The amount of solar PV installed capacity has steadily increased to 44.5 GW at the end of FY2017,since the introduction of the Feed in Tariff(FiT)to Japan in 2012.On the other hand,since the first curtailment of solar...The amount of solar PV installed capacity has steadily increased to 44.5 GW at the end of FY2017,since the introduction of the Feed in Tariff(FiT)to Japan in 2012.On the other hand,since the first curtailment of solar PV was conducted on October 13th,2018 in the Kyushu area,the curtailment has been frequently executed including wind power after that.In this study,cross-regional interconnector and pumped hydro energy storage(PHES)are focused on mitigating curtailment.In Japan,there are 9 electric power areas which connected each other by cross-regional interconnectors.According to the historical operation,cross-regional interconnectors were secured as emergency flexible measures,but after the implicit auction was started from October 2018,it is used on merit order.Regarding a PHES in Japan,they have been built with nuclear power plants for several decades.Because the output of nuclear power generation is constant,so the PHES is used to absorb the surplus at nighttime when the demand declines.All nuclear power plants in Japan have been shut down after the accident at the Fukushima Daiichi Nuclear Power Plant following the Great East Japan Earthquake that occurred on March 11th,2011.There are several nuclear power plants that have been restarted(9 reactors,as of August 2019).In this study,the amount of curtailment for solar PV in the Kyushu area is sent to the Chugoku area using the cross-regional interconnector(Kanmon line).Then,the PHES in the Chugoku area is pumping with low price.Because the spot price in the market is low when the curtailment is executed.After that,the PHES is generating at night with high price when the solar PV is not generating.It makes a profit by the deference for the cost of pumping and the revenue of generating by the PHES.As a calculation result,for one week from May 2nd to 8th,2019,a profit becomes 152.2 million JPY(about 1.22 million EUR).For this purpose,it is necessary to raise the operation capacity of the cross-regional interconnector up to the rated capacity with the frequency control function of solar PV instead of the capacity to keep frequency in the event of an accident.This will allow the further introduction of solar PV in Japan.展开更多
Petroleum, the most important energy source in the world, plays an essential role in securing economic development. If a petroleum shortage happens, it will severely disrupt production and life. Cross-regional emergen...Petroleum, the most important energy source in the world, plays an essential role in securing economic development. If a petroleum shortage happens, it will severely disrupt production and life. Cross-regional emergency scheduling can effectively alleviate a petroleum shortage and further enhance the efficiency of the emergency response. Considering the general lack of focus on cross-regional petroleum dispatching management, we propose a three-layer emergency scheduling network for petroleum based on a supernetwork model that can increase the regional emergency correlation by adding a transfer management process. Then, we compare the total demand for petroleum and the emergency costs considered in the petroleum emergency scheduling supernetwork model(the single-region and the cross-region scenarios).The result shows that the cross-regional emergency scheduling pattern can effectively enhance the efficiency of the emergency preparations and reduce the emergency costs in most cases. However, when the vulnerabilities in the crossregional link grow or the regional linkage decreases, the effect of single-regional scheduling is better. In addition, the advantages of the cross-regional emergency scheduling network will be strengthened with an increase in its maximum emergency capability. Nonetheless, this advantage will disappear when the petroleum demand in the crisis layer reaches the maximum emergency response capacity. Finally, according to the comparative analysis simulation among scenarios,certain strategic policy recommendations are suggested to improve the petroleum emergency scheduling ability in regions.These recommendations include strengthening the cross-regional coordination mechanism, increasing the modes of petroleum transportation and enhancing the carrying capacity of regional emergency routes.展开更多
