The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a...The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.展开更多
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje...Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.展开更多
Under the background of big data,Informatization plays an important role in the development of the engineering cost industry.The rapid development of the industry and the increasing complexity of construction projects...Under the background of big data,Informatization plays an important role in the development of the engineering cost industry.The rapid development of the industry and the increasing complexity of construction projects require higher standards of informatization.The current information processing methods and models have been difficultly to meet new requirements.Based on this,this study deeply analyzes the key factors that impede the informatization of engineering cost development,and tries to find corresponding solutions through theoretical analysis and empirical research to break these constraints.This will play a guiding role in the development of informatization in China's engineering cost industry.展开更多
Projects delay and cost overrun have become general facts in the construction industry. Project cost risk analysis considers the different costs associated with a project and focuses on the uncertainties and risks tha...Projects delay and cost overrun have become general facts in the construction industry. Project cost risk analysis considers the different costs associated with a project and focuses on the uncertainties and risks that may affect these costs. An implementation of PRM (project risk management) process on regional construction project has been carried out to maximize the likelihood of project meeting its objectives within its constraints. Qualitative and quantitative risk analyses have been carried out. The qualitative analysis is presented in a table that shows top ranked risks in Libyan construction projects based on probability-impact grid technique. In quantitative risk analyses, Mont Carlo simulation technique has been conducted to quantify and evaluate the overall level of risk exposure associated with the project completion cost. A project simulation uses a model that translates cost uncertainties into their potential impact on project objectives. A frequency curve model that represents simulation results of project completion costs has been constructed. The frequency curve model shows all possible outcomes of expected project cost at different probabilities. Project manager or decision maker can select the appropriate project budget. If a probability of 0.95 confident project budget is selected that means cost overrun risk can be minimized to a probability of 0.05. It is very helpful for project manager to take decisions based on information that shows project completion cost and its associated probability rather than usin single information of estimated cost.展开更多
In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and e...In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.展开更多
That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of cons...That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed.展开更多
After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve t...After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.展开更多
Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through th...Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through the use of literature review,case analysis and statistical analysis and other methods,with agricultural water conservancy projects as the research object,and comparing activity-based costing with the traditional model of cost accounting,the writer carries out the corresponding value chain analysis,and comes to the following conclusion: the statistical calculation and analysis of the entire construction process based on activity-based costing can accurately and effectively control the costs of water conservancy projects. Through the use of activity-based costing,the cost data of agricultural water conservancy projects is more detailed and accurate,and cost management personnel can also find non-value-added activities,optimize the enterprise's value chain and achieve cost control objectives through the analysis of the activity chain and value chain of agricultural water conservancy projects.展开更多
This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations amo...This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations among the activities which require some kinds of renewable resources. We predigest the process of sol-ving the resource availability cost problem (RACP) by using start time of each activity to code the schedule. Then, a novel heuris-tic algorithm is proposed to make the process of looking for the best solution efficiently. And then pseudo particle swarm optimiza-tion (PPSO) combined with PSO and path relinking procedure is presented to solve the RACP. Final y, comparative computational experiments are designed and the computational results show that the proposed method is very effective to solve RACP.展开更多
Project construction,design,management,operation,and maintenance are all undergoing digital transformations,and project cost professionals’working mode and content will change as a result.This paper reviews the exist...Project construction,design,management,operation,and maintenance are all undergoing digital transformations,and project cost professionals’working mode and content will change as a result.This paper reviews the existing challenges in traditional talent training and adjusts training ideas as well as training modes to conform to the industry’s digital transformation trend as a training base for project cost talents.展开更多
When analyze the uncertainty of the cost and the schedule of the spaceflight project, it is needed to know the value of the schedule-cost correlation coefficient. This paper deduces the schedule distribution, consider...When analyze the uncertainty of the cost and the schedule of the spaceflight project, it is needed to know the value of the schedule-cost correlation coefficient. This paper deduces the schedule distribution, considering the effect of the cost, and proposes the estimation formula of the correlation coefficient between the in(schedule) and the cost. On the basis of the fact and Taylor expansion, the relation expression between the schedule-cost correlation coefficient and the in-schedule-cost correlation coefficient is put forward. By analyzing the value features of the estimation formula of the in-schedule-cost correlation coefficient, the general rules are proposed to ascertain the value of the schedule-cost correlation coefficient. An example is given to demonstrate how to approximately amend the schedule-cost correlation coefficient based on the historical statistics, which reveals the traditional assigned value is inaccurate. The universality of this estimation method is analyzed.展开更多
