期刊文献+
共找到8篇文章
< 1 >
每页显示 20 50 100
Quantifying social costs of coal-fired power plant generation
1
作者 Andewi Rokhmawati Agus Sugiyono +1 位作者 Yulia Efni Rendra Wasnury 《Geography and Sustainability》 CSCD 2023年第1期39-48,共10页
Coal has been dominating the electricity supply in Indonesia,especially in long-term power generation from fossil energy.This dominance is due to lower production costs in coal-fired power plant generation.However,thi... Coal has been dominating the electricity supply in Indonesia,especially in long-term power generation from fossil energy.This dominance is due to lower production costs in coal-fired power plant generation.However,this low price is only based on monetary costs and ignores the social costs.Therefore,this study aims to quantify the social costs of coal-fired generation.Using QUERI-AirPacts modeling,the present study quantifies the social costs resulting from the Tenayan Raya coal-fired generation in Riau,Indonesia.It includes the levelized cost of electricity and health costs into the generation costs.After that,this study calculates the net present value,internal rate return,and project payback period.The study found that as much as$50.22/MWh was the levelized cost of electricity.While$15.978/MWh or$0.015978/kWh was the social cost that was not included in the generating cost.At the electricity production level of 1,380,171.69 MWh per year,there is an expected extra cost of$22,052,383.30 uncounted when externalities are included.For instance,the net present value(NPV)is lower and even negative when external costs are included(-$24,062,274.19)compared to$176,108,091.52 when externalities are not considered.The internal rate of return(IRR)is much higher when the social costs are not considered.The payback period is also shorter when the social costs are excluded than when the externalities are included.This global number indicates that the inclusion of external costs would impact NPV,IRR,and the payback period.This result implies that the government should internalize the external cost to stimulate the electricity producers to conduct cost-benefit analyses.The cost-benefit analysis mechanism would lead the producers to be more efficient. 展开更多
关键词 AirPact Coal-fired generation Externality cost Health cost Levelized cost of electricity Social cost
下载PDF
Development modes analysis of renewable energy power generation in North Africa 被引量:5
2
作者 Liang Zhao Ruoying Yu +3 位作者 Zhe Wang Wei Yang Linan Qu Weidong Chen 《Global Energy Interconnection》 2020年第3期237-246,共10页
North African countries generally have strategic demands for energy transformation and sustainable development.Renewable energy development is important to achieve this goal.Considering three typical types of renewabl... North African countries generally have strategic demands for energy transformation and sustainable development.Renewable energy development is important to achieve this goal.Considering three typical types of renewable energies—wind,photovoltaic(PV),and concentrating solar power(CSP)—an optimal planning model is established to minimize construction costs and power curtailment losses.The levelized cost of electricity is used as an index for assessing economic feasibility.In this study,wind and PV,wind/PV/CSP,and transnational interconnection modes are designed for Morocco,Egypt,and Tunisia.The installed capacities of renewable energy power generation are planned through the time sequence production simulation method for each country.The results show that renewable energy combined with power generation,including the CSP mode,can improve reliability of the power supply and reduce the power curtailment rate.The transnational interconnection mode can help realize mutual benefits of renewable energy power,while the apportionment of electricity prices and trading mechanisms are very important and are related to economic feasibility;thus,this mode is important for the future development of renewable energy in North Africa. 展开更多
关键词 North Africa Renewable energy Wind power generation Solar energy generation Transnational interconnection Optimal planning Levelized cost of electricity
下载PDF
Economic Assessment of Standby Diesel Generator for Peak Reduction in Commercial and Industrial Buildings:A Case Study in Malaysia
3
作者 Kein Huat Chua Yun Seng Lim Jee Xiong Chew 《Journal of Electronic Science and Technology》 CAS CSCD 2017年第4期400-406,共7页
This paper outlines the barriers and potential benefits of using standby diesel generators in mitigating the peak demands for commercial and industrial customers. The feasibility of utilizing the standby diesel genera... This paper outlines the barriers and potential benefits of using standby diesel generators in mitigating the peak demands for commercial and industrial customers. The feasibility of utilizing the standby diesel generators to reduce the electricity bills for customers is carried out by using the hybrid optimization model for electric renewable(HOMER)software. The size of the standby diesel generator and its operational duration are determined based on the lowest cost of electricity obtained from the evaluations. The economic assessments demonstrate that there is potential to reduce the electricity bills for commercial and industrial customers under the existing fuel price and tariffs. The commercial customers under the tariff C2 have the highest potential to save their electricity bills with the use of standby diesel generators for peak reduction. This study demonstrates the potential of the standby diesel generators in peak reduction. 展开更多
