期刊文献+
共找到9,240篇文章
< 1 2 250 >
每页显示 20 50 100
Whole-Process Project Cost Management Based on Building Information Modeling (BIM)
1
作者 Liping Yan 《Journal of Architectural Research and Development》 2024年第4期57-62,共6页
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a... The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry. 展开更多
关键词 Building Information Modeling(BIM) project cost management Data integration Information sharing cost control
下载PDF
Control and Management of Construction Project Cost 被引量:1
2
作者 ZHU Lili 《Journal of Landscape Research》 2016年第4期7-8,共2页
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje... Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost. 展开更多
关键词 Construction project Construction stage project cost Control and management
下载PDF
Research on the Development of Project Cost Informatization in the Era of Big Data 被引量:1
3
作者 Huiyu Long Yan Ma +1 位作者 Xiang Mao Xinyuerong Sun 《Journal on Big Data》 2020年第2期63-70,共8页
Under the background of big data,Informatization plays an important role in the development of the engineering cost industry.The rapid development of the industry and the increasing complexity of construction projects... Under the background of big data,Informatization plays an important role in the development of the engineering cost industry.The rapid development of the industry and the increasing complexity of construction projects require higher standards of informatization.The current information processing methods and models have been difficultly to meet new requirements.Based on this,this study deeply analyzes the key factors that impede the informatization of engineering cost development,and tries to find corresponding solutions through theoretical analysis and empirical research to break these constraints.This will play a guiding role in the development of informatization in China's engineering cost industry. 展开更多
关键词 Big data project cost engineering costs cost informatization
下载PDF
Cost Risk Appraisal: An Application of Project RiskManagement Process in Libyan Construction Projects
4
作者 Fouzi Ahmed Hossen 《Journal of Civil Engineering and Architecture》 2013年第5期591-600,共10页
Projects delay and cost overrun have become general facts in the construction industry. Project cost risk analysis considers the different costs associated with a project and focuses on the uncertainties and risks tha... Projects delay and cost overrun have become general facts in the construction industry. Project cost risk analysis considers the different costs associated with a project and focuses on the uncertainties and risks that may affect these costs. An implementation of PRM (project risk management) process on regional construction project has been carried out to maximize the likelihood of project meeting its objectives within its constraints. Qualitative and quantitative risk analyses have been carried out. The qualitative analysis is presented in a table that shows top ranked risks in Libyan construction projects based on probability-impact grid technique. In quantitative risk analyses, Mont Carlo simulation technique has been conducted to quantify and evaluate the overall level of risk exposure associated with the project completion cost. A project simulation uses a model that translates cost uncertainties into their potential impact on project objectives. A frequency curve model that represents simulation results of project completion costs has been constructed. The frequency curve model shows all possible outcomes of expected project cost at different probabilities. Project manager or decision maker can select the appropriate project budget. If a probability of 0.95 confident project budget is selected that means cost overrun risk can be minimized to a probability of 0.05. It is very helpful for project manager to take decisions based on information that shows project completion cost and its associated probability rather than usin single information of estimated cost. 展开更多
关键词 project cost risk analysis Monte Carlo simulation delay factors.
下载PDF
Research and Application of Construction Project Cost Control in Engineering Bidding Stage
5
作者 Lingtao BIAN 《International Journal of Technology Management》 2015年第4期39-41,共3页
In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and e... In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control. 展开更多
关键词 project bidding cost control Evaluation model project cost
下载PDF
Discussion on Construction Project Cost Composition and Its Management
6
作者 Yang XIAO 《International Journal of Technology Management》 2013年第7期25-27,共3页
That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of cons... That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed. 展开更多
关键词 Construction project project cost cost Composition Management Measures
下载PDF
Effective control of the project cost in the project implementation
7
作者 Yongwei Zhang 《International Journal of Technology Management》 2013年第4期79-82,共4页
After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve t... After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures. 展开更多
关键词 project cost project implementation Check the engineering measurement.
