The SC200 proton therapy superconducting cyclotron was developed by ASIPP (Hefei, China) and JINR (Dubna, Russia). A measurement system was designed to assess the average radial component of the magnetic field (Brav) ...The SC200 proton therapy superconducting cyclotron was developed by ASIPP (Hefei, China) and JINR (Dubna, Russia). A measurement system was designed to assess the average radial component of the magnetic field (Brav) with 15 search coils in the median plane. The winding differences of the search coils affect the measurement accuracy of the Brav. Based on the electromagnetic induction principle, to measure the Brav accurately, this paper focuses on the design and commissioning of the Brav measurement system. The preliminary results confirm that the system design is reasonable and suitable. After testing the search coil at different speeds, the optimal speed was determined as 2.5 mm/s. The relative error was approximately 0.1% under the maximum radial component of the magnetic field Br of 7 G. The measurement precision was up to 1.0×10^-3, which can provide the required measurement tolerance of 3–7 G for Br in the median plane. The commissioning of the Brav measurement system is an important step for Br measurement. It can check and adjust the asymmetry of the superconducting coils (SCs).展开更多
Rural finance is an issue concerned with rural people, improving rural financial management is important to close the relations of cadres and masses, maintain rural stability, and promote rural economic development. T...Rural finance is an issue concerned with rural people, improving rural financial management is important to close the relations of cadres and masses, maintain rural stability, and promote rural economic development. This article explained the main problems of village financial, the needs of introducing commission and agent system of "village-level accounting" for building a new socialist countryside, and the measures of improving commission and agent system of "village-level accounting".展开更多
This paper introduces the process flow, technical parameters and relevant features of Baosteel's No. 8 air separation unit (ASU) with a capacity of 60000m^3/h. It summarizes the commissioning work, which includes t...This paper introduces the process flow, technical parameters and relevant features of Baosteel's No. 8 air separation unit (ASU) with a capacity of 60000m^3/h. It summarizes the commissioning work, which includes the adjustment of the air compressor,the system's naked cooling,the precooling system and the operation adjustment. It also provides detailed analyses on some failures which occurred in the commissioning. Through the modification of the design and the interlocks, the tripping probability of the air compressor was greatly reduced. Through the heating of the system and the control of the water cooler's nitrogen flow,the overproof content of carbon dioxide and fluctuation of oxygen flow were avoided. Nitrogen-block in the argon system was eliminated by the precise control of the argon rectification flow and argon content. All these solutions have been proved to be effective by practice.展开更多
The information system for Ningxia sci-tech special commissioners is an application system for realizing information collection,management and sharing in the entrepreneurial process of sci-tech special commissioners. ...The information system for Ningxia sci-tech special commissioners is an application system for realizing information collection,management and sharing in the entrepreneurial process of sci-tech special commissioners. This paper introduces overall design ideas,system functions,key technologies and realization methods of the information system for Ningxia sci-tech special commissioners. Completion of construction and coming into operation of the information system bring new breakthrough for information management and data statistics of sci-tech special commissioners.展开更多
The NSLS-II (National Synchrotron Light Source II) is a state-of-the-art 3 GeV third generation light source currently under integrated testing and commissioning at Brook_haven National Laboratory. The vacuum system...The NSLS-II (National Synchrotron Light Source II) is a state-of-the-art 3 GeV third generation light source currently under integrated testing and commissioning at Brook_haven National Laboratory. The vacuum systems are monitored by vacuum gauges and ion pump current. The gate valves are controlled by PLC (programmable logic controllers) using voting scheme. EPICS (Experimental Physics and Industrial Control System) application codes provide the high level monitoring and control through the input-output controllers. This paper will discuss the commissioning status of the various aspects of vacuum control system.展开更多
<strong>Purpose:</strong> The purpose of this study is to provide technical information on commissioning the TrueBeam STx 6 MV flattening-filter free (FFF) beam in the RayStation treatment planning system ...<strong>Purpose:</strong> The purpose of this study is to provide technical information on commissioning the TrueBeam STx 6 MV flattening-filter free (FFF) beam in the RayStation treatment planning system (TPS) for stereotactic radiosurgery (SRS) and stereotactic body radiation therapy (SBRT) treatments. <strong>Methods:</strong> For beam modeling, percent depth dose curves, profiles and output factors for jaw-collimated fields and stereotactic cones as well as X-jaws transmission were measured. For multi-leaf collimator (MLC) modeling, MLC model parameters such as offset, gain, curvature, leaf tip width, tongue and groove and transmission were determined and output factors for MLC-collimated fields were measured. Absolute dose calibration was also performed. For beam model and MLC model validation, the American Association of Physicists in Medicine Task Group-119 plans, clinical SRS and SBRT plans and end-to-end testing were performed. <strong>Results:</strong> Beam characteristics of the 6 MV FFF beam agreed well with those in the literature. Validation results showed that our beam model and MLC model were acceptable for SRS and SBRT treatments. <strong>Conclusions:</strong> The technical information and dosimetric data provided in this study will be a useful reference for other clinics/institutions which will commission the same machine energy in the RayStation TPS.展开更多
