期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Tunnel, Infrastructure Convergences/Monitoring and Engineering Role
1
作者 Sali Bedaj 《Engineering(科研)》 2024年第5期134-147,共14页
Worldwide we see that the construction industry is expanding, requiring new directions, new perspectives that can help reduce time, cost, and make transportation easy, safe, and affordable. For decades now, most of th... Worldwide we see that the construction industry is expanding, requiring new directions, new perspectives that can help reduce time, cost, and make transportation easy, safe, and affordable. For decades now, most of the large cities have completed their surface infrastructure. It has become urgent to address their issues for overpopulated cities where nowadays all infrastructure is overwhelmed, these issues must be addressed, solved and have vision to build underground infrastructure. Developed countries are focused on expanding their infrastructure for road systems, subway network, railway, storm, and sanitary systems. The emergency for underground infrastructure development requires more large-scale projects to be built and it is becoming more crucial building tunnels/underground structures for the future than ever before. Engineering focus, scientific searches are looking to develop their ideas for designing and delivering project underground, but government, agencies and engineers are concerned about the safety, durability, functionality, and the lifetime of this structures planned to be functional for decades. To address all this concerns this study provides information of how to identify the risk on tunnels and underground structures by capturing data from the beginning phases of construction, to analyze, evaluate and produce bulletins and engineering reports through convergences and monitoring. Convergences are the key factor on development of infrastructure underground as it is the only way to explore and analyze the rock mass disturbance during excavation. Convergences and monitoring in infrastructure are the safety coefficient for building underground, preventing accidents, and assessing real risks associated with tunnel/mine works and ensuring progress of the construction in underground structures. This study delves into the engineering role of convergence monitoring, during construction activities on project excavated using New Austrian Tunnelling method and Sequential Excavation Method. The primary objective of convergence monitoring is to gather critical information on ground movements and disturbances, thereby enhancing safety measures during tunnel construction. The monitoring process serves as an early warning system offering evidence of the real risks associated with underground infrastructure, bringing results and engineering data to be used for the design as key coefficient for structural design, type of material, type and strength of the concrete, rebars, concrete mix design. By using the convergence and monitoring system on underground infrastructure this study represents information that can contribute to risk assessment, structural analysis, and the lifetime of a project. 展开更多
关键词 TUNNEL INFRASTRUCTURE convergence/monitoring Underground monitoring
下载PDF
Horizontal convergence reconstruction in the longitudinal direction for shield tunnels based on conditional random field
2
作者 Jingkang Shi Fei Wang +1 位作者 Hongwei Huang Dongming Zhang 《Underground Space》 SCIE EI CSCD 2023年第3期118-136,共19页
Tunnel horizontal convergence monitoring is essential to ensure the operation safety.However,only a few representative tunnel sec-tions are chosen for monitoring due to the cost limitation.It is difficult to capture t... Tunnel horizontal convergence monitoring is essential to ensure the operation safety.However,only a few representative tunnel sec-tions are chosen for monitoring due to the cost limitation.It is difficult to capture the horizontal convergence of each tunnel ring with limited measurements.Confronted with this difficulty,the paper proposes a horizontal convergence reconstruction method based on the measurements of deployed sensors.The tunnel horizontal convergence along the longitudinal direction is seen as a one-dimensional sta-tionary and ergodic random field.The reconstruction problem is then transformed into the generation of conditional random fields.Monte Carlo simulation is adopted to generate possible realizations and the mean of realizations is considered as the maximum likeli-hood reconstruction.Error analysis proves the effectiveness of the proposed reconstruction method.The proposed method is proved to be applicable in reconstructing the time-variant horizontal convergence and is verified by the monitoring results of the shield tunnel of Shanghai Metro Line 2.The effect of sensor numbers is parametrically studied,and an optimal sensor placement scheme is decided.Additional sensors placed at the deformation drastically changed location can significantly improve the performance of the proposed method. 展开更多
关键词 Structural performance reconstruction Tunnel convergence monitoring Conditional random field Optimal sensor placement
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部