This paper first estimated the infectious capacity of COVID-19 based on the time series evolution data of confirmed cases in multiple countries. Then, a method to infer the cross-regional spread speed of COVID-19 was ...This paper first estimated the infectious capacity of COVID-19 based on the time series evolution data of confirmed cases in multiple countries. Then, a method to infer the cross-regional spread speed of COVID-19 was introduced in this paper, which took the gross domestic product(GDP) of each region as one of the factors that affect the spread speed of COVID-19 and studied the relationship between the GDP and the infection density of each region(China's Mainland, the United States, and EU countries). In addition, the geographic distance between regions was also considered in this method and the effect of geographic distance on the spread speed of COVID-19 was studied. Studies have shown that the probability of mutual infection of these two regions decreases with increasing geographic distance. Therefore, this paper proposed an epidemic disease spread index based on GDP and geographic distance to quantify the spread speed of COVID-19 in a region. The analysis results showed a strong correlation between the epidemic disease spread index in a region and the number of confirmed cases. This finding provides reasonable suggestions for the control of epidemics. Strengthening the control measures in regions with higher epidemic disease spread index can effectively control the spread of epidemics.展开更多
This paper describes the results of cost-profit analysis related to interconnectors for Japan-Russia and JapanSouth Korea based on the Asia International Grid Connection Study Group 2^(nd) report. The Group has been e...This paper describes the results of cost-profit analysis related to interconnectors for Japan-Russia and JapanSouth Korea based on the Asia International Grid Connection Study Group 2^(nd) report. The Group has been established in 2016 for conducting research on international electric power networks in Asia from the viewpoint of technology, investment and legal framework. 2^(nd) report of the Group was published in June 2018, examining the profitability of an interconnectors between Japan and neighboring countries. The Group has calculated expected profit from operation of these interconnectors.The Group has categorized interconnector business into four models from the survey of preceding and current business on grids and interconnectors. To clarify profitability, expected internal rate of return(IRR) was calculated for each business model based on estimated investment cost for each route. When interconnector is dedicated to specific power plants or suppliers and electricity can be sold at Japan wholesale market at 2016-2017 price level, positive IRR levels are expected in case that Free on Board(FOB) price lower than 7 JPY/kWh. When the investment will be covered by electricity tariff by final consumers, tariff for consumers will just slightly increase by approximately 0.1 JPY/kWh.展开更多
A 10-nm-thick molybdenum tri-oxide(MoO3) thin film was used as the interconnector layer in tandem organic lightemitting devices(OLEDs).The tandem OLEDs with two identical emissive units consisting of N,N-bis(naph...A 10-nm-thick molybdenum tri-oxide(MoO3) thin film was used as the interconnector layer in tandem organic lightemitting devices(OLEDs).The tandem OLEDs with two identical emissive units consisting of N,N-bis(naphthalen-1-yl)N,N-bis(phenyl)-benzidine(NPB) /tris(8-hydroxyquinoline) aluminum(Alq3) exhibited current efficiency-current density characteristics superior to the conventional single-unit devices.At 20 mA/cm2,the current efficiency of the tandem OLEDs using the interconnector layers of MoO3 thin film was about 4.0 cd/A,which is about twice that of the corresponding conventional single-unit device(1.8cd/A).The tandem OLED showed a higher power efficiency than the conventional single-unit device for luminance over 1200cd/m2.The experimental results demonstrated that a MoO3 thin film with a proper thickness can be used as an effective interconnector layer in tandem OLEDs.Such an interconnector layer can be easily fabricated by simple thermal evaporation,greatly simplifying the device processing and fabrication processes required by previously reported interconnector layers.A possible explanation was proposed for the carrier generation of the MoO3 interconnector layer.展开更多