We present the results of measurements made using the Vero4DRT radiation therapy system, which is not yet widely used, to assist technicians in achieving reliable and safe radiotherapy to the patient. We measured perc...We present the results of measurements made using the Vero4DRT radiation therapy system, which is not yet widely used, to assist technicians in achieving reliable and safe radiotherapy to the patient. We measured percent depth dose, beam profile, and relative scatter factor under water and air conditions. The Vero4DRT system has a 150 × 150-mm fixed secondary collimator. Its multileaf collimator (MLC) design is a single-focus type, with 30 pairs of 5 mm thick leaves at the isocenter, and produces a maximum field size of 150 × 150 mm. Profile measurements were performed using a 0.016-cm<sup>3</sup> ionization chamber (PTW31016 pinpoint chamber;PTW, Freiburg GmbH Germany). A brass build-up cap was used for measurements obtained in air conditions. We present a useful measurement dataset for users of the Vero4DRT system.展开更多
The high-energy photon source(HEPS)is the first fourth-generation synchrotron light source facility in China.The HEPS injector consists of a linear accelerator(Linac)and a full energy booster.The booster captures the ...The high-energy photon source(HEPS)is the first fourth-generation synchrotron light source facility in China.The HEPS injector consists of a linear accelerator(Linac)and a full energy booster.The booster captures the electron beam from the Linac and increases its energy to the value required for the storage ring.The full-energy beam could be injected to the storage ring directly or after“high-energy accumulation.”On November 17,2023,the key booster parameters successfully reached their corresponding target values.These milestone results were achieved based on numerous contributions,including nearly a decade of physical design,years of equipment development and installation,and months of beam commissioning.As measured at the extraction energy of 6 GeV,the averaged beam current and emittance reached 8.57 mA with 5 bunches and 30.37 nm rad with a single-bunch charge of 5.58 nC,compared with the corresponding target values of 6.6 mA and 35 nm rad,respectively.This paper presents the physical design,equipment development,installation,and commissioning process of the HEPS booster.展开更多
In the 1990 s,Russia set up its system of human rights commissioners Although it does not have a long history,the system has been basically established,and it has played an important role in promoting the protection o...In the 1990 s,Russia set up its system of human rights commissioners Although it does not have a long history,the system has been basically established,and it has played an important role in promoting the protection of human rights and social development in Russia,as well as responding to unfriendly comments from the international community At the same time,Russia’s system of human rights commissioners remains insufficient in compulsory execution,the division of functions and powers,sources of funding,legal status,and operational efficiency These problems originate from deficient organizational design and external factors,including historical conditions,domestic politics,and international politics In the near future,Russia should strive to improve and develop its system of human rights commissioners under the cautious consideration of both internal and external factors.展开更多
This paper discusses the important role of science and technology commissioners in the high-quality development of hundreds of counties,thousands of towns,and myriads of villages in the context of rural revitalization...This paper discusses the important role of science and technology commissioners in the high-quality development of hundreds of counties,thousands of towns,and myriads of villages in the context of rural revitalization,including building bridges,accelerating the transformation of achievements,promoting the value-added of the whole agricultural industry chain,and promoting the rapid development of rural industrial economy.It also discusses the working achievements of science and technology commissioners,in order to promote further development of rural revitalization in Guangdong Province.展开更多
