With high rock slope in shiplock area, thin reinforced concrete lining walls are constructed for the shiplock system. The construction technology involves much complicated structures in formwork, frequent interference...With high rock slope in shiplock area, thin reinforced concrete lining walls are constructed for the shiplock system. The construction technology involves much complicated structures in formwork, frequent interference due to crossover working procedures, tight time schedule, high quality of reinforced concrete and showcase appearance requirements, hidden troubles affecting construction safety. With above-mentioned factors in consideration, a single-side-separated sliding formwork technology advanced from past sliding formwork experiences has been developed and applied successfully. This new technology is beneficial in quick and safe operation, capable to assure best quality and appearance of shiplock concrete works, and has filled up the gap in terms of construction sliding formwork in our country.展开更多
In this paper, the suitability and construction technology of self-insulation walls were studied under the specific climatic conditions and regional resources of Hanzhong and Ankang in the hot summer and cold winter z...In this paper, the suitability and construction technology of self-insulation walls were studied under the specific climatic conditions and regional resources of Hanzhong and Ankang in the hot summer and cold winter zone of Southern Shaanxi. Through the calculation of heat transfer coefficient and thermal inertia index, combined with the specifications of the shale hollow brick and aerated concrete block of Hanzhong and Ankang in southern Shaanxi, the thermal performance and suitable thickness of the external wall using self-insulation materials that meet the Design Standard for Energy Efficiency of Residential Buildings(DBJ61-65-2011) in Shaanxi Province were obtained. The results showed that the self-insulation wall had technical suitability in the hot summer and cold winter zone. The research results provide not only a theoretical basis for the external wall insulation design of urban residential buildings in the hot summer and cold winter zone of southern Shaanxi, but also a reference for designers to carry out energy-saving design of external walls of residential buildings in other similar climate zones.展开更多
Rammed earth wall technique is one of the local widespread traditional construction methods, and it has superior physical property and ecological protection characteristic. When contemporary raw-soil building is repla...Rammed earth wall technique is one of the local widespread traditional construction methods, and it has superior physical property and ecological protection characteristic. When contemporary raw-soil building is replaced by industry building, the hometown building culture is perishing gradually. In order to inherit and develop the Hanzhong local building, rammed earth wall in Taiyangling and Cangshe hometown is investigated, and the characteristics and construction techniques of the local rammed earth wall are concluded. According to the construction problems, the improvement suggestions are put forward, which establishes the foundation to investigate rammed earth wall further, and guide Rural House construction.展开更多
The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the...The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future.展开更多
Wooden walls of traditional stilted buildings of Miao Nationality show outstanding regional characteristics. Taking the well-preserved traditional stilted buildings in Xijiang Miao Village for example, this paper focu...Wooden walls of traditional stilted buildings of Miao Nationality show outstanding regional characteristics. Taking the well-preserved traditional stilted buildings in Xijiang Miao Village for example, this paper focused on the construction units of the wooden wall, and the hierarchy of wooden wall construction, concluded spatial forms of the wooden wall, in order to explore the indigenous construction culture in the wooden wall system, protect and inherit the culture; seek for the ways of expressing national and regional characteristics in the modern architectural designs of relevant cultural regions.展开更多
The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of ...The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of water conservancy projects.This article studies the causes of water infiltration in water conservancy projects and introduces related antiseepage technologies,hoping to be a reference for the implementation of anti-seepage projects.Through research,it is found that the factors that cause water infiltration in water conservancy projects include water conservancy project structural changes,environmental factors and construction factors.Relevant personnel can use concrete anti-seepage wall construction technology and high-pressure jet grouting technology to do the relevant anti-seepage work of water conservancy projects.展开更多
The development of the construction sector is rapidly growing,which induce competition at global level.In order to achieve the current economic development,more high-rise buildings construction projects were commenced...The development of the construction sector is rapidly growing,which induce competition at global level.In order to achieve the current economic development,more high-rise buildings construction projects were commenced without considering importance of the land to human and other living organism.On the other hand,the quality and safety aspect of the engineering technology used must be analyzed carefully and to be the primary aim for engineers to reduce any risk of harm in future.Many of the high-rise buildings in China consist of a frame or skeleton of reinforced concrete wall which need to be strengthened with shear walls to improve the stability and safety of the structures.According to practical work experience and relevant theoretical knowledge,the researcher introduced the reinforcement construction technology of frame-shear wall for high-rise buildings in depth from aspects like the arrangement of steel bar,construction preparation,steel bar anchorage,precautions to follow for the related work in future.展开更多
