Adopting high penetration levels of electric vehicles(EVs)necessitates the implementation of appropriate charging management systems to mitigate their negative impacts on pow-er distribution networks.Currently,most of...Adopting high penetration levels of electric vehicles(EVs)necessitates the implementation of appropriate charging management systems to mitigate their negative impacts on pow-er distribution networks.Currently,most of the proposed Ev charging management techniques rely on the availability of high-bandwidth communication links.Such techniques are far from realization due to①the lack of utility-grade communica-tion systems in many cases such as secondary(low-voltage)pow-er distribution systems to which EVs are connected,rural ar-eas,remote communities,and islands,and②existing fears and concerns about the data privacy of EV users and cyber-physical security.For these cases,appropriate local control schemes are needed to ensure the adequate management of EV charging without violating the grid operation requirements.Accordingly,this paper introduces a new communication-less management strategy for EV charging in droop-controlled islanded mi-crogrids.The proposed strategy is autonomous,as it is based on the measurement of system frequency and local bus voltages.The proposed strategy implements a social charging fairness policy during periods when the microgrid distributed genera-tors(DGs)are in short supply by allocating more system capaci-ty to the EVs with less charging in the past.Furthermore,a novel communication-less EV load shedding scheme is incorpo-rated into the management strategy to provide relief to the mi-crogrid during events of severe undervoltage or underfrequency occurrences due to factors such as high loading or DG outages.Numerical simulations demonstrate the superiority of the pro-posed strategy over the state-of-the-art controllers in modulat-ing the EV charging demand to counteract microgrid instability.展开更多
Objective:To explore the role of specialized group management in the quality control of perioperative nursing.Methods:45 surgical nurses from our hospital were selected as the research subjects.Traditional operating r...Objective:To explore the role of specialized group management in the quality control of perioperative nursing.Methods:45 surgical nurses from our hospital were selected as the research subjects.Traditional operating room management was adopted from July 2019 to June 2020,and specialized group management was adopted from July 2020 to June 2021.The surgeon’s satisfaction,surgical nurses’core professional competence,and surgical patients’satisfaction were obtained through surveys and the results were analyzed.Results:Surgeon satisfaction before the implementation of specialized group management was significantly lower than after its implementation(P<0.05).Besides,surgical nurses’core professional competency scores before the implementation of specialized group management were significantly lower than after its implementation(P<0.05).Lastly,surgical patients’satisfaction before the implementation of specialized group management was significantly lower than after its implementation(P<0.05).Conclusion:Specialized group management helps to improve the quality of perioperative care and should be applied in clinical practice.展开更多
Objective:To evaluate the application value of a refined quality control management model for a sterilization supply center.Methods:A retrospective analysis was conducted on the work situation of the sterilization sup...Objective:To evaluate the application value of a refined quality control management model for a sterilization supply center.Methods:A retrospective analysis was conducted on the work situation of the sterilization supply center from January 2021 to January 2023.The work situation before January 31,2022,was classified as the control group;a routine quality control management model was implemented,and the work situation after January 31,2022,was classified as the observation group.The quality of medical device management and department satisfaction between the two groups were compared.Results:The timely recovery and supply rate,classification and cleaning pass rate,disinfection pass rate,packaging pass rate,sterilization pass rate,and department satisfaction score in the observation group were all higher than those of the control group(P<0.05).Conclusion:Implementing a refined quality control management model in the sterilization supply center can improve the quality management level of medical devices and department satisfaction and is worthy of promotion.展开更多
Objective: To explore the effect of evidence-based quality control circle (QCC) in improving the implementation rate of airway management measures in adult critically ill patients. Methods: Based on the Joanna Briggs ...Objective: To explore the effect of evidence-based quality control circle (QCC) in improving the implementation rate of airway management measures in adult critically ill patients. Methods: Based on the Joanna Briggs Institute (JBI) evidence-based health care model, the best evidence of airway management in adult critically ill patients was obtained and applied to the clinic. Results: The total implementation rate of airway management measures in adult critically ill patients increased from 23.62% before the implementation of quality control circle to 88.82%, and the pulmonary infection rate in critically ill patients decreased from 42.31% to 21.74%, with statistical significance between the two groups (P 0.05). Conclusion: Evidence-based quality control circle activities can standardize the practice standards of airway management in critically ill patients, reduce the occurrence of patients’ airway related complications, and improve clinical outcomes.展开更多