The Lancang-Mekong River has attracted much attention from researchers, but the cooperation on water issues in this river basin has been limited, even after the establishment of the Mekong River Commission(MRC). Coope...The Lancang-Mekong River has attracted much attention from researchers, but the cooperation on water issues in this river basin has been limited, even after the establishment of the Mekong River Commission(MRC). Cooperation on water resources has been determined as one of the key priority areas in the Lancang-Mekong Cooperation Mechanism, but there are no details of targets. In order to establish the priorities of water cooperation under the mechanism, we adopted nine categories to classify the objectives of 87 water cooperation events based on the ‘Lancang-Mekong Water Cooperative Events Database' from 1995 to 2015. Based on the occurrence of cooperative events, cooperative objectives, cooperative scales, and approaches to cooperation, we conducted statistical, correlation, and text analyses. Our analyses indicated the following results: under the impact of economic conditions inside and outside the river basin, full cooperation appeared more difficult than bilateral and multilateral cooperation. Each of the partners adopted different preferences for cooperation targets. Cooperation with more definite objectives was easier to establish than cooperation with broader and more complex objectives. The potential objectives for water cooperation were navigation, hydropower, joint management, data sharing, flood control and water use. Because hydropower development is controversial, and because water cooperation is avoided by most existing regional cooperation mechanisms due to its complexity, we suggest the following priority areas for water cooperation in the Lancang-Mekong River Basin. 1) Navigation and flood control/drought relief are attractive objectives for all the riparian countries across the whole watershed. 2) Data sharing should be a priority for cooperation in the watershed due to its laying the foundation for the equitable and reasonable utilization of transboundary waters. 3) Hydropower is an objective best implemented mainly through bilateral cooperation, and on tributaries.展开更多
In a SIPV model, when the commission proportion is not certain, but related with bargain price, generally, it is a linear function of the bargain price, this paper gives bidders' equilibrium bidding strategies in the...In a SIPV model, when the commission proportion is not certain, but related with bargain price, generally, it is a linear function of the bargain price, this paper gives bidders' equilibrium bidding strategies in the first-and secondprice auctions. We find that the equilibrium strategies in second-price auction are dominant strategies. For seller or auction house, whether the fixed proportion or the unfixed proportion is good is not only related with constant item and the linear coefficient of the linear function, the size of the fixed commission proportion, but also related with the value of the item auctioned. So, in the practical auctions, the seller and the auction house negotiated with each other to decide the commission rules for their own advantage.展开更多
A 53.667 MHz CW(continuous-wave) heavy ion IH-DTL has been designed for the SSC-LINAC injector of HIRFL-CSR(Heavy Ions Research Facility at Lanzhou-Cooling Storage Ring). It accelerates ions with maximum mass-to-charg...A 53.667 MHz CW(continuous-wave) heavy ion IH-DTL has been designed for the SSC-LINAC injector of HIRFL-CSR(Heavy Ions Research Facility at Lanzhou-Cooling Storage Ring). It accelerates ions with maximum mass-to-charge ratio of 7.0 from 143 to 295 ke V/u. Low-power RF measurement of the IH-DTL1 has been taken to investigate the RF performance and the quality of the electric field distribution on the beam axis.The measured Q_0 value and the shunt impedance are 10,400 and 198 MX/m, respectively. The electric field distributions on and around the beam axis were evaluated and compared with the design value. By a new approach,the dipole field component is also estimated. The beam dynamics simulation using measured field distribution was presented in this paper. Based on the dynamics analysis in both transverse and longitudinal phase space, the field distribution can meet the design requirement. Finally, the RF conditioning and very first beam commissioning on the IH-DTL1 were finished. The beam test results agree well with the simulation results; what's more, the property of the variable output beam energy about the separated functions DTL was verified.展开更多
A 325-MHz continuous-wave(CW) four-vane radiofrequency quadrupole(RFQ) is employed in Injector-I of the China Accelerator-Driven Subcritical System. The radiofrequency tuning and beam commissioning were performed from...A 325-MHz continuous-wave(CW) four-vane radiofrequency quadrupole(RFQ) is employed in Injector-I of the China Accelerator-Driven Subcritical System. The radiofrequency tuning and beam commissioning were performed from January 2014 to January 2017. In a cold test, a stability study showed that the design of the segmented resonantly coupling and dipole stabilizer rods can shift the harmful quadrupole and dipole mode from the fundamental mode to above 2.6 MHz. We also found a simplified tuning method for the field unflatness, involving changing the inserted length of a few plug tuners. For achieving CW-beam commissioning, two full-size RFQs were constructed successively. The commissioning results indicate that the beam transmission rate decreased by approximately 3% as the normalized field unflatness decreased by 1%. A 10-MeV CW proton beam with an average beam current of 2.1 m A was achieved at the target of Injector-I, and the output beam energy of the RFQ was3.18 MeV.展开更多