下载PDF
A Study on Cost Control of Agricultural Water Conservancy Projects Based on Activity-based Costing
8
作者 Tiantian TANG 《Asian Agricultural Research》 2017年第7期11-14,共4页
Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through th... Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through the use of literature review,case analysis and statistical analysis and other methods,with agricultural water conservancy projects as the research object,and comparing activity-based costing with the traditional model of cost accounting,the writer carries out the corresponding value chain analysis,and comes to the following conclusion: the statistical calculation and analysis of the entire construction process based on activity-based costing can accurately and effectively control the costs of water conservancy projects. Through the use of activity-based costing,the cost data of agricultural water conservancy projects is more detailed and accurate,and cost management personnel can also find non-value-added activities,optimize the enterprise's value chain and achieve cost control objectives through the analysis of the activity chain and value chain of agricultural water conservancy projects. 展开更多
关键词 Activity-based costing Agricultural water conservancy projects cost control
下载PDF
Solving resource availability cost problem in project scheduling by pseudo particle swarm optimization 被引量:4
9
作者 Jianjun Qi Bo Guo +1 位作者 Hongtao Lei Tao Zhang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2014年第1期69-76,共8页
This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations amo... This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations among the activities which require some kinds of renewable resources. We predigest the process of sol-ving the resource availability cost problem (RACP) by using start time of each activity to code the schedule. Then, a novel heuris-tic algorithm is proposed to make the process of looking for the best solution efficiently. And then pseudo particle swarm optimiza-tion (PPSO) combined with PSO and path relinking procedure is presented to solve the RACP. Final y, comparative computational experiments are designed and the computational results show that the proposed method is very effective to solve RACP. 展开更多
关键词 project scheduling resource availability cost problem(RACP) HEURISTICS particle swarm optimization (PSO) path relin-king.
下载PDF
The Project Cost Control of China Thermal Power Project
10
作者 Lei Xueqin(Techno-economic Department, CPECC) 《Electricity》 1999年第2期41-43,共3页
关键词 The project cost Control of China Thermal Power project
下载PDF
Lower Project Cost,Shorten Construction Schedule and Promote Market Competition of Fossil Power Plants
11
《Electricity》 1999年第3期23-27,共5页
关键词 project Lower project cost Shorten Construction Schedule and Promote Market Competition of Fossil Power Plants
下载PDF
Exploring the Digital Talent Training Mode of Project Cost Specialty in Higher Vocational Colleges
12
作者 Li Song 《Journal of Architectural Research and Development》 2022年第2期22-25,共4页
Project construction,design,management,operation,and maintenance are all undergoing digital transformations,and project cost professionals’working mode and content will change as a result.This paper reviews the exist... Project construction,design,management,operation,and maintenance are all undergoing digital transformations,and project cost professionals’working mode and content will change as a result.This paper reviews the existing challenges in traditional talent training and adjusts training ideas as well as training modes to conform to the industry’s digital transformation trend as a training base for project cost talents. 展开更多
关键词 DIGITIZATION Talent training project cost specialty Higher vocational college
下载PDF
Analyses on schedule-cost coefficient correlation of spaceflight project based on historical statistics and its application
13
作者 Liu Yanqiong Chen Yingwu 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2006年第4期769-774,共6页
When analyze the uncertainty of the cost and the schedule of the spaceflight project, it is needed to know the value of the schedule-cost correlation coefficient. This paper deduces the schedule distribution, consider... When analyze the uncertainty of the cost and the schedule of the spaceflight project, it is needed to know the value of the schedule-cost correlation coefficient. This paper deduces the schedule distribution, considering the effect of the cost, and proposes the estimation formula of the correlation coefficient between the in(schedule) and the cost. On the basis of the fact and Taylor expansion, the relation expression between the schedule-cost correlation coefficient and the in-schedule-cost correlation coefficient is put forward. By analyzing the value features of the estimation formula of the in-schedule-cost correlation coefficient, the general rules are proposed to ascertain the value of the schedule-cost correlation coefficient. An example is given to demonstrate how to approximately amend the schedule-cost correlation coefficient based on the historical statistics, which reveals the traditional assigned value is inaccurate. The universality of this estimation method is analyzed. 展开更多
关键词 cost SCHEDULE correlation coefficient spaceflight project management risk.
