Background: Venous thromboembolism (VTE) is a major public health problem due to its increasing frequency, mortality and management cost. This cost may require major financial efforts from patients, especially in deve...Background: Venous thromboembolism (VTE) is a major public health problem due to its increasing frequency, mortality and management cost. This cost may require major financial efforts from patients, especially in developing countries like ours where less than 7% of the population has health insurance. This study aimed to estimate the direct cost of managing VTE in three reference hospitals in Yaoundé. Methods: This was a cross-sectional retrospective study over a three-year period (from January 1st 2018 to December 31 2020) carried out in the Cardiology departments of the Central and General Hospitals, and the Emergency Centre of the city of Yaoundé. All patients managed during the study period for deep vein thrombosis and pulmonary embolism confirmed by venous ultrasound coupled with Doppler and computed tomography pulmonary angiography respectively were included. For each patient, we collected sociodemographic and clinical data as well as data on the cost of consultation, hospital stay, workups and medications. These data were analysed using SPSS version 23.0. Results: A total of 92 patient’s records were analysed. The median age was 60 years [48 - 68] with a sex ratio of 0.53. The median direct cost of management of venous thromboembolism was 766,375 CFAF [536,455 - 1,029,745] or $1415 USD. Management of pulmonary embolism associated with deep vein thrombosis was more costly than isolated pulmonary embolism or deep vein thrombosis. Factors influencing the direct cost of management of venous thromboembolism were: hospital structure (p = 0.015), health insurance (p 0.001), type of pulmonary embolism (p = 0.021), and length of hospital stay (p = 0.001). Conclusion: Management of VTE is a major financial burden for our patients and this burden is influenced by the hospital structure, health insurance, type of pulmonary embolism and length of hospital stay.展开更多
With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovo...With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.展开更多
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a...The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.展开更多
This paper presents a peer-to-peer community cost optimization approach based on a single-prosumer energy management system.Its objective is to optimize energy costs for prosumers in the community by enhancing the con...This paper presents a peer-to-peer community cost optimization approach based on a single-prosumer energy management system.Its objective is to optimize energy costs for prosumers in the community by enhancing the consumption efficiency.This study was conducted along two main axes.The first axis focuses on designing a digital twin for a residential community microgrid platform.This phase involves data collection,cleaning,exploration,and interpretation.Moreover,it includes replicating the functionality of the real platform and validating the results.The second axis involves the development of a novel approach that incorporates two distinct prosumer behaviors within the same community microgrid,while maintaining the concept of peer-to-peer energy trading.Prosumers without storage utilize their individual PV systems to fulfill their energy requirements and inject excess energy into a local microgrid.Meanwhile,a single prosumer with a storage system actively engages in energy exchange to maximize the community’s profit.This is achieved by optimizing battery usage using a cost optimization solution.The proposed solution is validated using the developed digital twin.展开更多
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ...Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.展开更多
In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of...In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.展开更多
According to classical economic theory,external cost is the indirect,and uncompensated,social or environmental cost caused to an uninvolved third party that arises as an effect of another party’s activity.In light of...According to classical economic theory,external cost is the indirect,and uncompensated,social or environmental cost caused to an uninvolved third party that arises as an effect of another party’s activity.In light of this,the environmental cost caused by ballast water is considered as a negative externality.This paper aims to contribute by proposing that the environmental cost caused by ballast water can be determined through questionnaires,and that the imposition of a Pigouvian retributive tax is required to compensate for the environmental damage caused.The paper proceeds as follows.Firstly,ballast water management is discussed.Second,the environmental cost is discussed and it is asserted that it is important to have clear regulations and to update them frequently to prevent or minimize ballast water’s negative impact on the environment.Finally,it is suggested that the environmental cost caused by ballast water can be determined by questionnaires and,more specifically,by the WTP(Willingness to Pay)method,and that a special Pigouvian corrective taxation which can internalize this cost should be imposed.展开更多