Motive of the study is to present quantitative and qualitative analysis and comparison of beam data measurement with FF (flattening filter) and FFF (flattening filter free) beam in a Varian TrueBeam<sup>TM</s...Motive of the study is to present quantitative and qualitative analysis and comparison of beam data measurement with FF (flattening filter) and FFF (flattening filter free) beam in a Varian TrueBeam<sup>TM</sup> Medical Linear Accelerator. Critique of beam characterization and evolution of dosimetric properties for 6 MV, 10 MV, 15 MV FF beam and 6 MVFFF, 10 MVFFF FFF beam has been carried out. We performed the comparison of photon beam data for two standard FF photon energy 6 MV, 10 MV verses 6 MVFFF, and 10 MVFFF FFF beam. Determination and comparison of parameter involved PDD (Percentage depth dose), Depth dose profile, Symmetry, Flatness, Quality index, Relative output factor, Penumbra, Transmission factor, DLG (Dosimetric leaf gap), in addition to degree of Un-flatness and off-axis ratio of FFF beam. Outcomes of presenting study had shown that change of various parameters such as Percentage depth dose curves, Shape of the depth dose profile, Transmission, Value of quality index and significant rise in surface dose for FFF in comparison with FF beam. Differences in the output factor at lower and higher field sizes for FFF beam compared to that of FF beam were found. The maximum output factor deviation between 6 MV and 6 MVFFF was found to be 4.55%, whereas in 10 MV and 10 MVFFF was 5.71%. Beam quality TPR20/10 for FFF beam was found to be lesser in magnitude, 5.42% for 6 MVFFF whereas 4.50% for 10 MVFFF compared to 6 MV and 10 MV FF beam respectively. Jaw transmission and interleaf leakage for FFF beam were found to be lesser than FF beam. Also DLG for FFF beam was found to be lesser in magnitude comparable to that of flattened beam. This study is mainly inclined towards evaluation and comparison of the FF and FFF beam. It has been observed that, the outcome of a commissioning beam data generation fully complies with vendor specification and published literature.展开更多
A new loop and fold wave-guide ion cyclotron resonance frequency (ICRF) antenna with a power output of 3 MW, which can operate at a frequency in the range of 30 MHz to 110 MHz, was designed. The design of key compon...A new loop and fold wave-guide ion cyclotron resonance frequency (ICRF) antenna with a power output of 3 MW, which can operate at a frequency in the range of 30 MHz to 110 MHz, was designed. The design of key components of the new ICRF antenna and the charac- ters of the new,.]~rototype ICRF antenna are presented. The thermo-mechanical analysis of both the Faraday shield and the current straps was conducted, and the stresses due to heat loads are studied in detail with different cooling-water velocities considered. In addition, the movability of prototype ICRF antenna under vacuum condition by the driving system was tested. An engineer- ing commissioning was successfully performed on the prototype ICRF antenna using the original transmitter. The results are close to the expected.展开更多
The 10-MeV Accelerator-Driven Subcritical(ADS)system Injector-I test stand at the Institute of High Energy Physics(IHEP)is a testing facility dedicated to demonstrating the feasibility of the spoke-based super-conduct...The 10-MeV Accelerator-Driven Subcritical(ADS)system Injector-I test stand at the Institute of High Energy Physics(IHEP)is a testing facility dedicated to demonstrating the feasibility of the spoke-based super-conducting(SC)linear accelerator(linac)for the ADS project in China.The injector adopted a four-vane copper structure radio frequency quadrupole(RFQ)with an output energy of 3.2 MeV and an SC section accommodating 14 β_(g)=0.12 single spoke cavities,14 SC solenoids,and 14 cold beam position monitors(BPMs).A 10-MeV pulsed beam with a beam current of 10 mA and a 2-mA continuous wave(CW)beam were successfully shooting through.The commissioning results confirmed the feasibility of using a 325-MHz spoke-type cavity for accelerating the proton beam in the low β and medium β sections.This paper describes the results achieved,the difficulties encountered,and the experiences obtained during commissioning.展开更多
ICA National Atlas Commission held a commission meeting and symposium from August 8-12,1990 in Beijing.Among those present at the meeting were Dr.B.Rystedt(Sweden),Chairman of ICA,Dr.E.Ciekirska(Canada),Vice Chairman ...ICA National Atlas Commission held a commission meeting and symposium from August 8-12,1990 in Beijing.Among those present at the meeting were Dr.B.Rystedt(Sweden),Chairman of ICA,Dr.E.Ciekirska(Canada),Vice Chairman of ICA and members from U.S.A.,China,Spain,the Netherlands,Czechoslovakia,India as well as representatives from U.S.S.R.,Czechoslovakia,and Spain.40 Chinese cartographers attended the meeting.The major topics展开更多
This study is to investigate three common potential setup uncertainties during Linac commissioning and annual QA and to evaluate how these uncertainties propagate into the quality of beam profiles and patient dosimetr...This study is to investigate three common potential setup uncertainties during Linac commissioning and annual QA and to evaluate how these uncertainties propagate into the quality of beam profiles and patient dosimetry using gamma analysis. Three uncertainty scenarios were purposely introduced for gantry position tilted from 0˚- 3˚(scenario 1), isocenter position misaligned from 0 - 6 mm (scenario 2) and SAD changed from 99.5 - 103 cm (scenario 3). A 60 × 60 × 60 cm<sup>3</sup> water phantom cube was created to replicate a 3D water tank in VarianEclipse (V.11) treatment planning system (Varian Medical Systems, Palo Alto, CA). For each scenario, beam data profiles (crossline and diagonal) and PDD curves were calculated at different field sizes and depths for three energies: 6 MV, 6 MV-FFF and 10 MV-FFF. Gamma analysis method was used to compare a total of 263 profiles to baseline using a 1%/1mm parameter with 90% gamma passing rate criteria. For scenario 1, a ≥90% gamma passing rate and ≤1% dose difference were seen on both crossline and diagonal profiles, and PDD curves for gantry tilted up to 2˚. For 3˚degree tilt, the gamma passing rate decreased to ≤90% at depth of ≥20 cm for 6MV/6MV-FFF and depth of ≥12 cm for 10MV-FFF. For scenario 2, a ≤90% gamma passing rate and ≥1% dose difference were seen at depths from d<sub>max</sub> to 20 cm for all energies. For depths ≥20 cm, mostly ≥90% gamma passing rate and ≤1% dose difference were seen. For scenario 3, a ≥90% gamma passing rate and ≤1% dose difference were seen on ≤4 mm isocenter misalignments for all energies. In summary, gamma analysis of the beam profiles is a very sensitive test for SAD deviation scenarios and can reveal issues of sub millimeter setup uncertainty. However, it is not as sensitive for isocenter misalignment scenarios. The test is also more sensitive for FFF beams than flattening filter beams.展开更多