关键词 Commercial and industrial customers cost of electricity hybrid optimization model for electric renewable(HOMER) peak reduction standby diesel generator
下载PDF
Assessment of the Wind Energy Potential of Two Burundian Sites
4
作者 Mathias Bashahu Pierre Nsabimana +1 位作者 Juvenal Barakamfitiye Fidele Niyukuri 《Energy and Power Engineering》 2022年第5期181-200,共20页
1-year hourly wind speed data from two Burundian stations, namely Bujumbura and Muyinga, have been processed in this work to bring an efficient help for the planning and installation of wind energy conversion systems ... 1-year hourly wind speed data from two Burundian stations, namely Bujumbura and Muyinga, have been processed in this work to bring an efficient help for the planning and installation of wind energy conversion systems (WECS) at those localities. Mean seasonal and diurnal variations of wind direction and wind shear exponent have been derived. Two-parameter Weibull probability density functions (PDFs) fitting the observed monthly and annual wind speed relative frequency distributions have been implemented. As shown through three complementary statistical tests, the fitting technique was very satisfactory. A wind resource analysis at 10 m above ground level (AGL) has led to a mean power density at Bujumbura which is almost thirteen fold higher than at Muyinga. The use of the empirical power law to extrapolate wind characteristics at heights from 150 to 350 m AGL has shown that energy potential of hilltops around Muyinga was only suitable for small, individual scale wind energy applications. At the opposite, wind energy potential of ridge-tops and hilltops around Bujumbura has been found suitable for medium and large scale electricity production. For that locality and at those heights, energy outputs and capacity factors (CF or C<sub>f</sub>) have been computed for ten selected wind turbines (WTs), together with costs of electricity (COE) using the present value of cost (PVC) method. Amongst those WTs, YDF-1500-87 and S95-2.1 MW have emerged as the best options for installation owing to their highest CF and lowest COE. Moreover, an analysis of those two quantities at monthly basis for YDF-1500-87 WT has led to its best performance in the dry season. Compared to the average present COE of household hydroelectricity consumption, results of this study have evidenced economical feasibility and benefit of WECS setting in selected Burundian sites in order to supplement traditional electricity sources. 展开更多
关键词 Wind Shear Exponent Two-Parameter Weibull PDFs Statistical Tests Wind Energy Potential WT’s Energy Output and Capacity Factor cost of electricity Two Burundian Sites
下载PDF
Capacity Configuration of Hybrid CSP/PV Plant for Economical Application of Solar Energy 被引量:4
5
作者 Fei Li Canbing Li +2 位作者 Kai Sun Jiamei Zhang Hua Li 《Chinese Journal of Electrical Engineering》 CSCD 2020年第2期19-29,共11页
Concentrating solar power(CSP)technology has received increasing attention in recent years because of its distinct advantage for dispatchable power generation from solar energy.However,owing to its highly levelized co... Concentrating solar power(CSP)technology has received increasing attention in recent years because of its distinct advantage for dispatchable power generation from solar energy.However,owing to its highly levelized costs of electricity,CSP plants are less competitive than photovoltaic(PV)power plants.To overcome this drawback and suppress PV power fluctuations,the concept of a hybrid CSP/PV power plant is proposed and developed.A capacity configuration method based on filtering and checking is proposed to seek a relationship between the capacity configuration of a hybrid CSP/PV system and the cost of solar energy.Co-content hybrid systems with different ratios of CSP capacity and PV capacity are modeled,and their comprehensive performance is investigated.Simulations and comparisons with a standalone CSP system focused on annual energy generation,capacity factor,levelized cost of electricity,and possibility for loss of power supply show that the hybrid CSP/PV systems possess different features depending on their capacity configurations.The results indicate that the proposed method can supply a convenient and simple operation pattern that favors engineering utilization and extension. 展开更多
关键词 Concentrating solar power PHOTOVOLTAIC capacity configuration levelized cost of electricity
原文传递
Energetic, economic, and environmental analysis of solid oxide fuel cell-based combined cooling, heating, and power system for cancer care hospital 被引量:1
6
作者 Ahmad K.Sleiti Wahib AAl-Ammari +1 位作者 Raiha Arshad Tarek EI Mekkawy 《Building Simulation》 SCIE EI CSCD 2022年第8期1437-1454,共18页