Objective:To analyze the application effect of feedforward control in outpatient blood specimen management.Methods:1,200 patients who had their venous blood collected in outpatient phlebotomy room of our hospital'...Objective:To analyze the application effect of feedforward control in outpatient blood specimen management.Methods:1,200 patients who had their venous blood collected in outpatient phlebotomy room of our hospital's outpatient clinic from January 2021 to April 2021 were selected as study subjects and divided into 600 cases in the control group and 600 cases in the observation group.The two groups of patients were compared in terms of their satisfaction with the staff,the efficiency of the nurses and the quality of nursing care,turnaround time before specimen analysis,the rejection rate of the blood specimens,and the time of result reporting.Results:After the implementation of feedforward control,patients'satisfaction with staff,nurses work efficiency and quality of care,turnaround time before specimen analysis,specimen rejection rate,and result reporting time in the observation group were significantly higher than those in the control group(P<0.05).Conclusion:The application of feedforward control in the management of outpatient blood specimens has significant effect,which effectively improves patients'satisfaction,enhances the efficiency of nurses and the quality of nursing care,shortens the turnaround time of specimens before analysis and the reporting time of results,and reduces the rejection rate of specimens.展开更多
As an important pillar of national economic development,state-owned enterprises,their operational efficiency,and risk management ability are directly related to the stability and security of the national economy.As an...As an important pillar of national economic development,state-owned enterprises,their operational efficiency,and risk management ability are directly related to the stability and security of the national economy.As an important part of enterprise management,internal control management plays an irreplaceable role.Especially in the current domestic and international economic situation is complex and changeable,market competition is increasingly fierce environment,to strengthen the internal control management of state-owned enterprises and risk prevention measures is particularly important.This paper starts with the importance of internal control management and risk prevention for state-owned enterprises,and analyzes the problems and strategies in the internal control management and risk prevention of state-owned enterprises,in order to build a more comprehensive and efficient risk management system for state-owned enterprises to adapt to the ever-changing market environment and realize sustainable development.展开更多
This paper outlines the internal control management of hospital accounting and finance,introducing its concept,importance,and objectives.It then analyzes the problems existing in the internal control management of hos...This paper outlines the internal control management of hospital accounting and finance,introducing its concept,importance,and objectives.It then analyzes the problems existing in the internal control management of hospital accounting and finance,including an unsound management system,insufficient system implementation,inadequate risk assessment and control capabilities,poor information communication,weak internal supervision,and uneven personnel quality.The reasons for these problems are also analyzed,including outdated management concepts,irrational organizational structures,imperfect training and incentive mechanisms,low levels of information technology,and changes in the external environment.This paper proposes improvement measures for the internal control management of hospital accounting,including enhancing the management system,strengthening system implementation,improving risk assessment and control capabilities,enhancing the information communication mechanism,strengthening internal supervision,improving personnel quality,advancing information technology,and adapting to changes in the external environment.展开更多
The all-wheel drive(AWD)hybrid system is a research focus on high-performance new energy vehicles that can meet the demands of dynamic performance and passing ability.Simultaneous optimization of the power and economy...The all-wheel drive(AWD)hybrid system is a research focus on high-performance new energy vehicles that can meet the demands of dynamic performance and passing ability.Simultaneous optimization of the power and economy of hybrid vehicles becomes an issue.A unique multi-mode coupling(MMC)AWD hybrid system is presented to realize the distributed and centralized driving of the front and rear axles to achieve vectored distribution and full utilization of the system power between the axles of vehicles.Based on the parameters of the benchmarking model of a hybrid vehicle,the best model-predictive control-based energy management strategy is proposed.First,the drive system model was built after the analysis of the MMC-AWD’s drive modes.Next,three fundamental strategies were established to address power distribution adjustment and battery SOC maintenance when the SOC changed,which was followed by the design of a road driving force observer.Then,the energy consumption rate