Projects delay and cost overrun have become general facts in the construction industry. Project cost risk analysis considers the different costs associated with a project and focuses on the uncertainties and risks tha...Projects delay and cost overrun have become general facts in the construction industry. Project cost risk analysis considers the different costs associated with a project and focuses on the uncertainties and risks that may affect these costs. An implementation of PRM (project risk management) process on regional construction project has been carried out to maximize the likelihood of project meeting its objectives within its constraints. Qualitative and quantitative risk analyses have been carried out. The qualitative analysis is presented in a table that shows top ranked risks in Libyan construction projects based on probability-impact grid technique. In quantitative risk analyses, Mont Carlo simulation technique has been conducted to quantify and evaluate the overall level of risk exposure associated with the project completion cost. A project simulation uses a model that translates cost uncertainties into their potential impact on project objectives. A frequency curve model that represents simulation results of project completion costs has been constructed. The frequency curve model shows all possible outcomes of expected project cost at different probabilities. Project manager or decision maker can select the appropriate project budget. If a probability of 0.95 confident project budget is selected that means cost overrun risk can be minimized to a probability of 0.05. It is very helpful for project manager to take decisions based on information that shows project completion cost and its associated probability rather than usin single information of estimated cost.展开更多
Background: Kidney (renal) diseases and dialysis are among the most costly disorders and represent a worldwide burden. In this study, we evaluate the medical costs for individuals with kidney diseases and risk factors...Background: Kidney (renal) diseases and dialysis are among the most costly disorders and represent a worldwide burden. In this study, we evaluate the medical costs for individuals with kidney diseases and risk factors for the diseases in Japan. Data and Methods: The dataset used contained 113,979 medical checkups and 3,172,066 medical cost records obtained from 48,022 individuals in one health insurance society. The sample period was April 2013 to March 2016. We evaluated the distribution of all medical costs, and those of kidney diseases specifically. Then the power transformation Tobit model was used to remove the effects of other variables. Finally, a probit analysis was used to analyze the risk factors. Results: In 0.25% of all cases, individuals were diagnosed with kidney diseases. An individual with kidney disease cost 14.5 times more than those without kidney disease. If the diseases progressed into chronic kidney disease (CKD), the medical costs increased substantially. Even disregarding various characteristics of individuals, this conclusion did not vary. We found important risk factors included diabetes and blood pressure problems. In particular, an individual with both factors had a high probability of developing kidney disease. Conclusion: Kidney diseases are much costlier than other diseases. Screening high-risk individuals, educating patients, and ensuring that treatment begins at an early stage are critically important to controlling medical costs. Limitations: The dataset was observatory, and the sample period was only 3 years.展开更多
Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the c...Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the common cost overrun of projects, and the risk factors of it is different in the different countries, different stages and projects types. So in this paper, we generate an evaluation index system of highway construction projects cost overrun risk in Vietnam in the perspective of different project participants, and also evaluate the effects of these factors in method of regression analysis. The empirical results confirmed 7 main factors that have aggravated cost overrun risk in construction stages, e.g. survey and design scheme risk. In final, the corresponding suggestions are proposed to reduce the project cost overrun risk.展开更多
With the implementation of the policy of popularization of education, rural families make the choice of interests and behavior decisions through the calculation of their own benefits and costs, and gradually become th...With the implementation of the policy of popularization of education, rural families make the choice of interests and behavior decisions through the calculation of their own benefits and costs, and gradually become the main body of rural education investment decisions. The relationship between educational cost and income plays a major role in the rural family education investment. Based on the current situation of rural education in our country, this paper focuses on the risk of rural education investment and rural education costs and benefits, and then puts forward scientific, operational measures and suggestions.展开更多
This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed acco...This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.展开更多