In view of economic globalization,China’s economy has entered a stage of normalized development.In the post pandemic era,the costs of raw materials,production,sales,and labor in Chinese enterprises continue to increa...In view of economic globalization,China’s economy has entered a stage of normalized development.In the post pandemic era,the costs of raw materials,production,sales,and labor in Chinese enterprises continue to increase,leading to severe competitive pressure among the enterprises.Therefore,it is of great theoretical and practical significance to actively apply the relevant theories of management economics to guide the cost management of Chinese enterprises,improve their economic benefits,and promote healthy and sustainable development.Currently,there are still many problems in terms of cost management in Chinese enterprises.Therefore,it is crucial to address these problems and further improve the effectiveness of cost management.This paper presents an overview of cost management and an analysis of the specific problems and provide corresponding countermeasures,in hopes of to providing a reference for cost management in enterprises and achieve the goal of stable and sustainable development of China’s economy.展开更多
The era of information technology has dawned on the construction industry,and Building Information Modeling(BIM)is one of the necessary engineering skills for those engaged in civil engineering professions at present ...The era of information technology has dawned on the construction industry,and Building Information Modeling(BIM)is one of the necessary engineering skills for those engaged in civil engineering professions at present and those who will engage in these professions in the future.Therefore,top universities have begun exploring ways to increase BIM-related teaching content in the curriculum system.In this paper,we discuss the integration of BIM in an in-depth manner with regard to the four course modules offered by cost engineering majors(professional foundation course,professional core course,industry-oriented course,and professional practical course)and analyze the construction of BIM curriculum ideology and politics system,the setting of teaching objectives,and the key points of curriculum ideology and politics.展开更多
With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into th...With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.展开更多
The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance bet...The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance between regions shorter and shorter.However,the construction of highway engineering is a big project,which not only has a long cycle,but also has a high economic cost.During the construction process,a large number of construction materials and personnel will be applied.If the project cost management is not implemented for the highway construction,it will easily affect the final quality and profit of the entire project.This article expounds the significance of dynamic management and control of highway engineering cost,and analyzes the strategy of dynamic management and control of highway engineering cost.展开更多
Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction sta...Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.展开更多
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje...Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.展开更多
Cost recovery and user satisfaction are among the core objectives of any public or quas-public good provision.Public toilet service provision has been the domain of local government until when liberalisation policies ...Cost recovery and user satisfaction are among the core objectives of any public or quas-public good provision.Public toilet service provision has been the domain of local government until when liberalisation policies struck the developing south.With stringent condition to reduce the fiscal burden,local government authorities have sought to offload some of its core functions including the management of public toilets to contracted firms.Based on regression and comparative quadrant analysis,this study evaluates cost recovery and user satisfaction in relation to public toilet condition based on a total of 729 user responses and 31 public toilet operators.The observations point to misguided decision to place public toilet management under contracted firms instead of placing then under Public Private Partnership(PPP).The decision to place public toilets management under private contract or individual contract is only secondary to PPP if the focus is to achieve both cost recovery and user satisfaction.However,if the focus was to achieve only cost recovery regardless of the need to protect users,then the decision would have been well founded but can be conspired inappropriate in as long as public toilets remain the domain of public good.展开更多
The economic management of colleges and universities has always been a topic of great concern to China’s educational career,therefore,this paper will firstly make the necessary analysis of the current implementation ...The economic management of colleges and universities has always been a topic of great concern to China’s educational career,therefore,this paper will firstly make the necessary analysis of the current implementation of the economic management of colleges and universities in China,and then the reasons for the problems of economic management of colleges and universities in China is realized a detailed investigation,and finally,the economic management of colleges and universities based on capital and cost management optimization strategy is made a full discussion,looking forward to providing the necessary guidance for researchers in this field.展开更多
