期刊文献+
共找到270篇文章
< 1 2 14 >
每页显示 20 50 100
Spatio-temporal distribution of phytoplankton in the Danjiangkou Reservoir, a water source area for the South-to-North Water Diversion Project (Middle Route), China 被引量:12
1
作者 殷大聪 郑凌凌 宋立荣 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2011年第3期531-540,共10页
One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR ... One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR area before water diversion, as well as to estimate potential risks of water quality after water diversion, we conducted an investigation on phytoplankton in the DJKR from August 2008 to May 2009. The investigation included 10 sampling sites, each with four depths of 0.5, 5, 10, and 20 m. In this study, 117 taxa belonging to 76 genera were identified, consisting of diatoms (39 taxa), green algae (47 taxa), blue-green algae (19 taxa), and others (12 taxa). Annual average phytoplankton abundance was 2.01×10^6 ind./L, and the highest value was 14.72 ×10^6 ind/L (at site 3 in August 2008). Phytoplankton abundance in front of the Danjiangkou Dam (DJKD) was higher than that of the Danjiang Reservoir Basin. Phytoplankton distribution showed a vertical declining trend from 0.5 m to 20 m at most sites in August 2008 (especially at sites of 1, 2, 4 and 10), but no distinct pattern in other sampling months. In December 2008 and March 2009, Stephanodiseus sp. was the most abundant species, amounting to 55.23% and 72.34%, respectively. We propose that high abundance ofStephanodiscus sp. may have contributed greatly to the frequent occurrence of Stephanodiscus sp. blooms in middle-low reaches of the Hanjiang River during the early spring of 2009. In comparison with previous studies conducted from 1992 to 2006, annual average phytoplankton density, green algae and blue-green algae species, as well as major nutrient concentrations increased, while phytoplankton diversity indices declined. This indicates a gradual decline in water quality. More research should be conducted and countermeasures taken to prevent further deterioration of water quality in the DJKR. 展开更多
关键词 Danjiangkou Reservoir PHYTOPLANKTON south-to-north water diversion project EUTROPHICATION
下载PDF
Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North Water Diversion Project 被引量:3
2
作者 Jing-chun FENG Lei LI +4 位作者 Nan YANG Yu-zhen HONG Min PANG Xiong YAO Li-cheng WANG 《Water Science and Engineering》 EI CAS 2011年第2期225-236,共12页
Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the sy... Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields. 展开更多
关键词 multi-resource constraints south-to-north water diversion project project portfolio critical chain
下载PDF
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:4
3
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification Middle Route of the south-to-north water diversion project(MR-SNWDP) China
下载PDF
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period 被引量:3
4
作者 Feng Jingchun Zhou Yang +2 位作者 Hong Yuzhen Zhao Shixin Ren Xiaoqiang 《Water Science and Engineering》 EI CAS 2008年第4期107-113,共7页