A complete research of seismic risk assessment is presented herein focused on the existing build- ings of the extended urban region of Athens in Greece. The seismic risk assessment is fulfilled by discriminating the c...A complete research of seismic risk assessment is presented herein focused on the existing build- ings of the extended urban region of Athens in Greece. The seismic risk assessment is fulfilled by discriminating the current study in two approaches, probable and actual, conducting afterwards between them a comparison analysis. In the first part, a pilot methodology is developed for the seismic loss assessment in monetary terms regarding the buildings damages, consistent with the National Programme for Earthquake Management of Existing Buildings (NPEMEB). The building stock consists of typical building types of Southern Europe and refers to 750,085 buildings (18.80% of buildings in Greece) situated in the entire region of Athens according to the results of the 2000-1 statistical census. A wider research of seismic risk assessment could include direct losses of infrastructures and indirect economic losses. The evaluation of loss due to building damage in a certain region requires an assessment of both seismic hazard and vulnerability of the building stock in the study area. Four different existing damage scenarios are applied for the vulnerability assessment. The results of the seismic risk assessment for the four different aspects of the es- timated damage and the different soil conditions are presented in a map of the study region. The existing vulnerability curves corresponding to defined types of buildings have been derived from the National Technical Chamber of Greece and also from recently developed DPMs. The last DPMs were obtained in a previous research (Eleftheriadou, 2009) from the process of a created damage database after the 7th of September 1999 Parnitha’s earthquake and comprised 180,945 buildings which developed damage of varying degree, type and extent. In the second part of the research, the seismic risk is evaluated from the available data regarding the mean statistical repair/ strengthening or replacement cost for the total number of damaged structures (180,427 buildings) after the same (1999 Parnitha’s) seismic event. Data regarding the compatible (budget approved according to the ministry’s provisions) repair cost has been collected. The structural losses in monetary terms for the 180,427 buildings damaged structures are evaluated equal to 2450.0 Μ€, 1887.8 Μ€ and 2118.9 Μ€ based on the previously mentioned statistical seismic risk data. The statistically derived repair cost for Attica is compared with the results of the economic loss esti- mation for buildings using the aforementioned risk assessment methodology. From the analysis results, the seismic scenario based on the recently developed DPMs (Eleftheriadou, 2009) pre- sented the better correlation (2627.77 M€) with the total statistically evaluated repair cost (2450.02 M€). It is important to stress that the inclusion of the coefficient parameter S overes- timates significantly the seismic losses. The last result should be taken into consideration in future risk researches. The comparison of the estimated economic loss with the statistical repair cost calibrates the reliability of the commonly used risk assessment method and serves in the im- provement of seismic security prioritizing the criteria for seismic rehabilitation programmes of existing buildings.展开更多
Coronary artery disease(CAD) screening and diagnosis are core cardiac specialty services.From symptoms,autopsy correlations supported reductions in coronary blood flow and dynamic epicardial and microcirculatory coron...Coronary artery disease(CAD) screening and diagnosis are core cardiac specialty services.From symptoms,autopsy correlations supported reductions in coronary blood flow and dynamic epicardial and microcirculatory coronaries artery disease as etiologies.While angina remains a clinical diagnosis,most cases require correlation with a diagnostic modality.At the onset of the evidence building process much research,now factored into guidelines were conducted among population and demographics that were homogenous and often prior to newer technologies being available.Today we see a more diverse multi-ethnic population whose characteristics and risks may not consistently match the populations from which guideline evidence is derived.While it would seem veryunlikely that for the majority,scientific arguments against guidelines would differ,however from a translational perspective,there will be populations who differ and importantly there are cost-efficacy questions,e.g.,the most suitable first-line tests or what parameters equate to an adequate test.This article reviews non-invasive diagnosis of CAD within the context of multi-ethnic patient populations.展开更多
