nonlinear finite element analysis. Three levels of partial prestre... The flexural behaviors of continuous fully and partially prestressed steel fiber reinforced high strength concrete beams are studied by experiment and nonlinear finite element analysis. Three levels of partial prestress ratio (PPR) are considered, and three pairs of two-span continuous beams with box sections varying in size are designed. The major parameters involved in the study include the PPR and the fiber location. It is concluded that the prestressed high strength concrete beam exhibits satisfactory ductility; the influences of steel fiber on the crack behaviors for partially prestressed beams are not as obvious as those for fully prestressed ones; steel fibers can improve the structural stiffness after cracking for fully prestressed high strength concrete beams; the moment redistribution from mid-span to intermediate support in the first stage should be mainly considered in practical design. 展开更多
关键词 High strength concrete Steel fiber reinforced concrete Prestressed concrete continuous beam
下载PDF
Temporary Bearing Method in Construction of Continuous Beam Bridge Erected as Simply-Supported Beam 被引量:1
8
作者 Mehadi Hassan Rabby Zhipei Guo Miaoqiang Huang 《Open Journal of Civil Engineering》 2018年第4期473-477,共5页
The present practice in Bangladesh for erection of girders is placing the girder directly on the bearing pad and joining the adjacent two spans in deck slab level by adopting expansion joints, as the bridges are prese... The present practice in Bangladesh for erection of girders is placing the girder directly on the bearing pad and joining the adjacent two spans in deck slab level by adopting expansion joints, as the bridges are presently designed as simply-supported beam bridge. The main disadvantage of this type of bridges is that, the seismic resistance is weak, and under the external force beyond the design range, the bridges are more likely to fall in danger because of failure in girders. Also they have expansion joints for each span, which affects the comfort of driving and the overall integrity of the bridge deck is poor [1]. Therefore, design and construction of the bridges have been revised to establish continuity between girders of two adjacent spans and transform the bridge as simply supported continuous beam bridge [2]. Temporary bearing (sandbox) method is proposed in this paper to solve the system transformation of continuous beam bridges. Design of the temporary bearing is very simple and can be manufactured at site. This method has been proved in construction of Arial Kha Bridge and can be applied for other similar bridges in Bangladesh. 展开更多
关键词 TEMPORARY Bearing Simply SUPPORTED SPAN Simply SUPPORTED continuous GIRDER Expansion Joints cast-in-situ GIRDER Joint Section
下载PDF
EFFECT OF SUBMERGED ENTRY NOZZLE (SEN) PARAMETERS AND SHAPE ON 3-D FLUID FLOW IN MOULD FOR BEAM BLANK CONTINUOUS CASTING
9
作者 Y.P.Du J.W.Yang +1 位作者 R.Shi X.C.Cui 《Acta Metallurgica Sinica(English Letters)》 SCIE EI CAS CSCD 2004年第5期705-712,共8页
According to turbulent theory and characteristics of beam blank continuous casting, 3-D model to represent the flow of beam blank mould is established. The predicted results indicate that the exit obliquity of up 15&#... According to turbulent theory and characteristics of beam blank continuous casting, 3-D model to represent the flow of beam blank mould is established. The predicted results indicate that the exit obliquity of up 15°(+15°) should be adopted, which will benefit the floatation of non-metallic inclusion and purification of the molten steel. When the nozzle angle is 120°, the flow pattern is reasonable. Proper nozzle depth can be 200mm. Turbulent kinetic of meniscus can be reduced by adopting the square nozzle and suitable area of side outlet when casting speed increases. The results are consistent with those of water model experiment, so the model is exact and reasonable. The model can provide important information for design of SEN and defining of immersion depth. 展开更多