in the average time domain was processed before designing the minimum fuel consumption controller based on the equivalent fuel consumption coefficient.Finally,the advantage of the MMC-AWD was confirmed by comparison with the dynamic performance and economy of the BYD Song PLUS DMI-AWD.The findings indicate that,in comparison to the comparative hybrid system at road adhesion coefficients of 0.8 and 0.6,the MMC-AWD’s capacity to accelerate increases by 5.26%and 7.92%,respectively.When the road adhesion coefficient is 0.8,0.6,and 0.4,the maximum climbing ability increases by 14.22%,12.88%,and 4.55%,respectively.As a result,the dynamic performance is greatly enhanced,and the fuel savings rate per 100 km of mileage reaches 12.06%,which is also very economical.The proposed control strategies for the new hybrid AWD vehicle can optimize the power and economy simultaneously.展开更多
The global diabetes surge poses a critical public health challenge,emphasizing the need for effective glycemic control.However,rapid correction of chronic hyperglycemia can unexpectedly trigger microvascular complicat...The global diabetes surge poses a critical public health challenge,emphasizing the need for effective glycemic control.However,rapid correction of chronic hyperglycemia can unexpectedly trigger microvascular complications,necessitating a reevaluation of the speed and intensity of glycemic correction.Theories suggest swift blood sugar reductions may cause inflammation,oxidative stress,and neurovascular changes,resulting in complications.Healthcare providers should cautiously approach aggressive glycemic control,especially in long-standing,poorly controlled diabetes.Preventing and managing these complications requires a personalized,comprehensive approach with education,monitoring,and interdisciplinary care.Diabetes management must balance short and longterm goals,prioritizing overall well-being.This editorial underscores the need for a personalized,nuanced approach,focusing on equilibrium between glycemic control and avoiding overcorrection.展开更多
BACKGROUND Low back pain(LBP)is a prevalent issue that orthopedic surgeons frequently address in the outpatient setting.LBP can arise from various causes,with stiffness in the paraspinal muscles being a notable contri...BACKGROUND Low back pain(LBP)is a prevalent issue that orthopedic surgeons frequently address in the outpatient setting.LBP can arise from various causes,with stiffness in the paraspinal muscles being a notable contributor.The administration of Botulinum toxin type A(BoNT-A)has been found to alleviate back pain by relaxing these stiff muscles.While BoNT-A is approved for use in numerous conditions,a limited number of randomized clinical trials(RCTs)validate its efficacy specifically for treating LBP.AIM To study the safety and the efficacy of BoNT-A in minimizing pain and improving functional outcomes in patients of chronic LBP(CLBP).METHODS In this RCT,adults aged 18-60 years with mechanical LBP persisting for at least six months were enrolled.Participants were allocated to either the Drug group,receiving 200 Ipsen Units(2 mL)of BoNT-A,or the Control group,which received a 2 mL placebo.Over a 2-month follow-up period,both groups were assessed using the Visual Analog Scale(VAS)for pain intensity and the Oswestry Disability Index(ODI)for disability at the start and conclusion of the study.A decrease in pain by 50%was deemed clinically significant.RESULTS The study followed 40 patients for two months,with 20 in each group.A clinically significant reduction in pain was observed in 36 participants.There was a statistically significant decrease in both VAS and ODI scores in the groups at the end of two months.Nonetheless,when comparing the mean score changes,only the reduction in ODI scores(15 in the placebo group vs 16.5 in the drug group,clinically insignificant)was statistically significant(P=0.012),whereas the change in mean VAS scores was not significant(P=0.45).CONCLUSION The study concludes that BoNT-A does not offer a short-term advantage over placebo in reducing pain or improving LBP scores in CLBP patients.展开更多
Focusing on the two themes of"internal control"and"risk management",this paper makes an in-depth analysis of the current situation of risk management and internal control of Moutai Group.It analyze...Focusing on the two themes of"internal control"and"risk management",this paper makes an in-depth analysis of the current situation of risk management and internal control of Moutai Group.It analyzes the current situation of risk management and internal control of Moutai Group.It is found that the risk management of Moutai Group is not perfect,the information exchange is not smooth,and the internal control assessment is not perfect.Finally,it puts forward some corresponding countermeasures,including establishing an effective information communication mechanism,perfecting the risk assessment system,and strengthening the construction of the professional talent team.展开更多
Hospitals are crucial healthcare facilities where patients seek treatment,and effective budget management within hospitals significantly impacts their operational efficiency and financial performance.In the age of inf...Hospitals are crucial healthcare facilities where patients seek treatment,and effective budget management within hospitals significantly impacts their operational efficiency and financial performance.In the age of information technology and advanced healthcare solutions,the emergence of smart hospitals represents a new trend in the medical industry’s evolution.Leveraging modern information technology can enhance the development of hospital IT systems and drive budget management toward greater intelligence.This paper begins by analyzing the influence of smart hospitals on hospital budget control.It then examines the current state of budget management control within smart hospitals.Finally,it proposes several strategies for budget management control in smart hospitals,aiming to provide guidance for relevant stakeholders.展开更多