In the process of continuous development of construction enterprises, new requirements have been put forward for construction projects. By strengthening the construction quality control of reinforced concrete shear wa...In the process of continuous development of construction enterprises, new requirements have been put forward for construction projects. By strengthening the construction quality control of reinforced concrete shear wall structure, the construction level of reinforced concrete can be continuously improved, the construction quality can be guaranteed, and the construction project can be successfully completed, which is worthy of extensive application and promotion in construction enterprises, thus providing a broader development space for construction enterprises.展开更多
Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construct...Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construction management of industrial and civil construction projects for the longterm development of construction industry in China.In terms of reality,one of the common problems in the current industrial and civil construction is wall cracks,which will have an important impact on the appearance of the building and the overall construction quality.Therefore,it is necessary to analyze the reasons and put forward corresponding measures on it.That is how we can continuously improve the construction quality in civil and industrial construction projects,thereby achieving the enhancement of building safety and stability.展开更多
Taking the hyperbolic glass curtain wall project of the Wuhan Jinyinhu Commercial Plaza as an example,the characteristics of different curved glass forming technologies were analyzed in this paper.Combined with the ac...Taking the hyperbolic glass curtain wall project of the Wuhan Jinyinhu Commercial Plaza as an example,the characteristics of different curved glass forming technologies were analyzed in this paper.Combined with the actual engineering situation,the curved steel process is selected to produce the hyperbolic glass curtain wall,and the application of BIM technology in the quality control of hyperbolic glass curtain wall in the production process was analyzed,and the effects of heating condition,bending time,cooling condition,and bending tempering error in the manufacturing accuracy of the curved glass curtain wall were studied,in hope that this project can provide practical reference for similar curtain wall design construction in the future.展开更多
The architectural?complexes?of Hasan Basha Tahir?were suffering from many damages and deformation in different elements as load bearing walls, arches and wooden ceiling. Ground water, salt weathering, air pollution, b...The architectural?complexes?of Hasan Basha Tahir?were suffering from many damages and deformation in different elements as load bearing walls, arches and wooden ceiling. Ground water, salt weathering, air pollution, biological colonization and environmental aspects were the main degradation factors which caused a lot of damage and deterioration phenomena in the complexes. Horizontal and vertical cracks, salts, loss of decorations, and featured dark of the stone surface were noticed at the complexes elements. In addition, the celling of the complex was in a very bad condition;?it had lost a lot of decoration elements, cracking, soot deposition, insects’ holes, and fungi growth. This research will discuss the various deterioration phenomena that?have?effect on the main building materials and cause the damages and discuss the general scientific methodology of the architectural and structural conservation project which was?carried out.展开更多
The Jiarong Tibetan traditional residence is a characteristic regional architecture, located in a high-intensity, high-altitude and cold area, with geographic identification, and is a typical representative of this et...The Jiarong Tibetan traditional residence is a characteristic regional architecture, located in a high-intensity, high-altitude and cold area, with geographic identification, and is a typical representative of this ethnic group. It has also become an important tourist destination and has important research value. The research used the methods of field survey surveying and mapping to conduct field survey and surveying on 20 buildings in Xisuo Village, a traditional village in the Jiarong Tibetan area. Measure building plans, elevations, and building sections, and collect measurement data for statistical analysis. The results show that the average total height of the building is 10.08 m, the average total building span is 12.44 m, the average total depth is 10.87 m, and the squareness is 0.87. The square shape of the building is more in line with the seismic requirements of high-intensity areas and the local terrain environment<span style="font-family:Verdana;">.</span><span style="font-family:Verdana;"> The maximum window-wall ratio in the building is 0.18 south for the second floor, and 0.025 west for the first floor. Smaller window-to-</span><span style="font-family:Verdana;"> </span><span style="font-family:Verdana;">wall ratios have better adaptability to high-altitude cold areas</span><span style="font-family:Verdana;">.</span><span style="font-family:Verdana;"> The height of the building beam section is generally from 0.17 m to 0.32 m, and the average Beam span-depth ratio is 0.10. The building space construction has a good match with the properties of wood materials. These conclusions quantitatively analyze the characteristics of stone-built houses in high-intensity, high-altitude and cold areas, supplement the research on ethnic regional architecture, and provide materials and references for the design, repair and update of related buildings.</span>展开更多
文摘With high rock slope in shiplock area, thin reinforced concrete lining walls are constructed for the shiplock system. The construction technology involves much complicated structures in formwork, frequent interference due to crossover working procedures, tight time schedule, high quality of reinforced concrete and showcase appearance requirements, hidden troubles affecting construction safety. With above-mentioned factors in consideration, a single-side-separated sliding formwork technology advanced from past sliding formwork experiences has been developed and applied successfully. This new technology is beneficial in quick and safe operation, capable to assure best quality and appearance of shiplock concrete works, and has filled up the gap in terms of construction sliding formwork in our country.
