TBM Construction Process Simulation and Performance Optimization
1
作者 刘东海 周云晴 焦凯 《Transactions of Tianjin University》 EI CAS 2010年第3期194-202,共9页
Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different... Long tunnel excavation with tunnel boring ily affected by uncertainties and needs to be adjusted machine (TBM) is a complex and stochastic process. It is eas- according to specific geological conditions in different tunnel sections, which makes the construction scheduling and management difficult. Based on the rock mass classification, this paper estimates the penetration rate. Using the rate, a cyclic network simulation (CYCLONE) model of TBM boring system is established, and the advance rates under different geological conditions are determined. Then, the impact of different cutter head thrust, which is chosen in reasonable range according to previous experiences, on pro- ject schedule is analyzed. Moreover, the simulation model of mucking system is built to determine the number of muck trains and rail intersections reasonably, regarding the efficiency of muck loading and material transporting. Based on the interaction and interrelation between TBM boring system and mucking system, the combined CY- CLONE model for the entire tunneling process is established. Then reasonable construction schedule, the utilization rate of working resources, and the probability of project completion are obtained through the model programming. At last, a project application shows the feasibility of the presented method. 展开更多
关键词 tunnel boring machine (TBM) construction simulation SCHEDULE efficiency analysis OPTIMIZATION
下载PDF
Simulation analysis of construction process of high rock slope's stabilization 被引量:2
2
作者 朱占元 凌贤长 +1 位作者 王宣青 邹祖银 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2008年第2期188-193,共6页
A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the u... A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and displacement vector graphs at different construction steps were obtained, and the behavior of the slope during stabilization construction process was analyzed quantitatively. Based on the analysis of safety factors of three different schemes of stabilization and two different construction schemes, the assessment of stability and bracing design of the construction process were performed. The results show that the original reinforcement design is improper; the stability of the rock slope is controlled by a developed structural plane, the stability factor after excavation is less than 1, and the free surface should be braced in time; for stability, the construction sequence should adopt that bracing follows excavation step by step up to down; the local slide occurred during the construction process agrees with the dangerous slide determined by the numerical analysis, which proves the validity and rationality of the adopted method. 展开更多
关键词 high rock slope STABILITY STABILIZATION construction process simulation elasto-plastic FEM method
下载PDF
Probabilistic prediction of expected ground condition and construction time and costs in road tunnels 被引量:4
3
作者 A.Mahmoodzadeh S.Zare 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2016年第5期734-745,共12页
Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic est... Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC) simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding. 展开更多
关键词 Markov process Geological condition Monte-Carlo (MC) simulation construction time and costs Hamro tunnel
下载PDF