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ...Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.展开更多
The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The ma...The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.展开更多
With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction ...With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction quality control are of great significance to enhance the competitiveness of construction enterprises and realize sustainable development.In this paper,the effective strategy of construction management and the effective strategy of construction quality control will be discussed in depth,aiming at providing useful management and quality control strategies for construction enterprises.展开更多
With the deepening of the“Belt and Road”initiative,Chinese enterprises are facing unprecedented opportunities and challenges for international cooperation.This paper mainly analyzes the current situation,existing pr...With the deepening of the“Belt and Road”initiative,Chinese enterprises are facing unprecedented opportunities and challenges for international cooperation.This paper mainly analyzes the current situation,existing problems,and coping strategies of enterprise international cooperation management in the context of the“Belt and Road”.This article expounds on the importance of the“Belt and Road”initiative for international cooperation of enterprises and analyzes the key links of international cooperation management of enterprises from the aspects of internationalization strategy,cross-cultural management,risk prevention and control,and resource integration.Finally,combined with the case,this paper puts forward the management strategies and suggestions that enterprises should adopt in international cooperation,to provide a useful reference for Chinese enterprises in international cooperation in the construction of the“Belt and Road.”展开更多
With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovo...With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.展开更多
Utilization management plays a crucial role in healthcare by optimizing resource allocation,improving patient outcomes,and effectively controlling costs.By balancing patient needs with economic considerations,healthca...Utilization management plays a crucial role in healthcare by optimizing resource allocation,improving patient outcomes,and effectively controlling costs.By balancing patient needs with economic considerations,healthcare institutions can ensure efficient and sustainable service delivery.Utilization management encompasses various strategies,including prior authorization,concurrent review,and clinical pathways,to enhance care quality,manage expenses,and streamline resource use.The benefits of utilization management include cost containment,improved care standards,and the implementation of consistent treatment guidelines,thereby increasing the overall efficiency and effectiveness of healthcare delivery.展开更多
Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering ...Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.展开更多
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a...The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.展开更多
基金supported by the Natural Sciences and Engineering Research Council(NSERC)of Canada and Early Researcher Award,Ontario Government,Canada.
文摘Adopting high penetration levels of electric vehicles(EVs)necessitates the implementation of appropriate charging management systems to mitigate their negative impacts on pow-er distribution networks.Currently,most of the proposed Ev charging management techniques rely on the availability of high-bandwidth communication links.Such techniques are far from realization due to①the lack of utility-grade communica-tion systems in many cases such as secondary(low-voltage)pow-er distribution systems to which EVs are connected,rural ar-eas,remote communities,and islands,and②existing fears and concerns about the data privacy of EV users and cyber-physical security.For these cases,appropriate local control schemes are needed to ensure the adequate management of EV charging without violating the grid operation requirements.Accordingly,this paper introduces a new communication-less management strategy for EV charging in droop-controlled islanded mi-crogrids.The proposed strategy is autonomous,as it is based on the measurement of system frequency and local bus voltages.The proposed strategy implements a social charging fairness policy during periods when the microgrid distributed genera-tors(DGs)are in short supply by allocating more system capaci-ty to the EVs with less charging in the past.Furthermore,a novel communication-less EV load shedding scheme is incorpo-rated into the management strategy to provide relief to the mi-crogrid during events of severe undervoltage or underfrequency occurrences due to factors such as high loading or DG outages.Numerical simulations demonstrate the superiority of the pro-posed strategy over the state-of-the-art controllers in modulat-ing the EV charging demand to counteract microgrid instability.