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connectio... In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up. 展开更多
关键词 south-to-north water diversion project reliability model management chain parallel connection series connection
下载PDF
Wet-Dry Runoff Correlation in Western Route of South-to-North Water Diversion Project,China 被引量:2
5
作者 HUANG Xiao-rong ZHAO Jing-wei YANG Peng-peng 《Journal of Mountain Science》 SCIE CSCD 2015年第3期592-603,共12页
The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upst... The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upstream of the Yellow River (water- importing area). The long-term hydrologieal data from 14 stream gauging stations in the Western Route area and techniques including the pre-whitening approach, non-parametric test, Bayes, law, variance analysis extrapolation, and Wavelet Analysis are applied to identify the streamflow eharacteristics and trends, streamflow time series cross-correlations, wetness-dryness encountering probability, and periodicities that occurred over the last 50 years. The results show that the water-exporting area, water- importing area, and the streteh downstream of the water-exporting have synehronization in high-low flow relationship, whereas they display non- synchronization in long-term evolution. This corresponds to the complicated and variable climate of the plateau region. There is no obvious increasing or decreasing trend in runoff at any gauging station. The best hydrological eompensation probability for rivers where water is diverted is about 25% to lO%, and those rivers influenced significantly by diversion are the Jinsha and Yalong rivers. Proper planning and design of compensation reservoirs for the water-exporting area and stretch downstream of the water- exporting area can increase the hydrological compensation possibility from water-exporting area to the water-importing area, and reduce the impact on the stretch of river downstream of the water- exporting area. 展开更多
关键词 south-to-north water diversion project Yangtze River Streamflow Encounter probability Correlation coefficient Cycle Hydrologicalcompensation
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
6
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model south-to-north water diversion project
下载PDF
IMPACTS OF THE SOUTH-TO-NORTH WATER DIVERSION PROJECTS (MIDDLE ROUTE)ON THE WATER ENVIRONMENT OF THE MIDDLE AND LOWER REACHES OF THE HANJIANG RIVER
7
作者 FAN Bei-Lin, WAN Jian-Rong, ZHANG Jie and LIN Qiu-Sheng (Yangtze River Scientific Research Institute,River Research Deparment, Wuhan 430010,China) 《水生生物学报》 CAS CSCD 北大核心 2006年第6期643-646,共4页