The issue of water scarcity highlights the importance of watershed management. A sound watershed manage- ment should make all water users share the incurred cost. This study analyzes the optimal allocation of watershe...The issue of water scarcity highlights the importance of watershed management. A sound watershed manage- ment should make all water users share the incurred cost. This study analyzes the optimal allocation of watershed management cost among different water users. As a consumable, water should be allocated to different users the amounts in which their marginal utilities (MUs) or marginal products (MPs) of water are equal. The value of MUs or MPs equals the water price that the watershed manager charges. When water is simultaneously used as consumable and non- consumable, the watershed manager produces the quantity of water in which the sum of MUs and/or MPs for the two types of uses equals the marginal cost of water production. Each water user should share the portion of watershed management cost in the percentage that his MU or MP accounts for the sum of MUs and/or MPs. Thus, the price of consumable water does not equal the marginal cost of water production even if there is no public good.展开更多
文摘Background: Venous thromboembolism (VTE) is a major public health problem due to its increasing frequency, mortality and management cost. This cost may require major financial efforts from patients, especially in developing countries like ours where less than 7% of the population has health insurance. This study aimed to estimate the direct cost of managing VTE in three reference hospitals in Yaoundé. Methods: This was a cross-sectional retrospective study over a three-year period (from January 1st 2018 to December 31 2020) carried out in the Cardiology departments of the Central and General Hospitals, and the Emergency Centre of the city of Yaoundé. All patients managed during the study period for deep vein thrombosis and pulmonary embolism confirmed by venous ultrasound coupled with Doppler and computed tomography pulmonary angiography respectively were included. For each patient, we collected sociodemographic and clinical data as well as data on the cost of consultation, hospital stay, workups and medications. These data were analysed using SPSS version 23.0. Results: A total of 92 patient’s records were analysed. The median age was 60 years [48 - 68] with a sex ratio of 0.53. The median direct cost of management of venous thromboembolism was 766,375 CFAF [536,455 - 1,029,745] or $1415 USD. Management of pulmonary embolism associated with deep vein thrombosis was more costly than isolated pulmonary embolism or deep vein thrombosis. Factors influencing the direct cost of management of venous thromboembolism were: hospital structure (p = 0.015), health insurance (p 0.001), type of pulmonary embolism (p = 0.021), and length of hospital stay (p = 0.001). Conclusion: Management of VTE is a major financial burden for our patients and this burden is influenced by the hospital structure, health insurance, type of pulmonary embolism and length of hospital stay.
文摘With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.
文摘The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.
基金supported by the Tunisian Ministry of Higher Education and Scientific Research under Grant LSE-ENIT-LR 11ES15funded in part by the PAQ-Collabora(PAR&I-Tk)program。
文摘This paper presents a peer-to-peer community cost optimization approach based on a single-prosumer energy management system.Its objective is to optimize energy costs for prosumers in the community by enhancing the consumption efficiency.This study was conducted along two main axes.The first axis focuses on designing a digital twin for a residential community microgrid platform.This phase involves data collection,cleaning,exploration,and interpretation.Moreover,it includes replicating the functionality of the real platform and validating the results.The second axis involves the development of a novel approach that incorporates two distinct prosumer behaviors within the same community microgrid,while maintaining the concept of peer-to-peer energy trading.Prosumers without storage utilize their individual PV systems to fulfill their energy requirements and inject excess energy into a local microgrid.Meanwhile,a single prosumer with a storage system actively engages in energy exchange to maximize the community’s profit.This is achieved by optimizing battery usage using a cost optimization solution.The proposed solution is validated using the developed digital twin.
文摘Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects.
文摘In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.
文摘According to classical economic theory,external cost is the indirect,and uncompensated,social or environmental cost caused to an uninvolved third party that arises as an effect of another party’s activity.In light of this,the environmental cost caused by ballast water is considered as a negative externality.This paper aims to contribute by proposing that the environmental cost caused by ballast water can be determined through questionnaires,and that the imposition of a Pigouvian retributive tax is required to compensate for the environmental damage caused.The paper proceeds as follows.Firstly,ballast water management is discussed.Second,the environmental cost is discussed and it is asserted that it is important to have clear regulations and to update them frequently to prevent or minimize ballast water’s negative impact on the environment.Finally,it is suggested that the environmental cost caused by ballast water can be determined by questionnaires and,more specifically,by the WTP(Willingness to Pay)method,and that a special Pigouvian corrective taxation which can internalize this cost should be imposed.