文摘In this paper, the suitability and construction technology of self-insulation walls were studied under the specific climatic conditions and regional resources of Hanzhong and Ankang in the hot summer and cold winter zone of Southern Shaanxi. Through the calculation of heat transfer coefficient and thermal inertia index, combined with the specifications of the shale hollow brick and aerated concrete block of Hanzhong and Ankang in southern Shaanxi, the thermal performance and suitable thickness of the external wall using self-insulation materials that meet the Design Standard for Energy Efficiency of Residential Buildings(DBJ61-65-2011) in Shaanxi Province were obtained. The results showed that the self-insulation wall had technical suitability in the hot summer and cold winter zone. The research results provide not only a theoretical basis for the external wall insulation design of urban residential buildings in the hot summer and cold winter zone of southern Shaanxi, but also a reference for designers to carry out energy-saving design of external walls of residential buildings in other similar climate zones.
基金Supported by Fund for Scientific Research of Shaanxi University of Technology(SLG0811)~~
文摘Rammed earth wall technique is one of the local widespread traditional construction methods, and it has superior physical property and ecological protection characteristic. When contemporary raw-soil building is replaced by industry building, the hometown building culture is perishing gradually. In order to inherit and develop the Hanzhong local building, rammed earth wall in Taiyangling and Cangshe hometown is investigated, and the characteristics and construction techniques of the local rammed earth wall are concluded. According to the construction problems, the improvement suggestions are put forward, which establishes the foundation to investigate rammed earth wall further, and guide Rural House construction.
文摘The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future.
基金Sponsored by Guizhou Provincial Foundation of Science and Technology(QKHLH20147393)
文摘Wooden walls of traditional stilted buildings of Miao Nationality show outstanding regional characteristics. Taking the well-preserved traditional stilted buildings in Xijiang Miao Village for example, this paper focused on the construction units of the wooden wall, and the hierarchy of wooden wall construction, concluded spatial forms of the wooden wall, in order to explore the indigenous construction culture in the wooden wall system, protect and inherit the culture; seek for the ways of expressing national and regional characteristics in the modern architectural designs of relevant cultural regions.
文摘The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of water conservancy projects.This article studies the causes of water infiltration in water conservancy projects and introduces related antiseepage technologies,hoping to be a reference for the implementation of anti-seepage projects.Through research,it is found that the factors that cause water infiltration in water conservancy projects include water conservancy project structural changes,environmental factors and construction factors.Relevant personnel can use concrete anti-seepage wall construction technology and high-pressure jet grouting technology to do the relevant anti-seepage work of water conservancy projects.