In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well... In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well as their impacts on the environment of the middle and lower reaches of the Hanjiang River. The results showed that the 95×10 8m 3 water diversion scheme will cause less erosion and water level decrease than the 15×10 8m 3 water diversion scheme. Using a water diversion scheme of 95×10 8m 3, the decrease of water quantity can impact the river hydrodynamic regime substantially and the environments of the middle and lower reaches of the Hanjiang River will be greatly affected. It is therefore necessary to develop new water resources or build projects to meet the need of the environment and the needs for navigation. 展开更多
关键词 south-to-north water diversion project River regime water environment Mathematical model
下载PDF
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
8
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec... Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years. 展开更多
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water Transfer project
下载PDF
Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project 被引量:2
9
作者 XuechaoWang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第3期234-243,共10页
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel... In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed. 展开更多
关键词 the Western Route of south-to-north water Transfer project rock mechanics issues classification of surrounding rocks stability of surrounding rocks excavation-induced damage lining design
下载PDF
Water diversion and agricultural production:Evidence from China 被引量:1
10
作者 YANG Rui XU Hang 《Journal of Integrative Agriculture》 SCIE CAS CSCD 2023年第4期1244-1257,共14页
Water diversion can alleviate water shortages caused by the uneven distribution of water resources.China’s Southto-North Water Diversion Project(SNWD)is the largest water diversion project worldwide.Based on the pref... Water diversion can alleviate water shortages caused by the uneven distribution of water resources.China’s Southto-North Water Diversion Project(SNWD)is the largest water diversion project worldwide.Based on the prefecturelevel data of China’s Huang-Huai-Hai Plain from 2000 to 2020,this study employs an empirical strategy of Differencesin-Differences(DID)to analyze the impact of SNWD on agricultural production.The results show that SNWD has significantly increased agricultural production,measured by the agricultural value added.The estimated results of the benchmark model remain robust when the contemporaneous policy is addressed,an alternative outcome is used,subsamples are estimated,and alternative estimation techniques are employed.This study argues that the potential impact mechanism may be that SNWD significantly increases the acreage for cash crops but reduces that for grain crops.Heterogeneity analysis shows that in prefectures with high temperature or land potential,SNWD’s impact on agricultural value added is relatively low.In contrast,in areas with prolonged sunshine or high slopes,SNWD’s impact on agricultural value added is relatively large.Given the low added value of grain crops,the government should consider strengthening food security by subsidizing water supply to sustain grain production. 展开更多