文摘In view of economic globalization,China’s economy has entered a stage of normalized development.In the post pandemic era,the costs of raw materials,production,sales,and labor in Chinese enterprises continue to increase,leading to severe competitive pressure among the enterprises.Therefore,it is of great theoretical and practical significance to actively apply the relevant theories of management economics to guide the cost management of Chinese enterprises,improve their economic benefits,and promote healthy and sustainable development.Currently,there are still many problems in terms of cost management in Chinese enterprises.Therefore,it is crucial to address these problems and further improve the effectiveness of cost management.This paper presents an overview of cost management and an analysis of the specific problems and provide corresponding countermeasures,in hopes of to providing a reference for cost management in enterprises and achieve the goal of stable and sustainable development of China’s economy.
文摘The era of information technology has dawned on the construction industry,and Building Information Modeling(BIM)is one of the necessary engineering skills for those engaged in civil engineering professions at present and those who will engage in these professions in the future.Therefore,top universities have begun exploring ways to increase BIM-related teaching content in the curriculum system.In this paper,we discuss the integration of BIM in an in-depth manner with regard to the four course modules offered by cost engineering majors(professional foundation course,professional core course,industry-oriented course,and professional practical course)and analyze the construction of BIM curriculum ideology and politics system,the setting of teaching objectives,and the key points of curriculum ideology and politics.
文摘With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.
文摘The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance between regions shorter and shorter.However,the construction of highway engineering is a big project,which not only has a long cycle,but also has a high economic cost.During the construction process,a large number of construction materials and personnel will be applied.If the project cost management is not implemented for the highway construction,it will easily affect the final quality and profit of the entire project.This article expounds the significance of dynamic management and control of highway engineering cost,and analyzes the strategy of dynamic management and control of highway engineering cost.
文摘Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.
文摘Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.
文摘Cost recovery and user satisfaction are among the core objectives of any public or quas-public good provision.Public toilet service provision has been the domain of local government until when liberalisation policies struck the developing south.With stringent condition to reduce the fiscal burden,local government authorities have sought to offload some of its core functions including the management of public toilets to contracted firms.Based on regression and comparative quadrant analysis,this study evaluates cost recovery and user satisfaction in relation to public toilet condition based on a total of 729 user responses and 31 public toilet operators.The observations point to misguided decision to place public toilet management under contracted firms instead of placing then under Public Private Partnership(PPP).The decision to place public toilets management under private contract or individual contract is only secondary to PPP if the focus is to achieve both cost recovery and user satisfaction.However,if the focus was to achieve only cost recovery regardless of the need to protect users,then the decision would have been well founded but can be conspired inappropriate in as long as public toilets remain the domain of public good.
文摘The economic management of colleges and universities has always been a topic of great concern to China’s educational career,therefore,this paper will firstly make the necessary analysis of the current implementation of the economic management of colleges and universities in China,and then the reasons for the problems of economic management of colleges and universities in China is realized a detailed investigation,and finally,the economic management of colleges and universities based on capital and cost management optimization strategy is made a full discussion,looking forward to providing the necessary guidance for researchers in this field.
文摘The issue of water scarcity highlights the importance of watershed management. A sound watershed manage- ment should make all water users share the incurred cost. This study analyzes the optimal allocation of watershed management cost among different water users. As a consumable, water should be allocated to different users the amounts in which their marginal utilities (MUs) or marginal products (MPs) of water are equal. The value of MUs or MPs equals the water price that the watershed manager charges. When water is simultaneously used as consumable and non- consumable, the watershed manager produces the quantity of water in which the sum of MUs and/or MPs for the two types of uses equals the marginal cost of water production. Each water user should share the portion of watershed management cost in the percentage that his MU or MP accounts for the sum of MUs and/or MPs. Thus, the price of consumable water does not equal the marginal cost of water production even if there is no public good.