基金Hebei University Affiliated Hospital Youth Fund Scientific Research Project Project Number:2019Q017。
文摘Objective:To explore the role of specialized group management in the quality control of perioperative nursing.Methods:45 surgical nurses from our hospital were selected as the research subjects.Traditional operating room management was adopted from July 2019 to June 2020,and specialized group management was adopted from July 2020 to June 2021.The surgeon’s satisfaction,surgical nurses’core professional competence,and surgical patients’satisfaction were obtained through surveys and the results were analyzed.Results:Surgeon satisfaction before the implementation of specialized group management was significantly lower than after its implementation(P<0.05).Besides,surgical nurses’core professional competency scores before the implementation of specialized group management were significantly lower than after its implementation(P<0.05).Lastly,surgical patients’satisfaction before the implementation of specialized group management was significantly lower than after its implementation(P<0.05).Conclusion:Specialized group management helps to improve the quality of perioperative care and should be applied in clinical practice.
文摘Objective:To evaluate the application value of a refined quality control management model for a sterilization supply center.Methods:A retrospective analysis was conducted on the work situation of the sterilization supply center from January 2021 to January 2023.The work situation before January 31,2022,was classified as the control group;a routine quality control management model was implemented,and the work situation after January 31,2022,was classified as the observation group.The quality of medical device management and department satisfaction between the two groups were compared.Results:The timely recovery and supply rate,classification and cleaning pass rate,disinfection pass rate,packaging pass rate,sterilization pass rate,and department satisfaction score in the observation group were all higher than those of the control group(P<0.05).Conclusion:Implementing a refined quality control management model in the sterilization supply center can improve the quality management level of medical devices and department satisfaction and is worthy of promotion.
文摘Objective: To explore the effect of evidence-based quality control circle (QCC) in improving the implementation rate of airway management measures in adult critically ill patients. Methods: Based on the Joanna Briggs Institute (JBI) evidence-based health care model, the best evidence of airway management in adult critically ill patients was obtained and applied to the clinic. Results: The total implementation rate of airway management measures in adult critically ill patients increased from 23.62% before the implementation of quality control circle to 88.82%, and the pulmonary infection rate in critically ill patients decreased from 42.31% to 21.74%, with statistical significance between the two groups (P 0.05). Conclusion: Evidence-based quality control circle activities can standardize the practice standards of airway management in critically ill patients, reduce the occurrence of patients’ airway related complications, and improve clinical outcomes.
文摘Objective:To analyze the application effect of feedforward control in outpatient blood specimen management.Methods:1,200 patients who had their venous blood collected in outpatient phlebotomy room of our hospital's outpatient clinic from January 2021 to April 2021 were selected as study subjects and divided into 600 cases in the control group and 600 cases in the observation group.The two groups of patients were compared in terms of their satisfaction with the staff,the efficiency of the nurses and the quality of nursing care,turnaround time before specimen analysis,the rejection rate of the blood specimens,and the time of result reporting.Results:After the implementation of feedforward control,patients'satisfaction with staff,nurses work efficiency and quality of care,turnaround time before specimen analysis,specimen rejection rate,and result reporting time in the observation group were significantly higher than those in the control group(P<0.05).Conclusion:The application of feedforward control in the management of outpatient blood specimens has significant effect,which effectively improves patients'satisfaction,enhances the efficiency of nurses and the quality of nursing care,shortens the turnaround time of specimens before analysis and the reporting time of results,and reduces the rejection rate of specimens.