关键词 south-to-north water diversion project agricultural production Differences-in-Differences China
下载PDF
Water-saving potential evaluation of water-receiving regions in Shandong province on the East Route of the South-to-North Water Transfer Project of China
11
作者 YIN Xiao-lin GAO Yuan-yuan +1 位作者 WU Hai-ping ZHAO Xue-ming 《Journal of Groundwater Science and Engineering》 2020年第3期287-297,共11页
Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route... Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route of the South-to-North(MRSNWDP),the current water-saving potential of the water-receiving areas within the municipalities of Shandong was analyzed.Different water-saving scenarios were constructed and analyzed with key water-saving indexes in various industries.These indexes include the effective utilization coefficient of farmland irrigation water,total water consumption of industrial sectors with an added value of over 10000 RMB,average leakage rate of the urban public water supply pipe network and the penetration rate of water-saving appliances.Based on the scenarios,comprehensive water-saving potential of the 13 water-receiving area cities was calculated.The results show that the water-saving potential of the study area is at a relative high level.However,some cities still have a certain amount of water-saving potential for agriculture and industry to be elevated.Under the recommended water-saving scenario,the water-saving potential is 1.134 billion m3,accounting for 5.33%of the current total water consumption,of which 460 million m3 is in agriculture,600 million m3 in industry,is and 74.20 million m3 in urban domestic sector.Comprehensive water-saving measures for the study area were proposed from the aspects of agricultural,industrial and domestic water uses.Agricultural and industrial water saving are more significant.The major cities for agricultural water saving include Jining City,Heze City,Weifang City and Jinan City;the focus cities of industrial water saving mainly include Weihai City,Jining City and Qingdao City and etc.;the key water-saving areas for urban use mainly include Zaozhuang City,Jining City and Heze City. 展开更多
关键词 East Route of south-to-north water diversion project Shandong water receiving area water-saving level water-saving potential
下载PDF
On conservation and development of architecture and environment in the construction of large-scale national infrastructure——Exemplified by the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project 被引量:1
12
作者 DUAN Jin ,LUO JianLi,WANG XingPing,TANG Jun&YU Gang School of Architecture,Southeast University,Nanjing 210096,China 《Science China(Technological Sciences)》 SCIE EI CAS 2009年第12期3613-3625,共13页
The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through ... The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined. 展开更多
关键词 Jiangsu Section of Eastern Route south-to-north water diversion project CANAL culture routes water resources heritage CORRIDORS landscape and RECREATION CORRIDORS town economic CORRIDORS synthetical ZONING and grading