关键词 SEN parameter SEN shape beam blank continuous casting 3-D flow distribution turbulent kinetic energy
下载PDF
Analysis on plastic properties of reactive powder concrete continuous beams reinforced with GFRP bars
10
作者 卢姗姗 郑文忠 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2010年第4期471-475,共5页
To study the plastic properties of reactive powder concrete continuous beams reinforced with GFRP bars,the calculation programs for moment redistribution coefficients are prepared by using nonlinear analysis methods s... To study the plastic properties of reactive powder concrete continuous beams reinforced with GFRP bars,the calculation programs for moment redistribution coefficients are prepared by using nonlinear analysis methods such as moment-curvature,conjugate beam method and so on. By comparing the test results of existed FRP bars reinforced concrete continuous beams with simulation results,the accuracy of the calculation program is verified. Then 18 simulated GFRP bars reinforced reactive powder concrete continuous beams are selected whose change parameters are reinforcement ratio of mid-span and middle support. Through the nonlinear analysis of simulated beams,moment redistribution coefficients under mid-span concentrated loads,one-third point loads and uniformly distributed loads are obtained respectively. Thus the formula of moment redistribution coefficients is obtained by fitting moment redistribution coefficients and factors. The results show that the reactive powder concrete continuous beams reinforced with GFRP bars have good plastic properties. 展开更多
关键词 GFRP bars reactive powder concrete ( RPC) continuous beam plastic properties
下载PDF
Damage assessment of a continuous beam bridge based on the strain mode
11
作者 杜思义 《Journal of Chongqing University》 CAS 2003年第2期28-30,共3页
Based on the method of strain mode, damage identification of continuous beam bridges by comparing the variance of several curves of strain modes difference is studied. Three cases of numerical simulation demonstrate t... Based on the method of strain mode, damage identification of continuous beam bridges by comparing the variance of several curves of strain modes difference is studied. Three cases of numerical simulation demonstrate that the proposed method is applicable to detecting many a damage in a continuous beam bridge, which accurately identifies the damaged positions of the bridge, and detects the damage severity of an element by its according peak value of the curve of strain modes difference that is found to increase with the increasing damage severity. 展开更多
关键词 continuous beam bridge DAMAGE DETECT strain mode
下载PDF
Distribution of Reinforcement in Tensile Flanges of Concrete T-shape Continuous Beam
12
作者 Slawomir Karas Marta Slowik 《Journal of Civil Engineering and Architecture》 2010年第11期59-64,共6页
In this paper the analysis of tensile stress distribution in flexural continuous T- beam has been presented. The observed damages in carrying deck of RC bridge over the Wieprz River in Baranow indicate that over pilla... In this paper the analysis of tensile stress distribution in flexural continuous T- beam has been presented. The observed damages in carrying deck of RC bridge over the Wieprz River in Baranow indicate that over pillar zones are not protected enough. The results of numerical analysis have shown that tensile stress in T- section beam appears not only in a web but in flanges as well. Thus reinforcing bars should be distributed within the whole effective width. This fact is mentioned in building codes, for example, in Eurocode 2: "Design of concrete structures", both in part 1.1 "General rules and rules for building" and in part 2 "Reinforced and prestressed concrete bridges", but there are not detailed rules how to place the bars in flanges of T-section. 展开更多
关键词 Flexural continuous beam reinforced concrete T-section tensile stress distribution.
下载PDF
Longitudinal force in continuously welded rail on long-span tied arch continuous bridge carrying multiple tracks 被引量:18
13
作者 闫斌 戴公连 +1 位作者 郭文华 徐庆元 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第5期2001-2006,共6页
Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete ... Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete composite section beam element to simulate concrete-filled steel tube(CFST) arch rib, using the beam element with rigid arm to simulate the prestressed concrete girder and using nonlinear bar element to simulate longitudinal constraint between track and bridge. Taking a(77+3×156.8+77) m tied arch continuous bridge with four tracks on the Harbin-Qiqihar Passenger Dedicated Line as an example, the arrangement of continuously welded rail(CWR) was explored. The longitudinal force in CWR on the tied arch continuous bridge, the pier top horizontal force and torque due to the unbalance load case, were analyzed under the action of temperature, vertical live load, train braking and wind load.Studies show that, it can significantly reduce track displacement to set the track expansion devices at main span arch springing on both sides; the track stress due to arch temperature variation can reach 40.8 MPa; the track stress, pier top horizontal force and torque are related to the number of loaded tracks and train running direction, and the bending force applied to unloaded track is close to the loaded track, while the braking force applied to unloaded track is 1/4 to 1/2 of the loaded track; the longitudinal force of track due to the wind load is up to 12.4 MPa, which should be considered. 展开更多
关键词 railroad bridge long-span bridge tied arch continuous beam continuously welded rail track-bridge interaction
下载PDF
Longitudinal forces of continuously welded track on high-speed railway cable-stayed bridge considering impact of adjacent bridges 被引量:32
14
作者 戴公连 闫斌 《Journal of Central South University》 SCIE EI CAS 2012年第8期2348-2353,共6页
A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile fini... A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile finite element model of the cable-stayed bridge was established. Taking a bridge group including 40-32m simply-supported beam and (32+80+112)m single-tower cable-stayed bridge and 17-32m simply-supported beam on the Kunming-Shanghai high-speed railway as an example, the characteristics of CWR longitudinal force on the cable-stayed bridge were studied. It is shown that adjacent bridges must be considered in the calculation of the track expansion force and bending force on cable-stayed bridge. When the span amount of adjacent bridges is too numerous, it can be simplified as six spans; the fixed bearing of adjacent simply-supported beams should be placed on the side near the cable-stayed bridge; the track expansion device should be set at the bridge tower to reduce the track force near the bridge abutment. 展开更多
关键词 high-speed railway continuously welded track cable-stayed bridge simply-supported beam
下载PDF
Applicability of small resistance fastener on long-span continuous bridges of high-speed railway 被引量:19
15
作者 戴公连 刘文硕 《Journal of Central South University》 SCIE EI CAS 2013年第5期1426-1433,共8页
Ballastless tracks have been widely applied in high-speed railway (HSR). The adaptability research between continuous welded rails (CWR) and long-span bridges of HSR is of great practical engineering significance. Bas... Ballastless tracks have been widely applied in high-speed railway (HSR). The adaptability research between continuous welded rails (CWR) and long-span bridges of HSR is of great practical engineering significance. Based on the HSR long-span continuous bridges, the integrative spatial finite element model of track-bridge-pier-foundation system was established with the nonlinear spring element simulating the longitudinal resistance between track and bridge. Comparative study on the various additional longitudinal forces of CWR using the common fasteners and small resistance fasteners was carried out. Analysis results indicate that the additional expansion forces and additional rail-breaking forces in long-span ballastless continuous girders can be reduced evidently by 40% 50% after adopting small resistance fasteners, but lead to greater rail broken gap. The small resistance fasteners have little influence on the additional force only caused by vertical load, but can reduce the additional force caused by vertical load combined with braking load by over 10%. Besides, transient analysis method is proved to be more accurate and safe in calculating additional longitudinal forces when the train running or braking on the bridge, compared with the traditional static method. 展开更多
