Waveforms of seismic events,extracted from January 2019 to December 2021 were used to construct a test dataset to investigate the generalizability of PhaseNet in the Shandong region.The results show that errors in the...Waveforms of seismic events,extracted from January 2019 to December 2021 were used to construct a test dataset to investigate the generalizability of PhaseNet in the Shandong region.The results show that errors in the picking of seismic phases(P-and Swaves)had a broadly normal distribution,mainly concentrated in the ranges of−0.4–0.3 s and−0.4–0.8 s,respectively.These results were compared with those published in the original PhaseNet article and were found to be approximately 0.2–0.4 s larger.PhaseNet had a strong generalizability for P-and S-wave picking for epicentral distances of less than 120 km and 110 km,respectively.However,the phase recall rate decreased rapidly when these distances were exceeded.Furthermore,the generalizability of PhaseNet was essentially unaffected by magnitude.The M4.1 earthquake sequence in Changqing,Shandong province,China,that occurred on February 18,2020,was adopted as a case study.PhaseNet detected more than twice the number of earthquakes in the manually obtained catalog.This further verified that PhaseNet has strong generalizability in the Shandong region,and a high-precision earthquake catalog was constructed.According to these precise positioning results,two earthquake sequences occurred in the study area,and the southern cluster may have been triggered by the northern cluster.The focal mechanism solution,regional stress field,and the location results of the northern earthquake sequence indicated that the seismic force of the earthquake was consistent with the regional stress field.展开更多
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de...Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.展开更多
High energy gas fracturing provides a new way for economic and high efficient development of the low permeability reservoir.By the end of 1993,it is tested and used in more:than 50 oil production and water injection w...High energy gas fracturing provides a new way for economic and high efficient development of the low permeability reservoir.By the end of 1993,it is tested and used in more:than 50 oil production and water injection wells in Changqing Oilfield with treatment success rate of more than 92%,and treatment effective rate of 86%,with average increase of oil production 3.4 times and somewhat increase.of water iniectivity in the water wells,cumulative increment of oil produc-tion and water injection had reached 11660 tons and 39220 cubic meters respectively.The test was undertaken by 0il Drilling&Production Tech-nology Research Institute in collaboration with Oil Production Plant,both are subordinated to Changqing Petroleum Exploration Bureau.展开更多
基金funded by the General Scientific Research Project of the Shandong Earthquake Agency(No.YB2202)the National Key Research and Development Program Project(No.2021YFC3000700)a Key Project under the Natural Science Foundation of Shandong Province(No.ZR2020KF003).
文摘Waveforms of seismic events,extracted from January 2019 to December 2021 were used to construct a test dataset to investigate the generalizability of PhaseNet in the Shandong region.The results show that errors in the picking of seismic phases(P-and Swaves)had a broadly normal distribution,mainly concentrated in the ranges of−0.4–0.3 s and−0.4–0.8 s,respectively.These results were compared with those published in the original PhaseNet article and were found to be approximately 0.2–0.4 s larger.PhaseNet had a strong generalizability for P-and S-wave picking for epicentral distances of less than 120 km and 110 km,respectively.However,the phase recall rate decreased rapidly when these distances were exceeded.Furthermore,the generalizability of PhaseNet was essentially unaffected by magnitude.The M4.1 earthquake sequence in Changqing,Shandong province,China,that occurred on February 18,2020,was adopted as a case study.PhaseNet detected more than twice the number of earthquakes in the manually obtained catalog.This further verified that PhaseNet has strong generalizability in the Shandong region,and a high-precision earthquake catalog was constructed.According to these precise positioning results,two earthquake sequences occurred in the study area,and the southern cluster may have been triggered by the northern cluster.The focal mechanism solution,regional stress field,and the location results of the northern earthquake sequence indicated that the seismic force of the earthquake was consistent with the regional stress field.
文摘Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.
文摘High energy gas fracturing provides a new way for economic and high efficient development of the low permeability reservoir.By the end of 1993,it is tested and used in more:than 50 oil production and water injection wells in Changqing Oilfield with treatment success rate of more than 92%,and treatment effective rate of 86%,with average increase of oil production 3.4 times and somewhat increase.of water iniectivity in the water wells,cumulative increment of oil produc-tion and water injection had reached 11660 tons and 39220 cubic meters respectively.The test was undertaken by 0il Drilling&Production Tech-nology Research Institute in collaboration with Oil Production Plant,both are subordinated to Changqing Petroleum Exploration Bureau.