下载PDF
Model of Cost-benefit Flow in Six Green Projects in China
14
作者 ZhuYongjie ZhouBoling 《Forestry Studies in China》 CAS 2003年第3期49-53,共5页
From the point of cost-benefit flow and with the Six Green Projects in China as the case and background, it is criticized that the current natural resource and environmental management and the policies in China have s... From the point of cost-benefit flow and with the Six Green Projects in China as the case and background, it is criticized that the current natural resource and environmental management and the policies in China have some problems unsolved since the model of cost-benefit flow is still centralized and mainly in an administrative way in spite of many efforts made theoretically and practically. It is suggested that a new model based on market-oriented economy from the point of cost-benefit flow with Six Green Projects Management and Policies System consist of complete natural reserve (NR). Management system included environmental nature reserves in addition to biodiversity nature reserve, paid using nature resources, an environmental conservation and construction industry and renewable resource production incentive system that turn the direct administration and operation to management and services. The detail figure of the new model of cost-benefit flow is provided and the main points related are discussed in this paper. 展开更多
关键词 Six Green projects model of cost-benefit flow management and policy frame
下载PDF
Estimation Method of Schedule-cost Correlation Coefficient of Spaceflight Project
15
作者 Liu Yanqiong(Humanity and Social Science School,National University of Defence Technology,Changsha,410073,China) 《工程科学(英文版)》 2007年第3期69-75,共7页
To evaluate the cost risk and the schedule risk of the spaceflight project,the schedule-cost(S-C) correlation coefficient is directly appointed according to the experts' experience usually.This paper deduces SDMCU... To evaluate the cost risk and the schedule risk of the spaceflight project,the schedule-cost(S-C) correlation coefficient is directly appointed according to the experts' experience usually.This paper deduces SDMCU(the schedule distribution model considering the effect of the cost uncertainty),and then proposes the approximate formula to estimate the ln(S)-C correlation coefficient based on the models of SDMCU and CDMSU(the cost distribution model considering the effect of the schedule uncertainty).Furthermore,an approximate relationship expression of the S-C and the ln(S)-C correlation coefficients is put forward according to general facts and the Taylor expansion,and advanced by means of mass numerical validation is the general rule of obtaining the estimation value of the schedule-cost correlation coefficient based on the historical data. 展开更多
关键词 SPACEFLIGHT project risk cost SCHEDULE CORRELATION COEFFICIENT
下载PDF
Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
16
作者 Muhammad Ilyas Jing Li Irfan Ullah 《World Journal of Engineering and Technology》 2020年第1期1-12,共12页
Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems... Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems, the?paper examines predominant impact on elements causing the mission postponement and cost. A poll review was led for the situation study embracing various information-gathering procedures. The discoveries from the contextual investigation uncovered that the most persuasive factors in Malaysia:?1) contractor’s inappropriate arranging, 2) poor site the board, 3) deficient contractual worker experience,?are the most powerful factors. This paper has likewise broken down the normal and least effective of the postpone variables causing task deferral and cost overrun in Malaysia. It likewise infers that there are various measures as per the idea of deferring components to decrease the effect on task postponement and cost overruns in the development industry.?There are significant factors in the control of time overrun that would be actual thought related to know and tackle in great impact to improvement rate which may additionally no capacity that be recovered. Thirty (30) massive development extensions in Malaysia were exceptional coping with time overrun at some stage in development. Out of 30 undertakings, 17 (56.67%) ventures had been introduced by using 1100 days’ time overrun, 5 (16.67%) extensions in the middle of a hundred and one to 200 days, 5 (16.67%) ventures?201 to 300 days while three (10%) ventures have been deferred for timeframe over 300 days. 展开更多
关键词 cost and TIME Overruns DELAY Factors Construction Industry projectS DELAY
下载PDF
海洋石油工程项目费用控制策略浅析
17
作者 黄钰 王阔 李宁 《化工管理》 2024年第23期1-3,20,共4页
文章通过系统的费用控制方法,分析海洋石油工程项目在设计、采购、施工及核算阶段的费用控制关键环节,提出了有效的费用控制策略。研究结果表明,通过准确的成本估算、全面的风险管理、严格的合同管理以及技术创新等策略,可以有效管理和... 文章通过系统的费用控制方法,分析海洋石油工程项目在设计、采购、施工及核算阶段的费用控制关键环节,提出了有效的费用控制策略。研究结果表明,通过准确的成本估算、全面的风险管理、严格的合同管理以及技术创新等策略,可以有效管理和控制项目成本,减少费用超支的风险,为海洋石油工程项目的项目管理者和决策者提供了一套全面的费用控制框架,有助于提高项目的整体成功率和经济效益。 展开更多
关键词 海洋工程项目 费用控制 关键环节 石油化工
下载PDF
工程造价超预算的原因分析和控制方法研究
18
作者 胡立群 唐克静 +2 位作者 周文瑞 汤飞 江柳清 《湖北工业职业技术学院学报》 2024年第3期76-79,共4页
在工程项目实施过程中,工程造价控制成为项目管理中的关键环节。本文从工程造价预算控制有益于项目顺利结算、有利于项目合理投入、有助于减少变更数量三个方面阐述了其意义。提出了造成超预算是因为施工组织设计脱离实际、工程施工进... 在工程项目实施过程中,工程造价控制成为项目管理中的关键环节。本文从工程造价预算控制有益于项目顺利结算、有利于项目合理投入、有助于减少变更数量三个方面阐述了其意义。提出了造成超预算是因为施工组织设计脱离实际、工程施工进度失去控制、项目成本管理缺乏力度三个主要原因,提出了相应的控制方法,应严审施工组织设计以减少施工变更、严控工程施工进度以降低延期消耗、强化预算控制意识以提升投入效能。 展开更多
关键词 工程造价 超预算 控制方法 项目管理
下载PDF
项目成本控制下饲料厂房建设期工程造价动态管理研究
19
作者 孙志丽 《中国饲料》 北大核心 2024年第6期101-104,共4页
饲料厂房建设期工程造价动态管理是饲料企业项目成本控制的重要方面,旨在通过严格把控饲料厂房建设各环节成本支出的方式,实现饲料厂房建设项目经济效益最大化的目标。本文基于项目成本控制视角,在探讨饲料厂房建设工程造价动态管理影... 饲料厂房建设期工程造价动态管理是饲料企业项目成本控制的重要方面,旨在通过严格把控饲料厂房建设各环节成本支出的方式,实现饲料厂房建设项目经济效益最大化的目标。本文基于项目成本控制视角,在探讨饲料厂房建设工程造价动态管理影响因素的基础上,分析工程造价动态管理应用于饲料厂房建设时存在的问题并提出相应对策,以期提升建设期工程造价动态管理的效果。 展开更多
关键词 饲料厂房 动态管理 项目成本 工程造价
下载PDF
装配式建筑成本控制方法与措施探究
20
作者 张爱环 王汝焕 方俊一 《江西建材》 2024年第6期366-369,共4页
近年来,国家大力倡导绿色低碳、节能环保理念,传统建筑业污染严重、材料浪费大、效率低,装配式建筑采用工业化生产模式,代表建筑业一大发展趋势。目前,装配式建筑成本居高不下,高成本成为制约其发展的阻碍。基于此,文中根据工程案例进... 近年来,国家大力倡导绿色低碳、节能环保理念,传统建筑业污染严重、材料浪费大、效率低,装配式建筑采用工业化生产模式,代表建筑业一大发展趋势。目前,装配式建筑成本居高不下,高成本成为制约其发展的阻碍。基于此,文中根据工程案例进行装配式建筑项目成本影响因素分析,并提出控制对策建议,为推动装配式建筑发展提供参考。 展开更多
关键词 装配式建筑 成本控制 施工项目
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部