In the context of globalization and digitalization, the application of transaction cost theory in supply chain management has become increasingly important. As business environments grow more complex, enterprises face...In the context of globalization and digitalization, the application of transaction cost theory in supply chain management has become increasingly important. As business environments grow more complex, enterprises face challenges in effectively managing supply chain transaction costs. This paper systematically explores the application of transaction cost theory in supply chain management, covering key areas such as supplier selection, supply chain integration, and risk management. The research finds that supplier evaluation models based on transaction costs can help enterprises make more comprehensive selection decisions. In terms of supply chain integration, transaction cost theory provides important guidance for vertical integration decisions and the design of collaboration mechanisms. The application of digital technologies has both reduced traditional transaction costs and introduced new cost considerations. Faced with emerging risks such as cybersecurity and geopolitical issues, enterprises need to adopt dynamic transaction cost management strategies. In the future, the application of transaction cost theory in supply chain management will likely place greater emphasis on interdisciplinary integration and sustainable development, providing theoretical support for enterprises to achieve efficient, flexible, and sustainable supply chain management in the changing global business environment.展开更多
International shipping market is a risky market associated with a variety of risks which shipping companies have to cope with. International shipping has been seriously hit by the financial crisis in 2008. Since then,...International shipping market is a risky market associated with a variety of risks which shipping companies have to cope with. International shipping has been seriously hit by the financial crisis in 2008. Since then, this industry has experienced market downturn for a long period which was considered to be the longest period of depression in the history. This paper mainly focuses on the key market risks in international shipping including cyclical fluctuation risk, cost risk, freight rate volatility risk, and competition risk. It analyses the source of these market risks, and identifies some strategies to cope with these market risks. In the meantime, Maersk and China Ocean Shipping Group (COSCO), the world leading international shipping companies, are taken as two cases. Their strategies in market risk management are analyzed, which enable the reader to learn from their success and failure. Based on the international experience in market risk management in shipping industry as well as the real practice of Maersk and COSCO, this paper provides useful guidance for shipping companies to reduce market risks, overcome market downturn, and improve competitiveness.展开更多
Construction project scheduling is one of the most critical factors for project success measurement.Not only for the project planning but for construction process management,the scheduling is the basic tool for commun...Construction project scheduling is one of the most critical factors for project success measurement.Not only for the project planning but for construction process management,the scheduling is the basic tool for communication between the owner and the project manager.By developing the schedule before the project starts,the owner knows in advance that the expected timeline of the project.By preparing construction process scheduling,the owner and general contractor can better manage the subcontractors,sub-trades progress,materials storage and deliveries,labors schedule and equipment set up which will eventually save time,money and hassle.Basically,Critical Path Method(CPM) is commonly used in the construction industry.CPM is a deterministic method that assumes that through the network,there is at least one path that determines the project duration and that the path is the critical path.CPM does not consider the uncertainty in the activities;rather it assumes that each activity can be finished in the given situation.Program Evaluation and Review Technique(PERT) is a stochastic technique which is based on the assumption that the duration of a single activity can be described by a probability density function.PERT takes into account the uncertainty during the construction process and has been created out of the need to plan,schedule and control complex projects with many uncertainties.The PERT approach is stated in some books and papers,but there is no deep investigation on the application in the schedule risk assessment.This paper investigates the PERT work process and takes a valuable try on the construction schedule risk assessment by using case studies.The utilization in the estimate the construction liquidated damage with the uncertainties is performed,which also can be used in the insurance company to calculate the insurance premium.展开更多
Engineering designs for mountainous highways emphasize compliance checking to ensure safety. However, relying solely on compliance checking may lead designers to minimize costs at the expense of high risk indicators, ...Engineering designs for mountainous highways emphasize compliance checking to ensure safety. However, relying solely on compliance checking may lead designers to minimize costs at the expense of high risk indicators, since the overall risk level of the highway design is unknown to the designers. This paper describes a method for the simultaneous consideration of traffic safety risks and the associated cost burden related to the appropriate planning and design of a mountainous highway. The method can be carried out in four steps: First, the highway design is represented by a new parametric framework to extract the key design variables that affect not only the life-cycle cost but also the operational safety. Second, the relationship between the life-cycle cost and the operational safety risk factors is established in the cost-estimation functions. Third, a fault tree analysis (FTA) is introduced to identify the traffic risk factors from the design variables. The safety performance of the design solutions is also assessed by the generalized linear-regression model. Fourth, a theory of acceptable risk analysis is introduced to the traffic safety assessment, and a computing algorithm is proposed to solve for a cost-efficient optimal solution within the range of acceptable risk, in order to help decision-makers. This approach was applied and examined in the Sichuan–Tibet Highway engineering project, which is located in a complex area with a large elevation gradient and a wide range of mountains. The experimental results show that the proposed approach significantly improved both the safety and cost performance of the project in the study area.展开更多