In this study,energetic,economic,and environmental analysis of solid oxide fuel cell-based combined cooling,heating,and power(SOFC-CCHP)system is proposed for a cancer care hospital building.The energy required for th... In this study,energetic,economic,and environmental analysis of solid oxide fuel cell-based combined cooling,heating,and power(SOFC-CCHP)system is proposed for a cancer care hospital building.The energy required for the hospital power,cooling,and heating demands was obtained based on real and detailed field data,which could serve as a reference for future works in the field.These data with a 3D model for the hospital building are constructed and created in eQUEST software to precisely calculate the energy demands of the existing system(baseline case).Then,energetic,economic,and environmental models were developed to compare and assess the performance of the proposed SOFC-CCHP system.The results show that the proposed system can cover about 49% to 77% of the power demand of the hospital with an overall efficiency of 78.3%.Also,the results show that the levelized cost of electricity of the system and its payback period at the designed capacity of the SOFC is 0.087S/kWh and 10 years,respectively.Furthermore,compared to the baseline system of the hospital,the SOFC-CCHP reduces the CO_(2) emission by 89% over the year.The sensitivity analysis showed that a maximum SOFC efficiency of 52%and overall efficiency of 80%are achieved at cell operating temperature of 1027℃ and fuel utilization factor of 0.85. 展开更多
关键词 combined cooling heating and power solid oxide fuel cell hospital power demand CO_(2)emissions levelized cost of electricity(LCOE)
原文传递
Consideration of some optimization techniques to design a hybrid energy system for a building in Cameroon
7
作者 Djeudjo Temene Hermann Talla Konchou Franck Armel +1 位作者 TCHINDA René NJOMO Donatien 《Energy and Built Environment》 2022年第2期233-249,共17页
To solve the problem energy deficit encountered in developing countries,Hybrid Renewable Energy System(HRES)appears to be a very good solution.The paper presents the optimal design of a hybrid renewable energy system ... To solve the problem energy deficit encountered in developing countries,Hybrid Renewable Energy System(HRES)appears to be a very good solution.The paper presents the optimal design of a hybrid renewable energy system considering the technical i.e Loss of Power Supply Probability(LPSP),economic i.e Cost of Electricity(COE)and Net Present Cost(NPC)and environmental i.e Total Greenhouse gases emission(TGE)aspects using Particle Swarm Optimization(PSO),hybrid Particle Swarm Optimization-Grey Wolf Optimization(PSOGWO),hybrid Grey-Wolf Optimization-Cuckoo Search(GWOCS)and Sine-Cosine Algorithm(SCA)for a Community multimedia center in MAKENENE,Cameroon;where inhabitants have to spend at times 3 to 4 days of blackout.Seven configurations(Scenarios)of hybrid energy systems including PV,WT,Battery and Diesel generator are analyzed considering an average daily energy load of 50.22 kWh with a peak load of 5.6 kW.Four values of the derating factor i.e 0.6,0.7,0.8 and 0.9 are used in this analysis and the best value is 0.9.Scenario 3 with LPSP,COE,NPC,TGE and RF of 0.003%,0.15913$/kWh,46953.0485$,2.3406 kg/year and 99.8%respectively when using GWOCS is found to be the most appropriate for the Community multimedia center.The optimal Scenario is obtained for a system comprising of 18 kW of P_(pv-rated)corresponding to 69 solar panels,3 days of AD corresponding to a total battery capacity of 241 kWh and 1 of N_(dg). 展开更多
关键词 Hybrid renewable energy system Optimization Loss of power Supply probability cost of electricity Net present cost Emission of greenhouse gases
原文传递
Techno-economic analysis to develop the first wind farm in the Egyptian western desert at Elkharga Oasis
8
作者 Mohamed A.Abdelrahman Radwan H.Abdel-Hamid +1 位作者 Maged Ahmed Abo Adma Mohamed Daowd 《Clean Energy》 EI 2022年第1期211-225,共15页
During the past few years,Egypt has increased the share of electricity generation from renewable energy sources to achieve the renewable-energy strategy.The Egyptian Ministry of Electricity and Renewable Energy has se... During the past few years,Egypt has increased the share of electricity generation from renewable energy sources to achieve the renewable-energy strategy.The Egyptian Ministry of Electricity and Renewable Energy has set an ambitious target to increase the share of renewable energy among the total energy mix to be 20%by 2022 and 42%by 2035.This target will be achieved using several approved policies such as feed-in tariffs,build-own-operate and independent power producers under a merchant scheme.This paper presents a full analysis of wind-potential characteristics at Elkharga Oasis in Egypt based on an actual wind-measurement campaign taken by a met mast at two height levels of 10 and 25 m,respectively.The measurements show an average annual wind speed of 5.72 m/s at 10-m height and 6.53 m/s at>25-m height.The estimated wind speed,however,is 8.38 m/s at 120 m,which is technically convenient to generate electricity from wind energy.In this paper,the wind potential in the area is assessed using the statistical method of the Weibull probability density function.The different methods to estimate the Weibull distribution parameters are presented and the relevant accuracy is verified based on the root mean square error.A techno-economic assessment and selection of the optimal wind-turbine size with ideal micro-sitings are performed using the software package windPRO.Different cases of study for three typical wind-turbine models with various rotor diameters,power capacity,layout configuration and annual yield are assessed at the site.The selection of the most convenient wind turbine is determined based on the IEC 61400 standard criteria and the turbine that produces the lowest levelized cost of electricity. 展开更多
关键词 wind energy wind-resource assessment Weibull distribution windPRO levelized cost of electricity
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部