The Arbitration Law of the People’s Republic of China will go into effect on September 1, 1995, which has become the focus of world attention. This is an important law promulgated by China for handling economic dispu...The Arbitration Law of the People’s Republic of China will go into effect on September 1, 1995, which has become the focus of world attention. This is an important law promulgated by China for handling economic disputes. All the parties concerned are making intense preparations for the successful enforcement of the Law. As the first nongovernmental organisation engaged in arbitration affairs, the China Council展开更多
基金supported by the Natural Science Foundation of Anhui under Grant(No.1908085QA25)the Research Initiation Foundation of Anhui Polytechnic University(No.2018YQQ001)+3 种基金the PreResearch National Natural Science Foundation of China of Anhui Polytechnic University(No.2019yyzr13)the National Natural Science Foundation of China(Nos.11575237 and 11775258)the National Magnetic Confinement Fusion Science Program(No.2015GB101001)the International Scientific and Technological Cooperation Project of Anhui(No.1704e1002207)
文摘The SC200 proton therapy superconducting cyclotron was developed by ASIPP (Hefei, China) and JINR (Dubna, Russia). A measurement system was designed to assess the average radial component of the magnetic field (Brav) with 15 search coils in the median plane. The winding differences of the search coils affect the measurement accuracy of the Brav. Based on the electromagnetic induction principle, to measure the Brav accurately, this paper focuses on the design and commissioning of the Brav measurement system. The preliminary results confirm that the system design is reasonable and suitable. After testing the search coil at different speeds, the optimal speed was determined as 2.5 mm/s. The relative error was approximately 0.1% under the maximum radial component of the magnetic field Br of 7 G. The measurement precision was up to 1.0×10^-3, which can provide the required measurement tolerance of 3–7 G for Br in the median plane. The commissioning of the Brav measurement system is an important step for Br measurement. It can check and adjust the asymmetry of the superconducting coils (SCs).
基金The Stage Achievement of the Item "Theory and Policy Research on Building A New Socialist Countryside"in Heilongjiang Philosophy and Social Service Research Base (Economic of Agricultural and Rural Area) (05zd001)
文摘Rural finance is an issue concerned with rural people, improving rural financial management is important to close the relations of cadres and masses, maintain rural stability, and promote rural economic development. This article explained the main problems of village financial, the needs of introducing commission and agent system of "village-level accounting" for building a new socialist countryside, and the measures of improving commission and agent system of "village-level accounting".
文摘This paper introduces the process flow, technical parameters and relevant features of Baosteel's No. 8 air separation unit (ASU) with a capacity of 60000m^3/h. It summarizes the commissioning work, which includes the adjustment of the air compressor,the system's naked cooling,the precooling system and the operation adjustment. It also provides detailed analyses on some failures which occurred in the commissioning. Through the modification of the design and the interlocks, the tripping probability of the air compressor was greatly reduced. Through the heating of the system and the control of the water cooler's nitrogen flow,the overproof content of carbon dioxide and fluctuation of oxygen flow were avoided. Nitrogen-block in the argon system was eliminated by the precise control of the argon rectification flow and argon content. All these solutions have been proved to be effective by practice.
文摘The information system for Ningxia sci-tech special commissioners is an application system for realizing information collection,management and sharing in the entrepreneurial process of sci-tech special commissioners. This paper introduces overall design ideas,system functions,key technologies and realization methods of the information system for Ningxia sci-tech special commissioners. Completion of construction and coming into operation of the information system bring new breakthrough for information management and data statistics of sci-tech special commissioners.
文摘The NSLS-II (National Synchrotron Light Source II) is a state-of-the-art 3 GeV third generation light source currently under integrated testing and commissioning at Brook_haven National Laboratory. The vacuum systems are monitored by vacuum gauges and ion pump current. The gate valves are controlled by PLC (programmable logic controllers) using voting scheme. EPICS (Experimental Physics and Industrial Control System) application codes provide the high level monitoring and control through the input-output controllers. This paper will discuss the commissioning status of the various aspects of vacuum control system.