文摘As an important pillar of national economic development,state-owned enterprises,their operational efficiency,and risk management ability are directly related to the stability and security of the national economy.As an important part of enterprise management,internal control management plays an irreplaceable role.Especially in the current domestic and international economic situation is complex and changeable,market competition is increasingly fierce environment,to strengthen the internal control management of state-owned enterprises and risk prevention measures is particularly important.This paper starts with the importance of internal control management and risk prevention for state-owned enterprises,and analyzes the problems and strategies in the internal control management and risk prevention of state-owned enterprises,in order to build a more comprehensive and efficient risk management system for state-owned enterprises to adapt to the ever-changing market environment and realize sustainable development.
文摘This paper outlines the internal control management of hospital accounting and finance,introducing its concept,importance,and objectives.It then analyzes the problems existing in the internal control management of hospital accounting and finance,including an unsound management system,insufficient system implementation,inadequate risk assessment and control capabilities,poor information communication,weak internal supervision,and uneven personnel quality.The reasons for these problems are also analyzed,including outdated management concepts,irrational organizational structures,imperfect training and incentive mechanisms,low levels of information technology,and changes in the external environment.This paper proposes improvement measures for the internal control management of hospital accounting,including enhancing the management system,strengthening system implementation,improving risk assessment and control capabilities,enhancing the information communication mechanism,strengthening internal supervision,improving personnel quality,advancing information technology,and adapting to changes in the external environment.
基金Supported by Hebei Provincial Natural Science Foundation of China(Grant Nos.E2020203174,E2020203078)S&T Program of Hebei Province of China(Grant No.226Z2202G)Science Research Project of Hebei Provincial Education Department of China(Grant No.ZD2022029).
文摘The all-wheel drive(AWD)hybrid system is a research focus on high-performance new energy vehicles that can meet the demands of dynamic performance and passing ability.Simultaneous optimization of the power and economy of hybrid vehicles becomes an issue.A unique multi-mode coupling(MMC)AWD hybrid system is presented to realize the distributed and centralized driving of the front and rear axles to achieve vectored distribution and full utilization of the system power between the axles of vehicles.Based on the parameters of the benchmarking model of a hybrid vehicle,the best model-predictive control-based energy management strategy is proposed.First,the drive system model was built after the analysis of the MMC-AWD’s drive modes.Next,three fundamental strategies were established to address power distribution adjustment and battery SOC maintenance when the SOC changed,which was followed by the design of a road driving force observer.Then,the energy consumption rate in the average time domain was processed before designing the minimum fuel consumption controller based on the equivalent fuel consumption coefficient.Finally,the advantage of the MMC-AWD was confirmed by comparison with the dynamic performance and economy of the BYD Song PLUS DMI-AWD.The findings indicate that,in comparison to the comparative hybrid system at road adhesion coefficients of 0.8 and 0.6,the MMC-AWD’s capacity to accelerate increases by 5.26%and 7.92%,respectively.When the road adhesion coefficient is 0.8,0.6,and 0.4,the maximum climbing ability increases by 14.22%,12.88%,and 4.55%,respectively.As a result,the dynamic performance is greatly enhanced,and the fuel savings rate per 100 km of mileage reaches 12.06%,which is also very economical.The proposed control strategies for the new hybrid AWD vehicle can optimize the power and economy simultaneously.
文摘The global diabetes surge poses a critical public health challenge,emphasizing the need for effective glycemic control.However,rapid correction of chronic hyperglycemia can unexpectedly trigger microvascular complications,necessitating a reevaluation of the speed and intensity of glycemic correction.Theories suggest swift blood sugar reductions may cause inflammation,oxidative stress,and neurovascular changes,resulting in complications.Healthcare providers should cautiously approach aggressive glycemic control,especially in long-standing,poorly controlled diabetes.Preventing and managing these complications requires a personalized,comprehensive approach with education,monitoring,and interdisciplinary care.Diabetes management must balance short and longterm goals,prioritizing overall well-being.This editorial underscores the need for a personalized,nuanced approach,focusing on equilibrium between glycemic control and avoiding overcorrection.
基金Supported by All India Institute of Medical Sciences Bhubaneswar Research Grant,No.AIIMS/BBSR/RS/2022/372.