As an interconnector of solid oxide fuel cell, La 1-x Ca x CrO 3( x =0 0~0 5) were prepared by sol gel method. The crystal structures of La 1-x Ca x CrO 3 at room temperature are the or...As an interconnector of solid oxide fuel cell, La 1-x Ca x CrO 3( x =0 0~0 5) were prepared by sol gel method. The crystal structures of La 1-x Ca x CrO 3 at room temperature are the orthorhombic perovskite GdFeO 3 type. XPS analysis indicates that chrome ions are in different valence state. The introduction of Ca 2+ into the lattice induces the oxidation of Cr 3+ to Cr 6+ . With x increasing, the amount of Cr 6+ increases. The present of the more Cr 6+ is one of the important factors that effect electric conductivity of La 1-x Ca x CrO 3.展开更多
文摘The amount of solar PV installed capacity has steadily increased to 44.5 GW at the end of FY2017,since the introduction of the Feed in Tariff(FiT)to Japan in 2012.On the other hand,since the first curtailment of solar PV was conducted on October 13th,2018 in the Kyushu area,the curtailment has been frequently executed including wind power after that.In this study,cross-regional interconnector and pumped hydro energy storage(PHES)are focused on mitigating curtailment.In Japan,there are 9 electric power areas which connected each other by cross-regional interconnectors.According to the historical operation,cross-regional interconnectors were secured as emergency flexible measures,but after the implicit auction was started from October 2018,it is used on merit order.Regarding a PHES in Japan,they have been built with nuclear power plants for several decades.Because the output of nuclear power generation is constant,so the PHES is used to absorb the surplus at nighttime when the demand declines.All nuclear power plants in Japan have been shut down after the accident at the Fukushima Daiichi Nuclear Power Plant following the Great East Japan Earthquake that occurred on March 11th,2011.There are several nuclear power plants that have been restarted(9 reactors,as of August 2019).In this study,the amount of curtailment for solar PV in the Kyushu area is sent to the Chugoku area using the cross-regional interconnector(Kanmon line).Then,the PHES in the Chugoku area is pumping with low price.Because the spot price in the market is low when the curtailment is executed.After that,the PHES is generating at night with high price when the solar PV is not generating.It makes a profit by the deference for the cost of pumping and the revenue of generating by the PHES.As a calculation result,for one week from May 2nd to 8th,2019,a profit becomes 152.2 million JPY(about 1.22 million EUR).For this purpose,it is necessary to raise the operation capacity of the cross-regional interconnector up to the rated capacity with the frequency control function of solar PV instead of the capacity to keep frequency in the event of an accident.This will allow the further introduction of solar PV in Japan.
基金supported by the Fundamental Research Funds for the Central Universities (Grant No. 2014XT06)
文摘Petroleum, the most important energy source in the world, plays an essential role in securing economic development. If a petroleum shortage happens, it will severely disrupt production and life. Cross-regional emergency scheduling can effectively alleviate a petroleum shortage and further enhance the efficiency of the emergency response. Considering the general lack of focus on cross-regional petroleum dispatching management, we propose a three-layer emergency scheduling network for petroleum based on a supernetwork model that can increase the regional emergency correlation by adding a transfer management process. Then, we compare the total demand for petroleum and the emergency costs considered in the petroleum emergency scheduling supernetwork model(the single-region and the cross-region scenarios).The result shows that the cross-regional emergency scheduling pattern can effectively enhance the efficiency of the emergency preparations and reduce the emergency costs in most cases. However, when the vulnerabilities in the crossregional link grow or the regional linkage decreases, the effect of single-regional scheduling is better. In addition, the advantages of the cross-regional emergency scheduling network will be strengthened with an increase in its maximum emergency capability. Nonetheless, this advantage will disappear when the petroleum demand in the crisis layer reaches the maximum emergency response capacity. Finally, according to the comparative analysis simulation among scenarios,certain strategic policy recommendations are suggested to improve the petroleum emergency scheduling ability in regions.These recommendations include strengthening the cross-regional coordination mechanism, increasing the modes of petroleum transportation and enhancing the carrying capacity of regional emergency routes.