Various structures such as marine structures age over time. In order to always maintain safety conditions, maintenance processes including inspection and repair should be implemented on them. Corrosion and fatigue cra...Various structures such as marine structures age over time. In order to always maintain safety conditions, maintenance processes including inspection and repair should be implemented on them. Corrosion and fatigue cracks are two main factors that reduce the ultimate strength of the ship's hull girder over time and thus increase the probability and risk of failure. At the time of inspection,the structural conditions must be checked so that, if necessary, the required repairs can be done on it. The main objective of this paper is to provide optimized maintenance plans of the ship structure based on probabilistic concepts with regard to corrosion and fatigue cracks. Maintenance activities increase the operational costs of ships; therefore, it is advisable to inspect and repair in the optimal times. Optimal maintenance planning of the ship structure can be conducted by formulating and solving a multi-objective optimization problem. The use of risk as a structural performance indicator has become more common in recent years. The objective functions of the optimization problem include minimizing the structure's lifecycle maintenance costs, including inspection and repair costs, and also minimizing the maximum risk of structural failure during the ship's life. In the following,to achieve better responses, reliability index has been added to the problem as the third objective function. The multi-objective optimization problem is solved using genetic algorithms. The proposed risk-based approach is applied to the hull structure of a tanker ship.展开更多
This paper conducts a survey of 237 rural households in Zhangjiagang City,identifies farmers' risk attitude through ELCE method and problem design and empirically studies the relationship between risk attitudes an...This paper conducts a survey of 237 rural households in Zhangjiagang City,identifies farmers' risk attitude through ELCE method and problem design and empirically studies the relationship between risk attitudes and credit rationing by utilizing Probit and Logit model. The results show that farmers' risk attitude and credit rationing are in a significant positive correlation. The stronger farmers' risk aversion is,the more serious the demanded credit rationing becomes. Such risk attitude determines the risk cost and risk premium,thus affecting the credit behavior and credit rationing degree. In addition,distance between farmers' residence far the city and their land amount have a positive significant influence on credit rationing,while farmers' education level,income,family labor force have a negative significant effect on credit rationing. Based on these findings,the paper further analyzes the relationship between farmers' credit using and credit rationing as to farmers with different risk attitudes. Measures to relieve the farmer's credit rationing must be taken from government,financial institutions and farmers,respectively.展开更多
In 2012, genetically engineered (GE) crops were grown by 17.3 million farmers on over 170 million hectares. Over 70% of harvested GE biomass is fed to food producing animals, making them the major consumers of GE cr...In 2012, genetically engineered (GE) crops were grown by 17.3 million farmers on over 170 million hectares. Over 70% of harvested GE biomass is fed to food producing animals, making them the major consumers of GE crops for the past 15 plus years. Prior to commercialization, GE crops go through an extensive regulatory evaluation. Over one hundred regulatory submissions have shown compositional equivalence, and comparable levels of safety, between GE crops and their conventional counterparts. One component of regulatory compliance is whole GE food/feed animal feeding studies. Both regulatory studies and independent peer-reviewed studies have shown that GE crops can be safely used in animal feed, and rDNA fragments have never been detected in products (e.g. milk, meat, eggs) derived from animals that consumed GE feed. Despite the fact that the scientific weight of evidence from these hundreds of studies have not revealed unique risks associated with GE feed, some groups are calling for more animal feeding studies, including long-term rodent studies and studies in target livestock species for the approval of GE crops. It is an opportune time to review the results of such studies as have been done to date to evaluate the value of the additional information obtained. Requiring long-term and target animal feeding studies would sharply increase regulatory compliance costs and prolong the regulatory process