According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
We revisit the classical problem of granular hopping conduction's σ∝exp[-(To/T)1/2] temperature dependence, where a denotes conductivity, T is temperature, and To is a sample-dependent constant. By using the hopp...We revisit the classical problem of granular hopping conduction's σ∝exp[-(To/T)1/2] temperature dependence, where a denotes conductivity, T is temperature, and To is a sample-dependent constant. By using the hopping conduction formulation in conjunction with the incorporation of the random potential that has been shown to exist in insulator-conductor composites, it is demonstrated that the widely observed temperature dependence of granular hopping conduction emerges very naturally through the immediate-neighbor critical-path argument. Here, immediate-neighbor pairs are defined to be those where a line connecting two grains does not cross or by-pass other grains, and the critical-path argument denotes the derivation of sample conductance based on the geometric percolation condition that is marked by the critical conduction path in a random granular composite. Simulations based on the exact electrical network evaluation of finite-sample conductance show that the configuration- averaged results agree well with those obtained using the immediate-neighbor critical-path method. Furthermore, the results obtained using both these methods show good agreement with experimental data on hopping conduction in a sputtered metal-insulator composite Agx(SnO2)1-x, where x denotes the metal volume fraction. The present approach offers a relatively straightforward and simple expla- nation for the temperature behavior that has been widely observed over diverse material systems, but which has remained a puzzle in spite of the various efforts made to explain this phenomenon.展开更多
This paper reviewed the concepts of Project Evaluation Review Technique and<span style="font-family:Verdana;"> Critical Path Method in project management with practical examples. The methods and succes...This paper reviewed the concepts of Project Evaluation Review Technique and<span style="font-family:Verdana;"> Critical Path Method in project management with practical examples. The methods and success of quantitative decision-making approaches in project management through t</span><span style="font-family:Verdana;">he use of project evaluation review technique and the critical path method as regards project duration and critical activities of a project, were discussed. The review found that while both methods are effective in achieving success in project management, the relationship and connectivity of activities involved in a project life cycle are key aspects. The paper concludes that the project evaluation review technique is more effective when the duration of the project is uncertain, while the critical path method is effective when the project’s end time is certain. The paper, therefore, recommends that to achieve maximum operative efficiency in utilizing resources in project management, p</span><span style="font-family:Verdana;">rior to commencing the execution of a project, all required resources to cover every activity must be assembled and prioritized to eliminate interruptions that could bring delay and unnecessary cost implications. Again, policies focused on improving project execution should be implemented in developing nations to minimize the many cases of failed and delayed projects. Subsequently, stakeholders in projects must be given the right, under the law, to prosecute the government, its agencies and/or the executors of projects for failure to execute a project on schedule.</span>展开更多
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,
文摘We revisit the classical problem of granular hopping conduction's σ∝exp[-(To/T)1/2] temperature dependence, where a denotes conductivity, T is temperature, and To is a sample-dependent constant. By using the hopping conduction formulation in conjunction with the incorporation of the random potential that has been shown to exist in insulator-conductor composites, it is demonstrated that the widely observed temperature dependence of granular hopping conduction emerges very naturally through the immediate-neighbor critical-path argument. Here, immediate-neighbor pairs are defined to be those where a line connecting two grains does not cross or by-pass other grains, and the critical-path argument denotes the derivation of sample conductance based on the geometric percolation condition that is marked by the critical conduction path in a random granular composite. Simulations based on the exact electrical network evaluation of finite-sample conductance show that the configuration- averaged results agree well with those obtained using the immediate-neighbor critical-path method. Furthermore, the results obtained using both these methods show good agreement with experimental data on hopping conduction in a sputtered metal-insulator composite Agx(SnO2)1-x, where x denotes the metal volume fraction. The present approach offers a relatively straightforward and simple expla- nation for the temperature behavior that has been widely observed over diverse material systems, but which has remained a puzzle in spite of the various efforts made to explain this phenomenon.
文摘This paper reviewed the concepts of Project Evaluation Review Technique and<span style="font-family:Verdana;"> Critical Path Method in project management with practical examples. The methods and success of quantitative decision-making approaches in project management through t</span><span style="font-family:Verdana;">he use of project evaluation review technique and the critical path method as regards project duration and critical activities of a project, were discussed. The review found that while both methods are effective in achieving success in project management, the relationship and connectivity of activities involved in a project life cycle are key aspects. The paper concludes that the project evaluation review technique is more effective when the duration of the project is uncertain, while the critical path method is effective when the project’s end time is certain. The paper, therefore, recommends that to achieve maximum operative efficiency in utilizing resources in project management, p</span><span style="font-family:Verdana;">rior to commencing the execution of a project, all required resources to cover every activity must be assembled and prioritized to eliminate interruptions that could bring delay and unnecessary cost implications. Again, policies focused on improving project execution should be implemented in developing nations to minimize the many cases of failed and delayed projects. Subsequently, stakeholders in projects must be given the right, under the law, to prosecute the government, its agencies and/or the executors of projects for failure to execute a project on schedule.</span>