The clearing price and bidding price in electricity market are two key indicators to measure whether it is reasonable or not. Based on the grey incidence analysis, this paper studies the correlation coefficient betwee...The clearing price and bidding price in electricity market are two key indicators to measure whether it is reasonable or not. Based on the grey incidence analysis, this paper studies the correlation coefficient between the clearing price and bidding price with the generation cost, the supervision and rules of the market, the supply and demand situation, the behavior of market members over the same period, which is based on the actual data of the trans-provincial centralized trading market of East China Power Grid. The results show that the factors affecting the clearing price and bidding price from largest to smallest are generation cost, supervision and rules of the market, the supply and demand situation, the behavior of market members. The conclusion is that the trans-provincial trading platform of East China Power Grid is a reasonable regional market which can discover the market cost, and regulate the market supply and demand balance, and promote healthy competition.展开更多
In this paper a novel cost function based on the relationship between operation cost of unit and generation load rate is employed in an agent-based model of Trans-provincial Centralized Bidding Trading Market of East ...In this paper a novel cost function based on the relationship between operation cost of unit and generation load rate is employed in an agent-based model of Trans-provincial Centralized Bidding Trading Market of East China Grid. Simulation results are compared to real data to prove that the model is correct. Further analysis on simulation results point out the way to achieve an all-win game for power market members: generation companies improve their average load rates of the units by selling their electricity in the market, which makes units' cost drop and settlement price stay lower than benchmark price. Consequently electricity-demand provinces saved expenses, and units increase their profits. In conclusion, the trans-provincial electricity market of East China Power Grid is a successive case which improves the efficiency of the electricity industry by market-oriented measures.展开更多
Being abundant in hydropower, coal, wind energy and solar energy etc., Northwest China is an important energy base with great potential. In recent years, along with the vigorous development of the energy base,
The situation and status of the research work on the next higher transmission voltage for Northwest Power Grid in China are briefly presented in this paper. It has been preliminarily determined that 750 kV will be ado...The situation and status of the research work on the next higher transmission voltage for Northwest Power Grid in China are briefly presented in this paper. It has been preliminarily determined that 750 kV will be adopted as the next higher transmission voltage to the 330 kV being used. In consideration of the temporary slowing down of the growth of electric power industry in Northwest China and the advance of the.research work on nation--wide interconnection, the authors put forward their views on this problem.展开更多
The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 20...The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.展开更多
ASEAN is an interesting case study of regional power connectivity in Asia and the Pacific due to its geographic location and ongoing power connectivity within and beyond ASEAN.This paper reviews ASEAN’s power connect...ASEAN is an interesting case study of regional power connectivity in Asia and the Pacific due to its geographic location and ongoing power connectivity within and beyond ASEAN.This paper reviews ASEAN’s power connectivity within ASEAN and between ASEAN and its neighbours(hereafter ASEAN connectivity).Through literature survey,it identifies challenges to the ASEAN connectivity from political,legal,economic and technical perspectives.Based on these analyses,it then explores what,how and when regional cooperation may be able to facilitate ASEAN power connectivity.展开更多
针对传统的手打拟票、手工记录以及电话下令的业务开展方式已成为操作效率提升的瓶颈,提出在调度指挥控制系统(dispatch command control system,DCCS)上设计调度操作指挥模块。将电话下令转变为网络交互;构建多种基于智能规则的自动成...针对传统的手打拟票、手工记录以及电话下令的业务开展方式已成为操作效率提升的瓶颈,提出在调度指挥控制系统(dispatch command control system,DCCS)上设计调度操作指挥模块。将电话下令转变为网络交互;构建多种基于智能规则的自动成票手段,取代传统的手打出票方式;操作完成后系统可自动记录设备状态信息并通知相关单位,实现调度操作全流程的网络化、信息化与智能化。模块上线运行结果表明,数据显示对调度操作效率的提升作用显著。展开更多
文摘The clearing price and bidding price in electricity market are two key indicators to measure whether it is reasonable or not. Based on the grey incidence analysis, this paper studies the correlation coefficient between the clearing price and bidding price with the generation cost, the supervision and rules of the market, the supply and demand situation, the behavior of market members over the same period, which is based on the actual data of the trans-provincial centralized trading market of East China Power Grid. The results show that the factors affecting the clearing price and bidding price from largest to smallest are generation cost, supervision and rules of the market, the supply and demand situation, the behavior of market members. The conclusion is that the trans-provincial trading platform of East China Power Grid is a reasonable regional market which can discover the market cost, and regulate the market supply and demand balance, and promote healthy competition.
文摘In this paper a novel cost function based on the relationship between operation cost of unit and generation load rate is employed in an agent-based model of Trans-provincial Centralized Bidding Trading Market of East China Grid. Simulation results are compared to real data to prove that the model is correct. Further analysis on simulation results point out the way to achieve an all-win game for power market members: generation companies improve their average load rates of the units by selling their electricity in the market, which makes units' cost drop and settlement price stay lower than benchmark price. Consequently electricity-demand provinces saved expenses, and units increase their profits. In conclusion, the trans-provincial electricity market of East China Power Grid is a successive case which improves the efficiency of the electricity industry by market-oriented measures.
文摘Being abundant in hydropower, coal, wind energy and solar energy etc., Northwest China is an important energy base with great potential. In recent years, along with the vigorous development of the energy base,
文摘The situation and status of the research work on the next higher transmission voltage for Northwest Power Grid in China are briefly presented in this paper. It has been preliminarily determined that 750 kV will be adopted as the next higher transmission voltage to the 330 kV being used. In consideration of the temporary slowing down of the growth of electric power industry in Northwest China and the advance of the.research work on nation--wide interconnection, the authors put forward their views on this problem.
基金Supported by the National Key Technology R&D Program(2012BAC20B1003)the Key National Social Science Fund Project(12&ZD214)the Special Fund Project for the Scientific Research of the Environmental Protection Welfare Industry(201209001)
文摘The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.
基金supported by the National Science Foundation of China (71828401,71873029)
文摘ASEAN is an interesting case study of regional power connectivity in Asia and the Pacific due to its geographic location and ongoing power connectivity within and beyond ASEAN.This paper reviews ASEAN’s power connectivity within ASEAN and between ASEAN and its neighbours(hereafter ASEAN connectivity).Through literature survey,it identifies challenges to the ASEAN connectivity from political,legal,economic and technical perspectives.Based on these analyses,it then explores what,how and when regional cooperation may be able to facilitate ASEAN power connectivity.
文摘针对传统的手打拟票、手工记录以及电话下令的业务开展方式已成为操作效率提升的瓶颈,提出在调度指挥控制系统(dispatch command control system,DCCS)上设计调度操作指挥模块。将电话下令转变为网络交互;构建多种基于智能规则的自动成票手段,取代传统的手打出票方式;操作完成后系统可自动记录设备状态信息并通知相关单位,实现调度操作全流程的网络化、信息化与智能化。模块上线运行结果表明,数据显示对调度操作效率的提升作用显著。