associated with the commercialization of GE crops. Such costs may impede the development of feed crops with enhanced nutritional characteristics and durability, particularly in the local varieties in small and poor developing countries. More generally it is time for regulatory evaluations to more explicitly consider both the reasonable and unique risks and benefits associated with the use of both GE plants and animals in agricultural systems, and weigh them against those associated with existing systems, and those of regulatory inaction. This would represent a shift away from a GE evaluation process that currently focuses only on risk assessment and identifying ever diminishing marginal hazards, to a regulatory approach that more objectively evaluates and communicates the likely impact of approving a new GE plant or animal on agricultural production systems.展开更多
文摘Projects delay and cost overrun have become general facts in the construction industry. Project cost risk analysis considers the different costs associated with a project and focuses on the uncertainties and risks that may affect these costs. An implementation of PRM (project risk management) process on regional construction project has been carried out to maximize the likelihood of project meeting its objectives within its constraints. Qualitative and quantitative risk analyses have been carried out. The qualitative analysis is presented in a table that shows top ranked risks in Libyan construction projects based on probability-impact grid technique. In quantitative risk analyses, Mont Carlo simulation technique has been conducted to quantify and evaluate the overall level of risk exposure associated with the project completion cost. A project simulation uses a model that translates cost uncertainties into their potential impact on project objectives. A frequency curve model that represents simulation results of project completion costs has been constructed. The frequency curve model shows all possible outcomes of expected project cost at different probabilities. Project manager or decision maker can select the appropriate project budget. If a probability of 0.95 confident project budget is selected that means cost overrun risk can be minimized to a probability of 0.05. It is very helpful for project manager to take decisions based on information that shows project completion cost and its associated probability rather than usin single information of estimated cost.
文摘Background: Kidney (renal) diseases and dialysis are among the most costly disorders and represent a worldwide burden. In this study, we evaluate the medical costs for individuals with kidney diseases and risk factors for the diseases in Japan. Data and Methods: The dataset used contained 113,979 medical checkups and 3,172,066 medical cost records obtained from 48,022 individuals in one health insurance society. The sample period was April 2013 to March 2016. We evaluated the distribution of all medical costs, and those of kidney diseases specifically. Then the power transformation Tobit model was used to remove the effects of other variables. Finally, a probit analysis was used to analyze the risk factors. Results: In 0.25% of all cases, individuals were diagnosed with kidney diseases. An individual with kidney disease cost 14.5 times more than those without kidney disease. If the diseases progressed into chronic kidney disease (CKD), the medical costs increased substantially. Even disregarding various characteristics of individuals, this conclusion did not vary. We found important risk factors included diabetes and blood pressure problems. In particular, an individual with both factors had a high probability of developing kidney disease. Conclusion: Kidney diseases are much costlier than other diseases. Screening high-risk individuals, educating patients, and ensuring that treatment begins at an early stage are critically important to controlling medical costs. Limitations: The dataset was observatory, and the sample period was only 3 years.
文摘Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the common cost overrun of projects, and the risk factors of it is different in the different countries, different stages and projects types. So in this paper, we generate an evaluation index system of highway construction projects cost overrun risk in Vietnam in the perspective of different project participants, and also evaluate the effects of these factors in method of regression analysis. The empirical results confirmed 7 main factors that have aggravated cost overrun risk in construction stages, e.g. survey and design scheme risk. In final, the corresponding suggestions are proposed to reduce the project cost overrun risk.
文摘With the implementation of the policy of popularization of education, rural families make the choice of interests and behavior decisions through the calculation of their own benefits and costs, and gradually become the main body of rural education investment decisions. The relationship between educational cost and income plays a major role in the rural family education investment. Based on the current situation of rural education in our country, this paper focuses on the risk of rural education investment and rural education costs and benefits, and then puts forward scientific, operational measures and suggestions.
基金the Mine Planning Research Group–GIPLAMIN-of the Mines Faculty,National University of Colombia
文摘This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.
