Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River Syst...Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice.展开更多
针对目前基于二维施工图的高桩码头施工现场控制存在工程量计算耗时长、数据处理实时性差等问题,进行了基于5D-BIM(5 Dimensions-Building Information Modeling)的高桩码头工程施工过程控制研究,通过5D-BIM系统高效搜集整理大量数据的...针对目前基于二维施工图的高桩码头施工现场控制存在工程量计算耗时长、数据处理实时性差等问题,进行了基于5D-BIM(5 Dimensions-Building Information Modeling)的高桩码头工程施工过程控制研究,通过5D-BIM系统高效搜集整理大量数据的能力、强大的交互功能,实现了快速、准确的工程成本测算以及直观的实时进度四维动态显示,为动态、实时、高效地控制高桩码头施工进度-成本提供了有效的手段。展开更多
文摘Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice.
文摘针对目前基于二维施工图的高桩码头施工现场控制存在工程量计算耗时长、数据处理实时性差等问题,进行了基于5D-BIM(5 Dimensions-Building Information Modeling)的高桩码头工程施工过程控制研究,通过5D-BIM系统高效搜集整理大量数据的能力、强大的交互功能,实现了快速、准确的工程成本测算以及直观的实时进度四维动态显示,为动态、实时、高效地控制高桩码头施工进度-成本提供了有效的手段。