文摘<strong>Purpose:</strong> The purpose of this study is to provide technical information on commissioning the TrueBeam STx 6 MV flattening-filter free (FFF) beam in the RayStation treatment planning system (TPS) for stereotactic radiosurgery (SRS) and stereotactic body radiation therapy (SBRT) treatments. <strong>Methods:</strong> For beam modeling, percent depth dose curves, profiles and output factors for jaw-collimated fields and stereotactic cones as well as X-jaws transmission were measured. For multi-leaf collimator (MLC) modeling, MLC model parameters such as offset, gain, curvature, leaf tip width, tongue and groove and transmission were determined and output factors for MLC-collimated fields were measured. Absolute dose calibration was also performed. For beam model and MLC model validation, the American Association of Physicists in Medicine Task Group-119 plans, clinical SRS and SBRT plans and end-to-end testing were performed. <strong>Results:</strong> Beam characteristics of the 6 MV FFF beam agreed well with those in the literature. Validation results showed that our beam model and MLC model were acceptable for SRS and SBRT treatments. <strong>Conclusions:</strong> The technical information and dosimetric data provided in this study will be a useful reference for other clinics/institutions which will commission the same machine energy in the RayStation TPS.
文摘We present the results of measurements made using the Vero4DRT radiation therapy system, which is not yet widely used, to assist technicians in achieving reliable and safe radiotherapy to the patient. We measured percent depth dose, beam profile, and relative scatter factor under water and air conditions. The Vero4DRT system has a 150 × 150-mm fixed secondary collimator. Its multileaf collimator (MLC) design is a single-focus type, with 30 pairs of 5 mm thick leaves at the isocenter, and produces a maximum field size of 150 × 150 mm. Profile measurements were performed using a 0.016-cm<sup>3</sup> ionization chamber (PTW31016 pinpoint chamber;PTW, Freiburg GmbH Germany). A brass build-up cap was used for measurements obtained in air conditions. We present a useful measurement dataset for users of the Vero4DRT system.
基金This work was supported by the National Natural Science Foundation of China(No.12005239).
文摘The high-energy photon source(HEPS)is the first fourth-generation synchrotron light source facility in China.The HEPS injector consists of a linear accelerator(Linac)and a full energy booster.The booster captures the electron beam from the Linac and increases its energy to the value required for the storage ring.The full-energy beam could be injected to the storage ring directly or after“high-energy accumulation.”On November 17,2023,the key booster parameters successfully reached their corresponding target values.These milestone results were achieved based on numerous contributions,including nearly a decade of physical design,years of equipment development and installation,and months of beam commissioning.As measured at the extraction energy of 6 GeV,the averaged beam current and emittance reached 8.57 mA with 5 bunches and 30.37 nm rad with a single-bunch charge of 5.58 nC,compared with the corresponding target values of 6.6 mA and 35 nm rad,respectively.This paper presents the physical design,equipment development,installation,and commissioning process of the HEPS booster.
文摘In the 1990 s,Russia set up its system of human rights commissioners Although it does not have a long history,the system has been basically established,and it has played an important role in promoting the protection of human rights and social development in Russia,as well as responding to unfriendly comments from the international community At the same time,Russia’s system of human rights commissioners remains insufficient in compulsory execution,the division of functions and powers,sources of funding,legal status,and operational efficiency These problems originate from deficient organizational design and external factors,including historical conditions,domestic politics,and international politics In the near future,Russia should strive to improve and develop its system of human rights commissioners under the cautious consideration of both internal and external factors.
文摘This paper discusses the important role of science and technology commissioners in the high-quality development of hundreds of counties,thousands of towns,and myriads of villages in the context of rural revitalization,including building bridges,accelerating the transformation of achievements,promoting the value-added of the whole agricultural industry chain,and promoting the rapid development of rural industrial economy.It also discusses the working achievements of science and technology commissioners,in order to promote further development of rural revitalization in Guangdong Province.
基金the National Key R&D Program of China(No.2016YFA0601601)Natural Science Foundation of China-International Center for Integrated Mountain Development(NSFC-ICIMOD)Joint Research Program(No.41661144044)
文摘The Lancang-Mekong River has attracted much attention from researchers, but the cooperation on water issues in this river basin has been limited, even after the establishment of the Mekong River Commission(MRC). Cooperation on water resources has been determined as one of the key priority areas in the Lancang-Mekong Cooperation Mechanism, but there are no details of targets. In order to establish the priorities of water cooperation under the mechanism, we adopted nine categories to classify the objectives of 87 water cooperation events based on the ‘Lancang-Mekong Water Cooperative Events Database' from 1995 to 2015. Based on the occurrence of cooperative events, cooperative objectives, cooperative scales, and approaches to cooperation, we conducted statistical, correlation, and text analyses. Our analyses indicated the following results: under the impact of economic conditions inside and outside the river basin, full cooperation appeared more difficult than bilateral and multilateral cooperation. Each of the partners adopted different preferences for cooperation targets. Cooperation with more definite objectives was easier to establish than cooperation with broader and more complex objectives. The potential objectives for water cooperation were navigation, hydropower, joint management, data sharing, flood control and water use. Because hydropower development is controversial, and because water cooperation is avoided by most existing regional cooperation mechanisms due to its complexity, we suggest the following priority areas for water cooperation in the Lancang-Mekong River Basin. 1) Navigation and flood control/drought relief are attractive objectives for all the riparian countries across the whole watershed. 2) Data sharing should be a priority for cooperation in the watershed due to its laying the foundation for the equitable and reasonable utilization of transboundary waters. 3) Hydropower is an objective best implemented mainly through bilateral cooperation, and on tributaries.