文摘A complete research of seismic risk assessment is presented herein focused on the existing build- ings of the extended urban region of Athens in Greece. The seismic risk assessment is fulfilled by discriminating the current study in two approaches, probable and actual, conducting afterwards between them a comparison analysis. In the first part, a pilot methodology is developed for the seismic loss assessment in monetary terms regarding the buildings damages, consistent with the National Programme for Earthquake Management of Existing Buildings (NPEMEB). The building stock consists of typical building types of Southern Europe and refers to 750,085 buildings (18.80% of buildings in Greece) situated in the entire region of Athens according to the results of the 2000-1 statistical census. A wider research of seismic risk assessment could include direct losses of infrastructures and indirect economic losses. The evaluation of loss due to building damage in a certain region requires an assessment of both seismic hazard and vulnerability of the building stock in the study area. Four different existing damage scenarios are applied for the vulnerability assessment. The results of the seismic risk assessment for the four different aspects of the es- timated damage and the different soil conditions are presented in a map of the study region. The existing vulnerability curves corresponding to defined types of buildings have been derived from the National Technical Chamber of Greece and also from recently developed DPMs. The last DPMs were obtained in a previous research (Eleftheriadou, 2009) from the process of a created damage database after the 7th of September 1999 Parnitha’s earthquake and comprised 180,945 buildings which developed damage of varying degree, type and extent. In the second part of the research, the seismic risk is evaluated from the available data regarding the mean statistical repair/ strengthening or replacement cost for the total number of damaged structures (180,427 buildings) after the same (1999 Parnitha’s) seismic event. Data regarding the compatible (budget approved according to the ministry’s provisions) repair cost has been collected. The structural losses in monetary terms for the 180,427 buildings damaged structures are evaluated equal to 2450.0 Μ€, 1887.8 Μ€ and 2118.9 Μ€ based on the previously mentioned statistical seismic risk data. The statistically derived repair cost for Attica is compared with the results of the economic loss esti- mation for buildings using the aforementioned risk assessment methodology. From the analysis results, the seismic scenario based on the recently developed DPMs (Eleftheriadou, 2009) pre- sented the better correlation (2627.77 M€) with the total statistically evaluated repair cost (2450.02 M€). It is important to stress that the inclusion of the coefficient parameter S overes- timates significantly the seismic losses. The last result should be taken into consideration in future risk researches. The comparison of the estimated economic loss with the statistical repair cost calibrates the reliability of the commonly used risk assessment method and serves in the im- provement of seismic security prioritizing the criteria for seismic rehabilitation programmes of existing buildings.
文摘Coronary artery disease(CAD) screening and diagnosis are core cardiac specialty services.From symptoms,autopsy correlations supported reductions in coronary blood flow and dynamic epicardial and microcirculatory coronaries artery disease as etiologies.While angina remains a clinical diagnosis,most cases require correlation with a diagnostic modality.At the onset of the evidence building process much research,now factored into guidelines were conducted among population and demographics that were homogenous and often prior to newer technologies being available.Today we see a more diverse multi-ethnic population whose characteristics and risks may not consistently match the populations from which guideline evidence is derived.While it would seem veryunlikely that for the majority,scientific arguments against guidelines would differ,however from a translational perspective,there will be populations who differ and importantly there are cost-efficacy questions,e.g.,the most suitable first-line tests or what parameters equate to an adequate test.This article reviews non-invasive diagnosis of CAD within the context of multi-ethnic patient populations.
文摘In the context of globalization and digitalization, the application of transaction cost theory in supply chain management has become increasingly important. As business environments grow more complex, enterprises face challenges in effectively managing supply chain transaction costs. This paper systematically explores the application of transaction cost theory in supply chain management, covering key areas such as supplier selection, supply chain integration, and risk management. The research finds that supplier evaluation models based on transaction costs can help enterprises make more comprehensive selection decisions. In terms of supply chain integration, transaction cost theory provides important guidance for vertical integration decisions and the design of collaboration mechanisms. The application of digital technologies has both reduced traditional transaction costs and introduced new cost considerations. Faced with emerging risks such as cybersecurity and geopolitical issues, enterprises need to adopt dynamic transaction cost management strategies. In the future, the application of transaction cost theory in supply chain management will likely place greater emphasis on interdisciplinary integration and sustainable development, providing theoretical support for enterprises to achieve efficient, flexible, and sustainable supply chain management in the changing global business environment.