文摘BACKGROUND Low back pain(LBP)is a prevalent issue that orthopedic surgeons frequently address in the outpatient setting.LBP can arise from various causes,with stiffness in the paraspinal muscles being a notable contributor.The administration of Botulinum toxin type A(BoNT-A)has been found to alleviate back pain by relaxing these stiff muscles.While BoNT-A is approved for use in numerous conditions,a limited number of randomized clinical trials(RCTs)validate its efficacy specifically for treating LBP.AIM To study the safety and the efficacy of BoNT-A in minimizing pain and improving functional outcomes in patients of chronic LBP(CLBP).METHODS In this RCT,adults aged 18-60 years with mechanical LBP persisting for at least six months were enrolled.Participants were allocated to either the Drug group,receiving 200 Ipsen Units(2 mL)of BoNT-A,or the Control group,which received a 2 mL placebo.Over a 2-month follow-up period,both groups were assessed using the Visual Analog Scale(VAS)for pain intensity and the Oswestry Disability Index(ODI)for disability at the start and conclusion of the study.A decrease in pain by 50%was deemed clinically significant.RESULTS The study followed 40 patients for two months,with 20 in each group.A clinically significant reduction in pain was observed in 36 participants.There was a statistically significant decrease in both VAS and ODI scores in the groups at the end of two months.Nonetheless,when comparing the mean score changes,only the reduction in ODI scores(15 in the placebo group vs 16.5 in the drug group,clinically insignificant)was statistically significant(P=0.012),whereas the change in mean VAS scores was not significant(P=0.45).CONCLUSION The study concludes that BoNT-A does not offer a short-term advantage over placebo in reducing pain or improving LBP scores in CLBP patients.
文摘Focusing on the two themes of"internal control"and"risk management",this paper makes an in-depth analysis of the current situation of risk management and internal control of Moutai Group.It analyzes the current situation of risk management and internal control of Moutai Group.It is found that the risk management of Moutai Group is not perfect,the information exchange is not smooth,and the internal control assessment is not perfect.Finally,it puts forward some corresponding countermeasures,including establishing an effective information communication mechanism,perfecting the risk assessment system,and strengthening the construction of the professional talent team.
文摘Hospitals are crucial healthcare facilities where patients seek treatment,and effective budget management within hospitals significantly impacts their operational efficiency and financial performance.In the age of information technology and advanced healthcare solutions,the emergence of smart hospitals represents a new trend in the medical industry’s evolution.Leveraging modern information technology can enhance the development of hospital IT systems and drive budget management toward greater intelligence.This paper begins by analyzing the influence of smart hospitals on hospital budget control.It then examines the current state of budget management control within smart hospitals.Finally,it proposes several strategies for budget management control in smart hospitals,aiming to provide guidance for relevant stakeholders.
文摘Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.
文摘The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.
文摘With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction quality control are of great significance to enhance the competitiveness of construction enterprises and realize sustainable development.In this paper,the effective strategy of construction management and the effective strategy of construction quality control will be discussed in depth,aiming at providing useful management and quality control strategies for construction enterprises.
文摘With the deepening of the“Belt and Road”initiative,Chinese enterprises are facing unprecedented opportunities and challenges for international cooperation.This paper mainly analyzes the current situation,existing problems,and coping strategies of enterprise international cooperation management in the context of the“Belt and Road”.This article expounds on the importance of the“Belt and Road”initiative for international cooperation of enterprises and analyzes the key links of international cooperation management of enterprises from the aspects of internationalization strategy,cross-cultural management,risk prevention and control,and resource integration.Finally,combined with the case,this paper puts forward the management strategies and suggestions that enterprises should adopt in international cooperation,to provide a useful reference for Chinese enterprises in international cooperation in the construction of the“Belt and Road.”
文摘With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.
文摘Utilization management plays a crucial role in healthcare by optimizing resource allocation,improving patient outcomes,and effectively controlling costs.By balancing patient needs with economic considerations,healthcare institutions can ensure efficient and sustainable service delivery.Utilization management encompasses various strategies,including prior authorization,concurrent review,and clinical pathways,to enhance care quality,manage expenses,and streamline resource use.The benefits of utilization management include cost containment,improved care standards,and the implementation of consistent treatment guidelines,thereby increasing the overall efficiency and effectiveness of healthcare delivery.
文摘Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.
文摘The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.