基金Project supported by the National Natural Science Foundation of China (Grant Nos.62266030 and 61863025)International S & T Cooperation Projects of Gansu province (Grant No.144WCGA166)Longyuan Young Innovation Talents and the Doctoral Foundation of LUT。
文摘This paper first estimated the infectious capacity of COVID-19 based on the time series evolution data of confirmed cases in multiple countries. Then, a method to infer the cross-regional spread speed of COVID-19 was introduced in this paper, which took the gross domestic product(GDP) of each region as one of the factors that affect the spread speed of COVID-19 and studied the relationship between the GDP and the infection density of each region(China's Mainland, the United States, and EU countries). In addition, the geographic distance between regions was also considered in this method and the effect of geographic distance on the spread speed of COVID-19 was studied. Studies have shown that the probability of mutual infection of these two regions decreases with increasing geographic distance. Therefore, this paper proposed an epidemic disease spread index based on GDP and geographic distance to quantify the spread speed of COVID-19 in a region. The analysis results showed a strong correlation between the epidemic disease spread index in a region and the number of confirmed cases. This finding provides reasonable suggestions for the control of epidemics. Strengthening the control measures in regions with higher epidemic disease spread index can effectively control the spread of epidemics.
文摘This paper describes the results of cost-profit analysis related to interconnectors for Japan-Russia and JapanSouth Korea based on the Asia International Grid Connection Study Group 2^(nd) report. The Group has been established in 2016 for conducting research on international electric power networks in Asia from the viewpoint of technology, investment and legal framework. 2^(nd) report of the Group was published in June 2018, examining the profitability of an interconnectors between Japan and neighboring countries. The Group has calculated expected profit from operation of these interconnectors.The Group has categorized interconnector business into four models from the survey of preceding and current business on grids and interconnectors. To clarify profitability, expected internal rate of return(IRR) was calculated for each business model based on estimated investment cost for each route. When interconnector is dedicated to specific power plants or suppliers and electricity can be sold at Japan wholesale market at 2016-2017 price level, positive IRR levels are expected in case that Free on Board(FOB) price lower than 7 JPY/kWh. When the investment will be covered by electricity tariff by final consumers, tariff for consumers will just slightly increase by approximately 0.1 JPY/kWh.
基金Project supported by the Doctoral Foundation of the Ministry of Education of China (Grant No. 20100171110025)the State Key Laboratory of Optoelectronic Materials and Technologies,China (Grant No. 2010-RC-3-1)the Fundamental Research Funds for the Central Universities,China (Grant No. 09lgpy25)
文摘A 10-nm-thick molybdenum tri-oxide(MoO3) thin film was used as the interconnector layer in tandem organic lightemitting devices(OLEDs).The tandem OLEDs with two identical emissive units consisting of N,N-bis(naphthalen-1-yl)N,N-bis(phenyl)-benzidine(NPB) /tris(8-hydroxyquinoline) aluminum(Alq3) exhibited current efficiency-current density characteristics superior to the conventional single-unit devices.At 20 mA/cm2,the current efficiency of the tandem OLEDs using the interconnector layers of MoO3 thin film was about 4.0 cd/A,which is about twice that of the corresponding conventional single-unit device(1.8cd/A).The tandem OLED showed a higher power efficiency than the conventional single-unit device for luminance over 1200cd/m2.The experimental results demonstrated that a MoO3 thin film with a proper thickness can be used as an effective interconnector layer in tandem OLEDs.Such an interconnector layer can be easily fabricated by simple thermal evaporation,greatly simplifying the device processing and fabrication processes required by previously reported interconnector layers.A possible explanation was proposed for the carrier generation of the MoO3 interconnector layer.
文摘As an interconnector of solid oxide fuel cell, La 1-x Ca x CrO 3( x =0 0~0 5) were prepared by sol gel method. The crystal structures of La 1-x Ca x CrO 3 at room temperature are the orthorhombic perovskite GdFeO 3 type. XPS analysis indicates that chrome ions are in different valence state. The introduction of Ca 2+ into the lattice induces the oxidation of Cr 3+ to Cr 6+ . With x increasing, the amount of Cr 6+ increases. The present of the more Cr 6+ is one of the important factors that effect electric conductivity of La 1-x Ca x CrO 3.