基金Supported by the National Natural Science Foun-dation of China (70071012)
文摘In a SIPV model, when the commission proportion is not certain, but related with bargain price, generally, it is a linear function of the bargain price, this paper gives bidders' equilibrium bidding strategies in the first-and secondprice auctions. We find that the equilibrium strategies in second-price auction are dominant strategies. For seller or auction house, whether the fixed proportion or the unfixed proportion is good is not only related with constant item and the linear coefficient of the linear function, the size of the fixed commission proportion, but also related with the value of the item auctioned. So, in the practical auctions, the seller and the auction house negotiated with each other to decide the commission rules for their own advantage.
基金supported by the National Natural Science Foundation of China(Nos.11375243 and 11405237)the Guangdong Innovative and Entrepreneurial Research Team Program(No.2016ZT06G373)
文摘A 53.667 MHz CW(continuous-wave) heavy ion IH-DTL has been designed for the SSC-LINAC injector of HIRFL-CSR(Heavy Ions Research Facility at Lanzhou-Cooling Storage Ring). It accelerates ions with maximum mass-to-charge ratio of 7.0 from 143 to 295 ke V/u. Low-power RF measurement of the IH-DTL1 has been taken to investigate the RF performance and the quality of the electric field distribution on the beam axis.The measured Q_0 value and the shunt impedance are 10,400 and 198 MX/m, respectively. The electric field distributions on and around the beam axis were evaluated and compared with the design value. By a new approach,the dipole field component is also estimated. The beam dynamics simulation using measured field distribution was presented in this paper. Based on the dynamics analysis in both transverse and longitudinal phase space, the field distribution can meet the design requirement. Finally, the RF conditioning and very first beam commissioning on the IH-DTL1 were finished. The beam test results agree well with the simulation results; what's more, the property of the variable output beam energy about the separated functions DTL was verified.
文摘A 325-MHz continuous-wave(CW) four-vane radiofrequency quadrupole(RFQ) is employed in Injector-I of the China Accelerator-Driven Subcritical System. The radiofrequency tuning and beam commissioning were performed from January 2014 to January 2017. In a cold test, a stability study showed that the design of the segmented resonantly coupling and dipole stabilizer rods can shift the harmful quadrupole and dipole mode from the fundamental mode to above 2.6 MHz. We also found a simplified tuning method for the field unflatness, involving changing the inserted length of a few plug tuners. For achieving CW-beam commissioning, two full-size RFQs were constructed successively. The commissioning results indicate that the beam transmission rate decreased by approximately 3% as the normalized field unflatness decreased by 1%. A 10-MeV CW proton beam with an average beam current of 2.1 m A was achieved at the target of Injector-I, and the output beam energy of the RFQ was3.18 MeV.
文摘Motive of the study is to present quantitative and qualitative analysis and comparison of beam data measurement with FF (flattening filter) and FFF (flattening filter free) beam in a Varian TrueBeam<sup>TM</sup> Medical Linear Accelerator. Critique of beam characterization and evolution of dosimetric properties for 6 MV, 10 MV, 15 MV FF beam and 6 MVFFF, 10 MVFFF FFF beam has been carried out. We performed the comparison of photon beam data for two standard FF photon energy 6 MV, 10 MV verses 6 MVFFF, and 10 MVFFF FFF beam. Determination and comparison of parameter involved PDD (Percentage depth dose), Depth dose profile, Symmetry, Flatness, Quality index, Relative output factor, Penumbra, Transmission factor, DLG (Dosimetric leaf gap), in addition to degree of Un-flatness and off-axis ratio of FFF beam. Outcomes of presenting study had shown that change of various parameters such as Percentage depth dose curves, Shape of the depth dose profile, Transmission, Value of quality index and significant rise in surface dose for FFF in comparison with FF beam. Differences in the output factor at lower and higher field sizes for FFF beam compared to that of FF beam were found. The maximum output factor deviation between 6 MV and 6 MVFFF was found to be 4.55%, whereas in 10 MV and 10 MVFFF was 5.71%. Beam quality TPR20/10 for FFF beam was found to be lesser in magnitude, 5.42% for 6 MVFFF whereas 4.50% for 10 MVFFF compared to 6 MV and 10 MV FF beam respectively. Jaw transmission and interleaf leakage for FFF beam were found to be lesser than FF beam. Also DLG for FFF beam was found to be lesser in magnitude comparable to that of flattened beam. This study is mainly inclined towards evaluation and comparison of the FF and FFF beam. It has been observed that, the outcome of a commissioning beam data generation fully complies with vendor specification and published literature.