文摘The development of the construction sector is rapidly growing,which induce competition at global level.In order to achieve the current economic development,more high-rise buildings construction projects were commenced without considering importance of the land to human and other living organism.On the other hand,the quality and safety aspect of the engineering technology used must be analyzed carefully and to be the primary aim for engineers to reduce any risk of harm in future.Many of the high-rise buildings in China consist of a frame or skeleton of reinforced concrete wall which need to be strengthened with shear walls to improve the stability and safety of the structures.According to practical work experience and relevant theoretical knowledge,the researcher introduced the reinforcement construction technology of frame-shear wall for high-rise buildings in depth from aspects like the arrangement of steel bar,construction preparation,steel bar anchorage,precautions to follow for the related work in future.
文摘In the process of continuous development of construction enterprises, new requirements have been put forward for construction projects. By strengthening the construction quality control of reinforced concrete shear wall structure, the construction level of reinforced concrete can be continuously improved, the construction quality can be guaranteed, and the construction project can be successfully completed, which is worthy of extensive application and promotion in construction enterprises, thus providing a broader development space for construction enterprises.
文摘Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construction management of industrial and civil construction projects for the longterm development of construction industry in China.In terms of reality,one of the common problems in the current industrial and civil construction is wall cracks,which will have an important impact on the appearance of the building and the overall construction quality.Therefore,it is necessary to analyze the reasons and put forward corresponding measures on it.That is how we can continuously improve the construction quality in civil and industrial construction projects,thereby achieving the enhancement of building safety and stability.
基金The Hubei Provincial Building Technology Project in 2021 (Project Number: 43)。
文摘Taking the hyperbolic glass curtain wall project of the Wuhan Jinyinhu Commercial Plaza as an example,the characteristics of different curved glass forming technologies were analyzed in this paper.Combined with the actual engineering situation,the curved steel process is selected to produce the hyperbolic glass curtain wall,and the application of BIM technology in the quality control of hyperbolic glass curtain wall in the production process was analyzed,and the effects of heating condition,bending time,cooling condition,and bending tempering error in the manufacturing accuracy of the curved glass curtain wall were studied,in hope that this project can provide practical reference for similar curtain wall design construction in the future.
文摘The architectural?complexes?of Hasan Basha Tahir?were suffering from many damages and deformation in different elements as load bearing walls, arches and wooden ceiling. Ground water, salt weathering, air pollution, biological colonization and environmental aspects were the main degradation factors which caused a lot of damage and deterioration phenomena in the complexes. Horizontal and vertical cracks, salts, loss of decorations, and featured dark of the stone surface were noticed at the complexes elements. In addition, the celling of the complex was in a very bad condition;?it had lost a lot of decoration elements, cracking, soot deposition, insects’ holes, and fungi growth. This research will discuss the various deterioration phenomena that?have?effect on the main building materials and cause the damages and discuss the general scientific methodology of the architectural and structural conservation project which was?carried out.
文摘The Jiarong Tibetan traditional residence is a characteristic regional architecture, located in a high-intensity, high-altitude and cold area, with geographic identification, and is a typical representative of this ethnic group. It has also become an important tourist destination and has important research value. The research used the methods of field survey surveying and mapping to conduct field survey and surveying on 20 buildings in Xisuo Village, a traditional village in the Jiarong Tibetan area. Measure building plans, elevations, and building sections, and collect measurement data for statistical analysis. The results show that the average total height of the building is 10.08 m, the average total building span is 12.44 m, the average total depth is 10.87 m, and the squareness is 0.87. The square shape of the building is more in line with the seismic requirements of high-intensity areas and the local terrain environment<span style="font-family:Verdana;">.</span><span style="font-family:Verdana;"> The maximum window-wall ratio in the building is 0.18 south for the second floor, and 0.025 west for the first floor. Smaller window-to-</span><span style="font-family:Verdana;"> </span><span style="font-family:Verdana;">wall ratios have better adaptability to high-altitude cold areas</span><span style="font-family:Verdana;">.</span><span style="font-family:Verdana;"> The height of the building beam section is generally from 0.17 m to 0.32 m, and the average Beam span-depth ratio is 0.10. The building space construction has a good match with the properties of wood materials. These conclusions quantitatively analyze the characteristics of stone-built houses in high-intensity, high-altitude and cold areas, supplement the research on ethnic regional architecture, and provide materials and references for the design, repair and update of related buildings.</span>