期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
The Shandong Shidao Bay 200 MW_e High-Temperature Gas-Cooled Reactor Pebble-Bed Module(HTR-PM) Demonstration Power Plant: An Engineering and Technological Innovation 被引量:19
1
作者 张作义 董玉杰 +10 位作者 李富 张征明 王海涛 黄晓津 李红 刘兵 吴莘馨 王宏 刁兴中 张海泉 王金华 《Engineering》 SCIE EI 2016年第1期119-123,共5页
In 2005, the US passed the Energy Policy Act of 2005 mandating the construction and operation of a high-temperature gas reactor (HTGR) by 2021. This law was passed after a multiyear study by national experts on what... In 2005, the US passed the Energy Policy Act of 2005 mandating the construction and operation of a high-temperature gas reactor (HTGR) by 2021. This law was passed after a multiyear study by national experts on what future nuclear technologies should be developed. As a result of the Act, the US Congress chose to develop the so-called Next-Generation Nuclear Plant, which was to be an HTGR designed to produce process heat for hydrogen production. Despite high hopes and expectations, the current status is that high temperature reactors have been relegated to completing research programs on advanced fuels, graphite and materials with no plans to build a demonstration plant as required by the US Con- gress in 2005. There are many reasons behind this diminution of HTGR development, including but not limited to insufficient government funding requirements for research, unrealistically high temperature requirements for the reactor, the delay in the need for a "hydrogen" economy, competition from light water small modular light water reactors, little utility interest in new technologies, very low natural gas prices in the US, and a challenging licensing process in the US for non-water reactors. 展开更多
关键词 High temperature gas reactor Next-Generation Nuclear Plant (NGNP) LICENSING Nuclear Regulatory commissionenergy Policy Act of 2005Research status
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部