The closed-loop reservoir management technique enables a dynamic and real-time optimal production schedule under the existing reservoir conditions to be achieved by adjusting the injection and production strategies. T...The closed-loop reservoir management technique enables a dynamic and real-time optimal production schedule under the existing reservoir conditions to be achieved by adjusting the injection and production strategies. This is one of the most effective ways to exploit limited oil reserves more economically and efficiently. There are two steps in closed-loop reservoir management: automatic history matching and reservoir production opti- mization. Both of the steps are large-scale complicated optimization problems. This paper gives a general review of the two basic techniques in closed-loop reservoir man- agement; summarizes the applications of gradient-based algorithms, gradient-free algorithms, and artificial intelligence algorithms; analyzes the characteristics and application conditions of these optimization methods; and finally discusses the emphases and directions of future research on both automatic history matching and reservoir production optimization.展开更多
The saving of non-renewable energies, as well as the reduction of emissions into the environment, are two crucial objectives of industrial production. The recovery of post-consumer products associated with the use of ...The saving of non-renewable energies, as well as the reduction of emissions into the environment, are two crucial objectives of industrial production. The recovery of post-consumer products associated with the use of end-of-life products is part of a context of optimization of these objectives. This recovery maximizes the use of resources from end-of-life products in a circular logic while recording the environmental footprint. This study considers a recycling strategy adapted to the need and urgency to reduce greenhouse gas emissions caused by global warming. The proposed model aims to optimize the profits of the circular manufacturing strategies while minimizing operational costs (collection, sorting, recycling), transport, GHG emissions and recycling. In this paper, a compromise between the gains of CM and the costs associated with it was studied. The robustness of the designed model was tested using a case study based on real-world scenarios. A sensitivity analysis was carried out to study the impact of the emission cost on the overall objective, considering the two options currently offered to industries. The obtained results support companies to take the ecological aspect into account and integrate sustainable development into their strategic axes for their logistics supply chains.展开更多
In recent years, the coal safety has been become the urgent problem in China,and severe and fatal coal mine accidents occurred frequently.Must pay attention to coal safety management immediately, because the coal mine...In recent years, the coal safety has been become the urgent problem in China,and severe and fatal coal mine accidents occurred frequently.Must pay attention to coal safety management immediately, because the coal mine accidents not only caused serious economic losses to the country and people but also had negative impact on the society and politics.A closed loop management system was put forward to build to improve the coal safety management.The closed loop management system was formed four parts,identifying the hazard sources, classifying the hidden troubles hazard sources, the risk prealarm and risk control, and the evaluation system.展开更多
An integrated, efficient and effective performance management system, "dynamic performance management system", is presented, which covers the entire performance management process including measures design, analysis...An integrated, efficient and effective performance management system, "dynamic performance management system", is presented, which covers the entire performance management process including measures design, analysis, and dynamic update. The analysis of performance measures using causal loop diagrams, qualitative inference and analytic network process is mainly discussed. A real world case study is carried out throughout the paper to explain how the framework works. A software tool for DPMS, Performance Analyzer, is also introduced.展开更多
Time-to-Digital Converter (TDC) is a key block used as the phase/frequency detector in an All-Digital Phase-Locked Loop (ADPLL). Usually, it occupies a large proportion of ADPLL's total power consumption up to abo...Time-to-Digital Converter (TDC) is a key block used as the phase/frequency detector in an All-Digital Phase-Locked Loop (ADPLL). Usually, it occupies a large proportion of ADPLL's total power consumption up to about 30% to 40%. In this paper, the detailed power consumption of different components in the TDC is analyzed. A Power Management Block (PMB) is presented for the TDC to reduce its power consumption. A 24-bits TDC core with the proposed PMB is implemented in HJTC 0.18 μm CMOS technology. Simulation results show that up to 84% power reduction is achieved using our proposed technique.展开更多
基金the Important National Science & Technology Specific Projects of China (Grant No. 2011ZX05024-004)the Natural Science Foundation for Distinguished Young Scholars of Shandong Province, China (Grant No. JQ201115)+2 种基金the Program for New Century Excellent Talents in University (Grant No. NCET-11-0734)the Fundamental Research Funds for the Central Universities (Grant No. 13CX05007A, 13CX05016A)the Program for Changjiang Scholars and Innovative Research Team in University (IRT1294)
文摘The closed-loop reservoir management technique enables a dynamic and real-time optimal production schedule under the existing reservoir conditions to be achieved by adjusting the injection and production strategies. This is one of the most effective ways to exploit limited oil reserves more economically and efficiently. There are two steps in closed-loop reservoir management: automatic history matching and reservoir production opti- mization. Both of the steps are large-scale complicated optimization problems. This paper gives a general review of the two basic techniques in closed-loop reservoir man- agement; summarizes the applications of gradient-based algorithms, gradient-free algorithms, and artificial intelligence algorithms; analyzes the characteristics and application conditions of these optimization methods; and finally discusses the emphases and directions of future research on both automatic history matching and reservoir production optimization.
文摘The saving of non-renewable energies, as well as the reduction of emissions into the environment, are two crucial objectives of industrial production. The recovery of post-consumer products associated with the use of end-of-life products is part of a context of optimization of these objectives. This recovery maximizes the use of resources from end-of-life products in a circular logic while recording the environmental footprint. This study considers a recycling strategy adapted to the need and urgency to reduce greenhouse gas emissions caused by global warming. The proposed model aims to optimize the profits of the circular manufacturing strategies while minimizing operational costs (collection, sorting, recycling), transport, GHG emissions and recycling. In this paper, a compromise between the gains of CM and the costs associated with it was studied. The robustness of the designed model was tested using a case study based on real-world scenarios. A sensitivity analysis was carried out to study the impact of the emission cost on the overall objective, considering the two options currently offered to industries. The obtained results support companies to take the ecological aspect into account and integrate sustainable development into their strategic axes for their logistics supply chains.
基金Supported by the Research Fund for the Doctoral Program of Higher Education of China(20090095110001)the Ministry of Education Humanities and Social Science(08JA630083)
文摘In recent years, the coal safety has been become the urgent problem in China,and severe and fatal coal mine accidents occurred frequently.Must pay attention to coal safety management immediately, because the coal mine accidents not only caused serious economic losses to the country and people but also had negative impact on the society and politics.A closed loop management system was put forward to build to improve the coal safety management.The closed loop management system was formed four parts,identifying the hazard sources, classifying the hidden troubles hazard sources, the risk prealarm and risk control, and the evaluation system.
文摘An integrated, efficient and effective performance management system, "dynamic performance management system", is presented, which covers the entire performance management process including measures design, analysis, and dynamic update. The analysis of performance measures using causal loop diagrams, qualitative inference and analytic network process is mainly discussed. A real world case study is carried out throughout the paper to explain how the framework works. A software tool for DPMS, Performance Analyzer, is also introduced.
基金Supported by the Tsinghua National Laboratory for Information Science and Technology(TNList)Cross-Discipline Foundationthe National Science and Technology Major Project(No.2010ZX03006-003-01)
文摘Time-to-Digital Converter (TDC) is a key block used as the phase/frequency detector in an All-Digital Phase-Locked Loop (ADPLL). Usually, it occupies a large proportion of ADPLL's total power consumption up to about 30% to 40%. In this paper, the detailed power consumption of different components in the TDC is analyzed. A Power Management Block (PMB) is presented for the TDC to reduce its power consumption. A 24-bits TDC core with the proposed PMB is implemented in HJTC 0.18 μm CMOS technology. Simulation results show that up to 84% power reduction is achieved using our proposed technique.