文摘International shipping market is a risky market associated with a variety of risks which shipping companies have to cope with. International shipping has been seriously hit by the financial crisis in 2008. Since then, this industry has experienced market downturn for a long period which was considered to be the longest period of depression in the history. This paper mainly focuses on the key market risks in international shipping including cyclical fluctuation risk, cost risk, freight rate volatility risk, and competition risk. It analyses the source of these market risks, and identifies some strategies to cope with these market risks. In the meantime, Maersk and China Ocean Shipping Group (COSCO), the world leading international shipping companies, are taken as two cases. Their strategies in market risk management are analyzed, which enable the reader to learn from their success and failure. Based on the international experience in market risk management in shipping industry as well as the real practice of Maersk and COSCO, this paper provides useful guidance for shipping companies to reduce market risks, overcome market downturn, and improve competitiveness.
文摘Construction project scheduling is one of the most critical factors for project success measurement.Not only for the project planning but for construction process management,the scheduling is the basic tool for communication between the owner and the project manager.By developing the schedule before the project starts,the owner knows in advance that the expected timeline of the project.By preparing construction process scheduling,the owner and general contractor can better manage the subcontractors,sub-trades progress,materials storage and deliveries,labors schedule and equipment set up which will eventually save time,money and hassle.Basically,Critical Path Method(CPM) is commonly used in the construction industry.CPM is a deterministic method that assumes that through the network,there is at least one path that determines the project duration and that the path is the critical path.CPM does not consider the uncertainty in the activities;rather it assumes that each activity can be finished in the given situation.Program Evaluation and Review Technique(PERT) is a stochastic technique which is based on the assumption that the duration of a single activity can be described by a probability density function.PERT takes into account the uncertainty during the construction process and has been created out of the need to plan,schedule and control complex projects with many uncertainties.The PERT approach is stated in some books and papers,but there is no deep investigation on the application in the schedule risk assessment.This paper investigates the PERT work process and takes a valuable try on the construction schedule risk assessment by using case studies.The utilization in the estimate the construction liquidated damage with the uncertainties is performed,which also can be used in the insurance company to calculate the insurance premium.
基金the National Natural Science Foundation of China (71732001, 51878311, and 51678265)the Research Project of the Chinese Academy of Engineering (2017-XZ-12).
文摘Engineering designs for mountainous highways emphasize compliance checking to ensure safety. However, relying solely on compliance checking may lead designers to minimize costs at the expense of high risk indicators, since the overall risk level of the highway design is unknown to the designers. This paper describes a method for the simultaneous consideration of traffic safety risks and the associated cost burden related to the appropriate planning and design of a mountainous highway. The method can be carried out in four steps: First, the highway design is represented by a new parametric framework to extract the key design variables that affect not only the life-cycle cost but also the operational safety. Second, the relationship between the life-cycle cost and the operational safety risk factors is established in the cost-estimation functions. Third, a fault tree analysis (FTA) is introduced to identify the traffic risk factors from the design variables. The safety performance of the design solutions is also assessed by the generalized linear-regression model. Fourth, a theory of acceptable risk analysis is introduced to the traffic safety assessment, and a computing algorithm is proposed to solve for a cost-efficient optimal solution within the range of acceptable risk, in order to help decision-makers. This approach was applied and examined in the Sichuan–Tibet Highway engineering project, which is located in a complex area with a large elevation gradient and a wide range of mountains. The experimental results show that the proposed approach significantly improved both the safety and cost performance of the project in the study area.