From the point of cost-benefit flow and with the Six Green Projects in China as the case and background, it is criticized that the current natural resource and environmental management and the policies in China have s...From the point of cost-benefit flow and with the Six Green Projects in China as the case and background, it is criticized that the current natural resource and environmental management and the policies in China have some problems unsolved since the model of cost-benefit flow is still centralized and mainly in an administrative way in spite of many efforts made theoretically and practically. It is suggested that a new model based on market-oriented economy from the point of cost-benefit flow with Six Green Projects Management and Policies System consist of complete natural reserve (NR). Management system included environmental nature reserves in addition to biodiversity nature reserve, paid using nature resources, an environmental conservation and construction industry and renewable resource production incentive system that turn the direct administration and operation to management and services. The detail figure of the new model of cost-benefit flow is provided and the main points related are discussed in this paper.展开更多
To evaluate the cost risk and the schedule risk of the spaceflight project,the schedule-cost(S-C) correlation coefficient is directly appointed according to the experts' experience usually.This paper deduces SDMCU...To evaluate the cost risk and the schedule risk of the spaceflight project,the schedule-cost(S-C) correlation coefficient is directly appointed according to the experts' experience usually.This paper deduces SDMCU(the schedule distribution model considering the effect of the cost uncertainty),and then proposes the approximate formula to estimate the ln(S)-C correlation coefficient based on the models of SDMCU and CDMSU(the cost distribution model considering the effect of the schedule uncertainty).Furthermore,an approximate relationship expression of the S-C and the ln(S)-C correlation coefficients is put forward according to general facts and the Taylor expansion,and advanced by means of mass numerical validation is the general rule of obtaining the estimation value of the schedule-cost correlation coefficient based on the historical data.展开更多
Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems...Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems, the?paper examines predominant impact on elements causing the mission postponement and cost. A poll review was led for the situation study embracing various information-gathering procedures. The discoveries from the contextual investigation uncovered that the most persuasive factors in Malaysia:?1) contractor’s inappropriate arranging, 2) poor site the board, 3) deficient contractual worker experience,?are the most powerful factors. This paper has likewise broken down the normal and least effective of the postpone variables causing task deferral and cost overrun in Malaysia. It likewise infers that there are various measures as per the idea of deferring components to decrease the effect on task postponement and cost overruns in the development industry.?There are significant factors in the control of time overrun that would be actual thought related to know and tackle in great impact to improvement rate which may additionally no capacity that be recovered. Thirty (30) massive development extensions in Malaysia were exceptional coping with time overrun at some stage in development. Out of 30 undertakings, 17 (56.67%) ventures had been introduced by using 1100 days’ time overrun, 5 (16.67%) extensions in the middle of a hundred and one to 200 days, 5 (16.67%) ventures?201 to 300 days while three (10%) ventures have been deferred for timeframe over 300 days.展开更多
文摘The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.
文摘Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.
基金Innovation Training Project of Hunan Province(S201911532062).
文摘Under the background of big data,Informatization plays an important role in the development of the engineering cost industry.The rapid development of the industry and the increasing complexity of construction projects require higher standards of informatization.The current information processing methods and models have been difficultly to meet new requirements.Based on this,this study deeply analyzes the key factors that impede the informatization of engineering cost development,and tries to find corresponding solutions through theoretical analysis and empirical research to break these constraints.This will play a guiding role in the development of informatization in China's engineering cost industry.
文摘Projects delay and cost overrun have become general facts in the construction industry. Project cost risk analysis considers the different costs associated with a project and focuses on the uncertainties and risks that may affect these costs. An implementation of PRM (project risk management) process on regional construction project has been carried out to maximize the likelihood of project meeting its objectives within its constraints. Qualitative and quantitative risk analyses have been carried out. The qualitative analysis is presented in a table that shows top ranked risks in Libyan construction projects based on probability-impact grid technique. In quantitative risk analyses, Mont Carlo simulation technique has been conducted to quantify and evaluate the overall level of risk exposure associated with the project completion cost. A project simulation uses a model that translates cost uncertainties into their potential impact on project objectives. A frequency curve model that represents simulation results of project completion costs has been constructed. The frequency curve model shows all possible outcomes of expected project cost at different probabilities. Project manager or decision maker can select the appropriate project budget. If a probability of 0.95 confident project budget is selected that means cost overrun risk can be minimized to a probability of 0.05. It is very helpful for project manager to take decisions based on information that shows project completion cost and its associated probability rather than usin single information of estimated cost.
文摘In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.
文摘That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed.
文摘After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.