原文传递
Application of SEDEA to evaluation of degree of harmony between water resources and economic development 被引量:1
13
作者 Jun MA Chui-yong ZHENG 《Water Science and Engineering》 EI CAS 2011年第1期110-120,共11页
This paper introduces the method of data envelopment analysis (DEA) for evaluation of the degree of harmony between water resources and economic development of the water conservancy area of China's South-to-North W... This paper introduces the method of data envelopment analysis (DEA) for evaluation of the degree of harmony between water resources and economic development of the water conservancy area of China's South-to-North Water Diversion Project (SNWDP). For this evaluation, a super-efficiency DEA (SEDEA) model was developed based on the super-efficiency method. To verify the applicability of the SEDEA model, both the SEDEA model and a normal-efficiency DEA (NEDEA) model were used to evaluate the degree of harmony between water resources and economic development of typical cities in the SNWDP water conservancy area. The results show that the SEDEA model ranks the degree of harmony of typical cities more efficiently than the NEDEA model, and thus can better evaluate the degree of harmony between water resources and economic development of different cities than the NEDEA model. Furthermore, the SEDEA model can be applied as an operational research tool in regional water resources management. 展开更多
关键词 degree of harmony super-efficiency DEA model water conservancy area south-to-north water diversion project
下载PDF
岩溶隧洞突涌水灾害风险评价研究 被引量:1
14
作者 江新 陈婧 +3 位作者 赵力 张腾飞 邱国坤 李骏骁 《人民长江》 北大核心 2024年第4期169-177,共9页
受复杂地质条件的影响,岩溶隧洞在施工过程中极易发生突涌水灾害。为准确评估岩溶隧洞突涌水风险等级,将结构方程模型(SEM)与改进的模糊综合评价法(FCEM)相结合,构建岩溶隧洞突涌水风险评价模型。从地形地貌、气象水文、地层因素、地质... 受复杂地质条件的影响,岩溶隧洞在施工过程中极易发生突涌水灾害。为准确评估岩溶隧洞突涌水风险等级,将结构方程模型(SEM)与改进的模糊综合评价法(FCEM)相结合,构建岩溶隧洞突涌水风险评价模型。从地形地貌、气象水文、地层因素、地质构造、岩溶水文地质、施工因素6个方面深入研究;利用SEM确定各指标标准化路径系数并求得其权重,运用改进FCEM法对岩溶隧洞突涌水风险等级进行评价;以滇中引水工程昆呈隧洞为应用实例,利用Crystal Ball软件验证模型的有效性。结果表明:昆呈隧洞有90%的几率处于52~73分值区间范围内(Ⅲ级风险),与现场实际情况一致,表明基于SEM-改进FCEM法构建的岩溶隧洞突涌水风险评价模型具有一定的适用性;其中岩溶水文地质、地质构造、气象水文是该隧洞的主要影响因素,施工中应加强对这几方面的监控和量测,避免发生突涌水灾害。研究成果可为类似岩溶隧洞工程提供参考。 展开更多
关键词 岩溶隧洞 突涌水 结构方程模型(SEM) 改进模糊综合评价法(FCEM) 蒙特卡洛模拟 昆呈隧洞 滇中引水工程
下载PDF
南水北调中线受水区全要素水资源绿色效率及节水减排潜力
15
作者 薛宝琪 范红艳 《地域研究与开发》 CSSCI 北大核心 2024年第5期138-144,共7页
采用非径向、非角度SBM-DEA模型测算2015—2021年南水北调中线受水区20个城市全要素水资源绿色效率,探究其时空演变规律,并分析各市节水减排潜力。结果表明:受水区全要素水资源绿色效率总体呈现以京津冀、郑州两大都市圈为核心向外围逐... 采用非径向、非角度SBM-DEA模型测算2015—2021年南水北调中线受水区20个城市全要素水资源绿色效率,探究其时空演变规律,并分析各市节水减排潜力。结果表明:受水区全要素水资源绿色效率总体呈现以京津冀、郑州两大都市圈为核心向外围逐渐递减的“核心-外围”空间结构模式以及全要素水资源绿色效率由高到低依次为京津、河南、河北的空间分异规律;2015—2021年受水区全要素水资源绿色效率总体呈波动上升趋势,但仍处于较低水平,仅实现了最优效率的70%~85%;不同城市节水减排潜力差异显著,空间上呈现“南高北低、西高东低”的分布格局。 展开更多
关键词 SBM-DEA模型 全要素水资源绿色效率 节水潜力 减排潜力 南水北调中线
下载PDF
敞开式TBM开挖隧洞围岩变形安全评价方法及应用 被引量:1
16
作者 刘登学 孔勇斌 +2 位作者 寇甲兵 黄书岭 张雨霆 《人民长江》 北大核心 2024年第6期182-187,共6页