文摘Various structures such as marine structures age over time. In order to always maintain safety conditions, maintenance processes including inspection and repair should be implemented on them. Corrosion and fatigue cracks are two main factors that reduce the ultimate strength of the ship's hull girder over time and thus increase the probability and risk of failure. At the time of inspection,the structural conditions must be checked so that, if necessary, the required repairs can be done on it. The main objective of this paper is to provide optimized maintenance plans of the ship structure based on probabilistic concepts with regard to corrosion and fatigue cracks. Maintenance activities increase the operational costs of ships; therefore, it is advisable to inspect and repair in the optimal times. Optimal maintenance planning of the ship structure can be conducted by formulating and solving a multi-objective optimization problem. The use of risk as a structural performance indicator has become more common in recent years. The objective functions of the optimization problem include minimizing the structure's lifecycle maintenance costs, including inspection and repair costs, and also minimizing the maximum risk of structural failure during the ship's life. In the following,to achieve better responses, reliability index has been added to the problem as the third objective function. The multi-objective optimization problem is solved using genetic algorithms. The proposed risk-based approach is applied to the hull structure of a tanker ship.
基金Supported by Humanities and Social Sciences Project for Western and Frontier Areas,the Ministry of Education(11XJC790007)Fundamental Research Fund for Central Universities,Southwest University(SWU1309229)+1 种基金Science and Technology Innovation Fund of Shizhu Base,Southwest University(Sz201108)Business Management Cultivation Discipline Project,Southwest University Rongchang Campus(Rcqg207001)
文摘This paper conducts a survey of 237 rural households in Zhangjiagang City,identifies farmers' risk attitude through ELCE method and problem design and empirically studies the relationship between risk attitudes and credit rationing by utilizing Probit and Logit model. The results show that farmers' risk attitude and credit rationing are in a significant positive correlation. The stronger farmers' risk aversion is,the more serious the demanded credit rationing becomes. Such risk attitude determines the risk cost and risk premium,thus affecting the credit behavior and credit rationing degree. In addition,distance between farmers' residence far the city and their land amount have a positive significant influence on credit rationing,while farmers' education level,income,family labor force have a negative significant effect on credit rationing. Based on these findings,the paper further analyzes the relationship between farmers' credit using and credit rationing as to farmers with different risk attitudes. Measures to relieve the farmer's credit rationing must be taken from government,financial institutions and farmers,respectively.
基金support from National Research Initiative Competitive Grant no.2009-55205-05057Agriculture and Food Research Initiative Competitive Grant no.2011-68004-30367 and 2013-68004-20364 from the USDA National Institute of Food and Agriculturesupported by funds from the W.K.Kellogg endowment to the UC Davis Department of Animal Science
文摘In 2012, genetically engineered (GE) crops were grown by 17.3 million farmers on over 170 million hectares. Over 70% of harvested GE biomass is fed to food producing animals, making them the major consumers of GE crops for the past 15 plus years. Prior to commercialization, GE crops go through an extensive regulatory evaluation. Over one hundred regulatory submissions have shown compositional equivalence, and comparable levels of safety, between GE crops and their conventional counterparts. One component of regulatory compliance is whole GE food/feed animal feeding studies. Both regulatory studies and independent peer-reviewed studies have shown that GE crops can be safely used in animal feed, and rDNA fragments have never been detected in products (e.g. milk, meat, eggs) derived from animals that consumed GE feed. Despite the fact that the scientific weight of evidence from these hundreds of studies have not revealed unique risks associated with GE feed, some groups are calling for more animal feeding studies, including long-term rodent studies and studies in target livestock species for the approval of GE crops. It is an opportune time to review the results of such studies as have been done to date to evaluate the value of the additional information obtained. Requiring long-term and target animal feeding studies would sharply increase regulatory compliance costs and prolong the regulatory process associated with the commercialization of GE crops. Such costs may impede the development of feed crops with enhanced nutritional characteristics and durability, particularly in the local varieties in small and poor developing countries. More generally it is time for regulatory evaluations to more explicitly consider both the reasonable and unique risks and benefits associated with the use of both GE plants and animals in agricultural systems, and weigh them against those associated with existing systems, and those of regulatory inaction. This would represent a shift away from a GE evaluation process that currently focuses only on risk assessment and identifying ever diminishing marginal hazards, to a regulatory approach that more objectively evaluates and communicates the likely impact of approving a new GE plant or animal on agricultural production systems.