关键词 ballastless track small resistance fasteners additional longitudinal force long-span continuous beam high-speed railway
下载PDF
Application of Mobile Formwork Cast-In-Situ Beam Technology in Bridge Construction
16
作者 Xiangwei Zheng 《Journal of World Architecture》 2022年第2期25-28,共4页
The application of mobile formwork cast-in-situ beam technology is conducive to providing quality assurance for bridge constructions.At the same time,it can improve the overall mechanization level of the construction ... The application of mobile formwork cast-in-situ beam technology is conducive to providing quality assurance for bridge constructions.At the same time,it can improve the overall mechanization level of the construction process and further accelerate the construction progress,so as to shorten the construction period and improve the economic benefits of enterprises.In fact,this construction method has been widely applied.In order to assure a positive outcome from the use of this technology,this paper analyzes the application of mobile formwork cast-in-situ beam technology in bridge construction to provide reference. 展开更多
关键词 Bridge construction Mobile formwork cast-in-situ beam technology Application measures
下载PDF
基于主线不停运的城轨支线独立运营改造方案
17
作者 戴志仁 李岩龙 +2 位作者 王泽宇 杨学金 张维驿 《铁道工程学报》 EI CSCD 北大核心 2024年第2期93-99,共7页
研究目的:针对大型铁路枢纽接入已运营轨道交通线路引起的既有线改造问题,为满足铁路枢纽与轨道交通连接线(支线)施工期间主线正常运营不受影响,对改造涉及的运营组织与接轨方案进行系统研究,并对土建、轨道、接触网、环网与动照、信号... 研究目的:针对大型铁路枢纽接入已运营轨道交通线路引起的既有线改造问题,为满足铁路枢纽与轨道交通连接线(支线)施工期间主线正常运营不受影响,对改造涉及的运营组织与接轨方案进行系统研究,并对土建、轨道、接触网、环网与动照、信号、综合监控与通信系统等的改造及影响进行深入研究,在统筹考虑实施难度、投资与工期的基础上,提出实施风险最小、技术最合理的改造方案。研究结论:(1)既有高架车站与区间改造影响范围较小且相对可控,可以实现主线正常运营情况下新建独立运营支线工程;(2)为最大程度保障主线运营不受影响,在现有技术水平条件下,应尽量避免在运营天窗期进行各类信号光电缆的割接;(3)支线独立运营方案,应尽量采取措施将新建支线与主线相连、轨道相通,以利于车辆检修与维保,并增加运营的灵活性;(4)桥梁浇筑与平移施工临近既有线,实施阶段应进一步完善工艺衔接与交叉施工统筹,增加既有线安全保障;(5)本研究结论可为类似工程提供参考。 展开更多
关键词 运营线路 主线 支线 实施风险 简支梁 连续梁 信号 帮接扩建
下载PDF
钢筋混凝土连续梁抗连续倒塌压拱机制的数值分析
18
作者 李易 刘永超 +1 位作者 程小卫 孙海林 《北京工业大学学报》 CAS CSCD 北大核心 2024年第11期1350-1358,共9页
为了验证既有结构抗连续倒塌压拱(compressive arch action,CAA)机制理论在工程尺度中的适用性问题,基于有限元分析软件LS-DYNA建立了钢筋混凝土连续梁的全精细数值模型,并通过已有实验验证了该模型的可靠性。基于该模型建立9个足尺结... 为了验证既有结构抗连续倒塌压拱(compressive arch action,CAA)机制理论在工程尺度中的适用性问题,基于有限元分析软件LS-DYNA建立了钢筋混凝土连续梁的全精细数值模型,并通过已有实验验证了该模型的可靠性。基于该模型建立9个足尺结构的数值模型,考虑了工程常用的截面高度、跨度和配筋率。基于数值模拟的结果,分析了上述结构参数对CAA机制发展的影响。结果表明:随着配筋率的增大,CAA机制对结构抗连续倒塌的增强作用逐渐降低;在9~12的跨高比范围内,CAA机制对结构抗连续倒塌的增强作用提升,而在12~15的跨高比范围内,增强作用降低。 展开更多
关键词 钢筋混凝土 连续梁 连续倒塌 压拱(compressive arch action CAA)机制 倒塌抗力 倒塌变形
下载PDF
多跨连续梁自由振动的动态有限元分析
19
作者 夏桂云 刘明暕 温睿 《振动与冲击》 EI CSCD 北大核心 2024年第15期150-159,共10页
利用Timoshenko梁振动微分方程的奇次解,建立了单元任意截面的变形、内力与节点位移的关系,取端点截面的内力得到动态有限元列式。动态有限元具有不依赖网格密度、可准确计算任意阶次的振动频率和振型等特点。利用动态有限元刚度矩阵行... 利用Timoshenko梁振动微分方程的奇次解,建立了单元任意截面的变形、内力与节点位移的关系,取端点截面的内力得到动态有限元列式。动态有限元具有不依赖网格密度、可准确计算任意阶次的振动频率和振型等特点。利用动态有限元刚度矩阵行列式为0条件,推导出1~4跨等截面等跨径的多跨连续梁频率方程。分析了多跨连续梁的自由振动,结果表明:相应简支梁的频率为多跨连续梁的固有频率、振型经扩展后为多跨连续梁的振型;多跨连续梁的振动有第二频谱现象和梁高振动特征。 展开更多
关键词 动态有限元 多跨连续梁 频率方程 模态 第二频谱 梁高振动
下载PDF
风屏障透风率对强风作用下重载铁路刚构-连续梁车桥耦合振动响应的影响
20
作者 郭向荣 查万祺 何旭辉 《中国铁道科学》 EI CAS CSCD 北大核心 2024年第4期57-65,共9页
为探究风屏障透风率对强风作用下重载铁路刚构-连续梁车桥耦合振动的影响,先通过节段模型风洞试验获取桥上设置0%,20%,40%,60%和无风屏障5种不同透风率风屏障时车桥系统的三分力系数,再根据弹性系统动力学总势能不变原理建立风-车-桥耦... 为探究风屏障透风率对强风作用下重载铁路刚构-连续梁车桥耦合振动的影响,先通过节段模型风洞试验获取桥上设置0%,20%,40%,60%和无风屏障5种不同透风率风屏障时车桥系统的三分力系数,再根据弹性系统动力学总势能不变原理建立风-车-桥耦合振动仿真计算分析模型,对不同车速下重载货运列车通过设置不同透风率风屏障刚构-连续梁桥开展风-车-桥系统动力学仿真计算与分析研究。结果表明:在列车上桥初期,桥梁横向位移峰值随透风率的增大而明显减小,而当列车运行趋于满布桥梁时,桥梁的横向位移峰值随透风率的增大变化不明显;列车的动力响应峰值随风屏障透风率的增大而增大,相比于满载编组列车,空载和轻重混编编组列车的动力响应对风屏障透风率的变化更加敏感。综合桥梁动力响应和列车走行安全性评价指标(脱轨系数和轮重减载率),该桥梁应设置40%透风率的风屏障。 展开更多
关键词 重载铁路 刚构-连续梁桥 风屏障 透风率 风车桥耦合振动 行车安全
下载PDF
上一页 1 2 217 下一页 到第
使用帮助 返回顶部