文摘A new loop and fold wave-guide ion cyclotron resonance frequency (ICRF) antenna with a power output of 3 MW, which can operate at a frequency in the range of 30 MHz to 110 MHz, was designed. The design of key components of the new ICRF antenna and the charac- ters of the new,.]~rototype ICRF antenna are presented. The thermo-mechanical analysis of both the Faraday shield and the current straps was conducted, and the stresses due to heat loads are studied in detail with different cooling-water velocities considered. In addition, the movability of prototype ICRF antenna under vacuum condition by the driving system was tested. An engineer- ing commissioning was successfully performed on the prototype ICRF antenna using the original transmitter. The results are close to the expected.
基金This work was supported by Strategic Priority Research Program of the Chinese Academy of Sciences(No.XDA03030201)the Key Laboratory of Particle Acceleration Physics and Technology Autonomous Foundation of CAS China(No.JSQ2017ZZ01).
文摘The 10-MeV Accelerator-Driven Subcritical(ADS)system Injector-I test stand at the Institute of High Energy Physics(IHEP)is a testing facility dedicated to demonstrating the feasibility of the spoke-based super-conducting(SC)linear accelerator(linac)for the ADS project in China.The injector adopted a four-vane copper structure radio frequency quadrupole(RFQ)with an output energy of 3.2 MeV and an SC section accommodating 14 β_(g)=0.12 single spoke cavities,14 SC solenoids,and 14 cold beam position monitors(BPMs).A 10-MeV pulsed beam with a beam current of 10 mA and a 2-mA continuous wave(CW)beam were successfully shooting through.The commissioning results confirmed the feasibility of using a 325-MHz spoke-type cavity for accelerating the proton beam in the low β and medium β sections.This paper describes the results achieved,the difficulties encountered,and the experiences obtained during commissioning.
文摘ICA National Atlas Commission held a commission meeting and symposium from August 8-12,1990 in Beijing.Among those present at the meeting were Dr.B.Rystedt(Sweden),Chairman of ICA,Dr.E.Ciekirska(Canada),Vice Chairman of ICA and members from U.S.A.,China,Spain,the Netherlands,Czechoslovakia,India as well as representatives from U.S.S.R.,Czechoslovakia,and Spain.40 Chinese cartographers attended the meeting.The major topics
文摘This study is to investigate three common potential setup uncertainties during Linac commissioning and annual QA and to evaluate how these uncertainties propagate into the quality of beam profiles and patient dosimetry using gamma analysis. Three uncertainty scenarios were purposely introduced for gantry position tilted from 0˚- 3˚(scenario 1), isocenter position misaligned from 0 - 6 mm (scenario 2) and SAD changed from 99.5 - 103 cm (scenario 3). A 60 × 60 × 60 cm<sup>3</sup> water phantom cube was created to replicate a 3D water tank in VarianEclipse (V.11) treatment planning system (Varian Medical Systems, Palo Alto, CA). For each scenario, beam data profiles (crossline and diagonal) and PDD curves were calculated at different field sizes and depths for three energies: 6 MV, 6 MV-FFF and 10 MV-FFF. Gamma analysis method was used to compare a total of 263 profiles to baseline using a 1%/1mm parameter with 90% gamma passing rate criteria. For scenario 1, a ≥90% gamma passing rate and ≤1% dose difference were seen on both crossline and diagonal profiles, and PDD curves for gantry tilted up to 2˚. For 3˚degree tilt, the gamma passing rate decreased to ≤90% at depth of ≥20 cm for 6MV/6MV-FFF and depth of ≥12 cm for 10MV-FFF. For scenario 2, a ≤90% gamma passing rate and ≥1% dose difference were seen at depths from d<sub>max</sub> to 20 cm for all energies. For depths ≥20 cm, mostly ≥90% gamma passing rate and ≤1% dose difference were seen. For scenario 3, a ≥90% gamma passing rate and ≤1% dose difference were seen on ≤4 mm isocenter misalignments for all energies. In summary, gamma analysis of the beam profiles is a very sensitive test for SAD deviation scenarios and can reveal issues of sub millimeter setup uncertainty. However, it is not as sensitive for isocenter misalignment scenarios. The test is also more sensitive for FFF beams than flattening filter beams.
文摘The Arbitration Law of the People’s Republic of China will go into effect on September 1, 1995, which has become the focus of world attention. This is an important law promulgated by China for handling economic disputes. All the parties concerned are making intense preparations for the successful enforcement of the Law. As the first nongovernmental organisation engaged in arbitration affairs, the China Council