当TBM开挖隧洞遭遇不良地质条件下的围岩大变形地质灾害时,通常会造成卡机或侵限等风险。开展TBM开挖隧洞围岩变形安全评价工作对降低卡机或侵限等风险具有重要的现实意义。通过分析敞开式TBM开挖隧洞围岩变形特点,建立了敞开式TBM开挖... 当TBM开挖隧洞遭遇不良地质条件下的围岩大变形地质灾害时,通常会造成卡机或侵限等风险。开展TBM开挖隧洞围岩变形安全评价工作对降低卡机或侵限等风险具有重要的现实意义。通过分析敞开式TBM开挖隧洞围岩变形特点,建立了敞开式TBM开挖隧洞围岩变形安全评价方法。该方法通过采用三维数值分析和围岩变形现场监测手段,可获得围岩在护盾区间以及出露护盾后的变形,从而实现敞开式TBM开挖隧洞围岩变形安全性判别。在滇中引水工程香炉山隧洞的工程应用表明,所提方法能够有效判别不同支护方案下的围岩变形安全性,从而为敞开式TBM开挖隧洞施工期支护方案实时调整提供依据。 展开更多
关键词 TBM 围岩变形 安全评价 卡机 侵限 香炉山隧洞 滇中引水工程
下载PDF
物元可拓法在引水隧洞围岩稳定性评价中的应用 被引量:4
17
作者 张书豪 艾亚鹏 +2 位作者 陈健 靳春玲 姬照泰 《安全与环境学报》 CAS CSCD 北大核心 2024年第1期10-18,共9页
为预防和控制引水隧洞中围岩失稳事故的发生,将物元可拓法应用于围岩稳定性评价中。以滇中引水工程为背景,选取滇中引水工程某隧洞段,构建引水隧洞围岩稳定性评价指标体系,划分围岩等级,选用灰色关联分析法(Grey Relational Analysis, G... 为预防和控制引水隧洞中围岩失稳事故的发生,将物元可拓法应用于围岩稳定性评价中。以滇中引水工程为背景,选取滇中引水工程某隧洞段,构建引水隧洞围岩稳定性评价指标体系,划分围岩等级,选用灰色关联分析法(Grey Relational Analysis, GRA)和因子分析法(Factor Analysis, FA)组合确定权重,基于物元可拓模型进行引水隧洞围岩稳定性评价,以期减少目前评价方法中一些不相容现象及其他问题所带来的影响,从而提升长距离特大输水工程围岩稳定性等级评价的精度。结果表明,GRA-FA-物元可拓模型围岩稳定性评价结果与实际等级基本相符,与逼近理想解排序法(Technique for Order Preference by Similarity to Ideal Solution, TOPSIS)相比,预测评价精度从62.5%提升到87.5%,准确性提升了约25百分点。因此,GRA-FA-物元可拓模型相较以往的评价模型可以更全面和客观地进行引水隧洞围岩稳定性评价,可为其他长距离特大引水工程施工风险评价提供理论支撑。 展开更多
关键词 安全工程 滇中引水工程 围岩稳定性 灰色关联分析法 因子分析法 物元可拓模型
下载PDF
南水北调中线工程突发水污染生态补偿机制研究 被引量:1
18
作者 刘钢 李睿萌 +1 位作者 段睿睿 牛富 《华北水利水电大学学报(自然科学版)》 北大核心 2024年第2期101-108,共8页
突发水污染已成为制约南水北调中线工程可持续调水的重大安全隐患,亟须解决南水北调中线工程突发水污染的生态补偿机制设计问题。针对应由中线局承担责任的南水北调中线干渠突发水污染场景,从多利益相关者合作视角出发,明确了中线局向... 突发水污染已成为制约南水北调中线工程可持续调水的重大安全隐患,亟须解决南水北调中线工程突发水污染的生态补偿机制设计问题。针对应由中线局承担责任的南水北调中线干渠突发水污染场景,从多利益相关者合作视角出发,明确了中线局向纳污地政府提供生态补水的突发水污染生态补偿机制,基于合作博弈理论,构建了中线局与纳污地政府合作联盟的纳什议价模型,并以河南省邓州市为例开展研究,主要研究结果表明:①生态补水天数与纳污总损失呈现出显著的正向相关关系,且伴随纳污总损失逐步增大,中线局议价能力对补水天数的影响能力呈现出边际递减特征。②中线局生态补水成本与生态补水天数具有显著的正向关系,随着中线局议价能力的增强,生态补水成本的规模效益呈现一定的弱化趋势。③在一定的生态补水规模范围内,中线局与纳污地政府能够达成有效的合作联盟。 展开更多
关键词 南水北调中线工程 突发水污染 纳什议价博弈 生态补偿机制
下载PDF
跨活断层隧洞抗错断技术模型试验研究 被引量:1
19
作者 曹俊 崔臻 +1 位作者 颜天佑 李建贺 《人民长江》 北大核心 2024年第1期200-207,共8页
长大隧洞工程不可避免地要跨越活动断裂带及其影响区域,为减少因断层错动而导致的隧洞结构破坏,抗错断设计是隧洞设计的重要内容。以滇中引水工程香炉山隧洞为背景,对包括铰接设计、扩挖-缓冲层设计以及铰接-扩挖-缓冲层在内的3种抗错... 长大隧洞工程不可避免地要跨越活动断裂带及其影响区域,为减少因断层错动而导致的隧洞结构破坏,抗错断设计是隧洞设计的重要内容。以滇中引水工程香炉山隧洞为背景,对包括铰接设计、扩挖-缓冲层设计以及铰接-扩挖-缓冲层在内的3种抗错断措施进行模型试验研究;从衬砌内部破坏、隧洞整体破坏、衬砌应变方面,对上述3种抗错断措施抗断效果进行了验证评估。研究结果表明:(1)从隧洞衬砌结构内部破坏特征来看,铰接设计与扩挖-缓冲层设计都可以对衬砌起到保护作用。(2)从隧洞整体变形和裂纹分布来看,使用铰接设计增大了隧洞在断层带区域的变形程度,但减小了衬砌本身的破坏;使用扩挖-缓冲层设计不仅减小了隧洞在断层带区域的变形,同时也相对减小了对衬砌本身的破坏,经铰接-扩挖-缓冲层设计的隧洞变形几乎只出现在铰接处,衬砌破坏更小。(3)从隧洞纵向应变分布规律来看,扩挖设计和铰接设计都减小了衬砌的应变,其中铰接设计对衬砌应变的减弱最为突出。相关研究成果可为跨活断裂隧洞实际工程中抗错断方案的选用提供参考。 展开更多
关键词 隧洞工程 活动断裂带 抗错段技术 铰接设计 扩挖设计 香炉山隧洞 滇中引水工程
下载PDF
滇中引水工程水源区水沙关系及悬移质含沙量预测方法研究 被引量:2
20
作者 陈晶 张天力 顾世祥 《水电能源科学》 北大核心 2024年第1期74-78,共5页
滇中引水工程水源状况对供水至关重要,为全面了解工程水源区的水量和悬移质含沙量特性,分析悬移质含沙量未来情势,依据水源区石鼓水文站资料系列,基于水文随机分析、小波分析、Copula函数等方法研究石鼓站水与沙的变化趋势及周期规律、... 滇中引水工程水源状况对供水至关重要,为全面了解工程水源区的水量和悬移质含沙量特性,分析悬移质含沙量未来情势,依据水源区石鼓水文站资料系列,基于水文随机分析、小波分析、Copula函数等方法研究石鼓站水与沙的变化趋势及周期规律、联合分布及相依变化情况,在此基础上提出一种悬移质含沙量模拟及预测模型。研究结果表明,石鼓站流量和悬移质含沙量的年际、年内分配不均匀;水沙组合的同现重现期最大、联合重现期次之、条件重现期最小,同步遭遇概率远大于异步遭遇概率;未来丰、平、枯水情景下的多年平均悬移质含沙量分别为0.639、0.597、0.562 kg/m^(3),较1955~2019年实测的0.586 kg/m^(3)分别增长了9.0%、1.9%、-4.1%,3种情景下悬移质含沙量均呈上升发展趋势。研究成果从水沙分析角度为滇中引水工程供水调度、含沙量预估等提供了决策依据。 展开更多
关键词 滇中引水工程 水沙关系 COPULA函数 模拟 预测
下载PDF
上一页 1 2 14 下一页 到第
使用帮助 返回顶部