文摘Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through the use of literature review,case analysis and statistical analysis and other methods,with agricultural water conservancy projects as the research object,and comparing activity-based costing with the traditional model of cost accounting,the writer carries out the corresponding value chain analysis,and comes to the following conclusion: the statistical calculation and analysis of the entire construction process based on activity-based costing can accurately and effectively control the costs of water conservancy projects. Through the use of activity-based costing,the cost data of agricultural water conservancy projects is more detailed and accurate,and cost management personnel can also find non-value-added activities,optimize the enterprise's value chain and achieve cost control objectives through the analysis of the activity chain and value chain of agricultural water conservancy projects.
基金supported by the National Natural Science Foundation of China(7120116671201170)
文摘This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations among the activities which require some kinds of renewable resources. We predigest the process of sol-ving the resource availability cost problem (RACP) by using start time of each activity to code the schedule. Then, a novel heuris-tic algorithm is proposed to make the process of looking for the best solution efficiently. And then pseudo particle swarm optimiza-tion (PPSO) combined with PSO and path relinking procedure is presented to solve the RACP. Final y, comparative computational experiments are designed and the computational results show that the proposed method is very effective to solve RACP.
文摘Project construction,design,management,operation,and maintenance are all undergoing digital transformations,and project cost professionals’working mode and content will change as a result.This paper reviews the existing challenges in traditional talent training and adjusts training ideas as well as training modes to conform to the industry’s digital transformation trend as a training base for project cost talents.
基金This project was supported by Weapon System Advanced Research Foundation(51419010204KG01) and National ScienceFoundation of China(70272002).
文摘When analyze the uncertainty of the cost and the schedule of the spaceflight project, it is needed to know the value of the schedule-cost correlation coefficient. This paper deduces the schedule distribution, considering the effect of the cost, and proposes the estimation formula of the correlation coefficient between the in(schedule) and the cost. On the basis of the fact and Taylor expansion, the relation expression between the schedule-cost correlation coefficient and the in-schedule-cost correlation coefficient is put forward. By analyzing the value features of the estimation formula of the in-schedule-cost correlation coefficient, the general rules are proposed to ascertain the value of the schedule-cost correlation coefficient. An example is given to demonstrate how to approximately amend the schedule-cost correlation coefficient based on the historical statistics, which reveals the traditional assigned value is inaccurate. The universality of this estimation method is analyzed.
文摘From the point of cost-benefit flow and with the Six Green Projects in China as the case and background, it is criticized that the current natural resource and environmental management and the policies in China have some problems unsolved since the model of cost-benefit flow is still centralized and mainly in an administrative way in spite of many efforts made theoretically and practically. It is suggested that a new model based on market-oriented economy from the point of cost-benefit flow with Six Green Projects Management and Policies System consist of complete natural reserve (NR). Management system included environmental nature reserves in addition to biodiversity nature reserve, paid using nature resources, an environmental conservation and construction industry and renewable resource production incentive system that turn the direct administration and operation to management and services. The detail figure of the new model of cost-benefit flow is provided and the main points related are discussed in this paper.
文摘To evaluate the cost risk and the schedule risk of the spaceflight project,the schedule-cost(S-C) correlation coefficient is directly appointed according to the experts' experience usually.This paper deduces SDMCU(the schedule distribution model considering the effect of the cost uncertainty),and then proposes the approximate formula to estimate the ln(S)-C correlation coefficient based on the models of SDMCU and CDMSU(the cost distribution model considering the effect of the schedule uncertainty).Furthermore,an approximate relationship expression of the S-C and the ln(S)-C correlation coefficients is put forward according to general facts and the Taylor expansion,and advanced by means of mass numerical validation is the general rule of obtaining the estimation value of the schedule-cost correlation coefficient based on the historical data.
文摘Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems, the?paper examines predominant impact on elements causing the mission postponement and cost. A poll review was led for the situation study embracing various information-gathering procedures. The discoveries from the contextual investigation uncovered that the most persuasive factors in Malaysia:?1) contractor’s inappropriate arranging, 2) poor site the board, 3) deficient contractual worker experience,?are the most powerful factors. This paper has likewise broken down the normal and least effective of the postpone variables causing task deferral and cost overrun in Malaysia. It likewise infers that there are various measures as per the idea of deferring components to decrease the effect on task postponement and cost overruns in the development industry.?There are significant factors in the control of time overrun that would be actual thought related to know and tackle in great impact to improvement rate which may additionally no capacity that be recovered. Thirty (30) massive development extensions in Malaysia were exceptional coping with time overrun at some stage in development. Out of 30 undertakings, 17 (56.67%) ventures had been introduced by using 1100 days’ time overrun, 5 (16.67%) extensions in the middle of a hundred and one to 200 days, 5 (16.67%) ventures?201 to 300 days while three (10%) ventures have been deferred for timeframe over 300 days.