Settlement monitoring system of pile-group foundation
1
作者 陈志坚 张宁宁 张雄文 《Journal of Central South University》 SCIE EI CAS 2011年第6期2122-2130,共9页
In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler... In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler were integrated synthetically. A set of practical multi-scale monitoring system on settlement of super-large pile-group foundation in deep water was put forward. The reliable settlement results are obtained by means of multi-sensor data fusion. Finite element model of pile-group foundation is established. By analysis of finite element simulated calculation of pile-group foundation, rules of settlement and uneven settlement obtained by monitoring and calculation results are coincident and the absolute error of settlement between them is 4.7 mm. The research shows that it is reasonable and feasible to monitor settlement of pile-group foundation with the system, and it can provide a method for the same type pile-group foundation in deep water. 展开更多
关键词 pile-group foundation settlement monitoring system multi-sensor data fusion
下载PDF
Feasibility study on sinkhole monitoring with fiber optic strain sensing nerves 被引量:1
2
作者 Yuxin Gao Honghu Zhu +3 位作者 Liang Qiao Xifeng Liu Chao Wei Wei Zhang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第11期3059-3070,共12页
Anthropogenic activity-induced sinkholes pose a serious threat to building safety and human life nowadays.Real-time detection and early warning of sinkhole formation are a key and urgent problem in urban areas.This pa... Anthropogenic activity-induced sinkholes pose a serious threat to building safety and human life nowadays.Real-time detection and early warning of sinkhole formation are a key and urgent problem in urban areas.This paper presents an experimental study to evaluate the feasibility of fiber optic strain sensing nerves in sinkhole monitoring.Combining the artificial neural network(ANN)and particle image velocimetry(PIV)techniques,a series of model tests have been performed to explore the relationship between strain measurements and sinkhole development and to establish a conversion model from strain data to ground settlements.It is demonstrated that the failure mechanism of the soil above the sinkhole developed from a triangle failure plane to a vertical failure plane with increasing collapse volume.Meanwhile,the soil-embedded fiber optic strain sensing nerves allowed deformation monitoring of the ground soil in real time.Furthermore,the characteristics of the measured strain profiles indicate the locations of sinkholes and the associated shear bands.Based on the strain data,the ANN model predicts the ground settlement well.Additionally,micro-anchored fiber optic cables have been proven to increase the soil-to-fiber strain transfer efficiency for large deformation monitoring of ground collapse. 展开更多
关键词 SINKHOLE Geotechnical monitoring Distributed fiber optic sensing(DFOS) Artificial neural network(ANN) Ground settlement Soil arching Micro-anchor
下载PDF
Wireless remote spatiotemporal monitoring of high-fill foundation deformation
3
作者 YANG Xiao-hui LI Zhi-qian +1 位作者 ZHU Yan-peng GUO Nan 《Journal of Mountain Science》 SCIE CSCD 2023年第6期1620-1638,共19页
The spatial and temporal deformation patterns and deformation control indicators of highfill foundations directly affect the design,construction and operational safety of high-fill projects.In situ monitoring can comp... The spatial and temporal deformation patterns and deformation control indicators of highfill foundations directly affect the design,construction and operational safety of high-fill projects.In situ monitoring can comprehensively reflect the deformation of high-fill during and after construction.In this paper,we have first designed and installed an integrated wireless remote monitoring system for high-fill to achieve real-time dynamic monitoring of settlement,pore water pressure and soil pressure of the fill foundation.Based on the monitoring results of nearly one year of the construction period and two years after construction,it was found that the deformation amount and deformation rate of the high-fill foundation showed a non-linear growth relationship with the filling rate and filling height.The settlement deformation of the high-fill foundation during the loading period was mainly dominated by the original foundation soil,accounting for 54.4%of the total settlement on average;the settlement deformation during the post-construction period was mainly dominated by the filling body,accounting for 77.04%of the total settlement on average,and the settlement deformation during the post-construction period mainly occurred in the first year after construction.The analysis of the deformation mechanism suggests that the deformation of the filling body is dominated by exhaust consolidation during the loading period and drainage consolidation during the post-construction period;the deformation of the original foundation soil is dominated by drainage consolidation during the loading period and drainage consolidation develops slowly during the post-construction period.It is recommended that the original foundation should be reinforced before the large area filling construction,and that the filling rate should be strictly controlled during construction.The research results can provide a scientific basis for deformation calculation and stability assessment of high-fill foundations. 展开更多
关键词 High-fill engineering Wireless remote monitoring Foundation deformation Spatiotemporal law settlement after construction
下载PDF
真空预压-PVD排水板加固吹填土地基试验及数值模拟研究
4
作者 齐琛娜 陈秋南 +3 位作者 黄小城 龙坤 吴启梅 许笑翟 《湖南工业大学学报》 2025年第1期9-18,共10页
对虎门港地区某施工现场典型吹填土开展了室内土工试验、真空预压-PVD排水板加固吹填土的室内单井模型试验,通过试验测量模型筒内的孔隙水压力、土体沉降量、排水板不同位置的真空度大小和试验排水量,并在模型试验结束后取模型筒内不同... 对虎门港地区某施工现场典型吹填土开展了室内土工试验、真空预压-PVD排水板加固吹填土的室内单井模型试验,通过试验测量模型筒内的孔隙水压力、土体沉降量、排水板不同位置的真空度大小和试验排水量,并在模型试验结束后取模型筒内不同位置的土样进行直剪试验和含水率测定,对真空预压-PVD排水板加固土体效果和排水板淤堵问题进行了分析,并用Abaqus软件建立了相应的二维有限元模型,分析改变膜下真空度和改变排水板插入深度等因素对地基固结效果的影响。研究发现,土体的抗剪强度随着深度的增加而逐渐降低,土样的顶部沉降量最大,逐渐减少至中部以下土样的沉降仅有轻微差异,受淤堵层的影响,排水表现出在排水开始时排水量迅速增加,达最大值后逐渐减小,最后趋于稳定的现象;而随着膜下真空度的增大和排水板打设深度的增加,地基固结效果越好。 展开更多
关键词 吹填土地基 真空预压 塑料排水板 沉降监测
下载PDF
Characteristics of thawed interlayer and its effect on embankment settlement along the Qinghai-Tibet Railway in permafrost regions 被引量:2
5
作者 SUN Zhi-zhong MA Wei +3 位作者 ZHANG Shu-juan MU Yan-hu YUN Han-bo WANG Hong-lei 《Journal of Mountain Science》 SCIE CSCD 2018年第5期1090-1100,共11页
The formation of thawed interlayer beneath embankment can result in embankment settlement in permafrost regions. Based on the data on ground temperatures and deformations beneath the embankment, observed in-situ along... The formation of thawed interlayer beneath embankment can result in embankment settlement in permafrost regions. Based on the data on ground temperatures and deformations beneath the embankment, observed in-situ along the QinghaiTibet Railway in permafrost regions from 2006 to2013, characteristics of the thawed interlayer beneath the embankment and its influence on the embankment settlement are studied. The results indicate that the thawed interlayer hardly forms beneath the natural field, and beneath the embankments from the Qinghai-Tibet Railway the thawed interlayer develops widely, and it can be refrozen totally in the regions with lower mean annual ground temperature, and developed further in the regions with higher mean annual ground temperature.The thawed interlayer is closely related to the embankment settlement. The ice content of permafrost underlying the thawed interlayer influences the settlement of embankment. The higher the ice content is, the larger the settlement is, and vice versa. The increase in thickness of thawed interlayer mainly results from the decline of artificial permafrost table in high-temperature permafrost regions. 展开更多
关键词 IN-SITU monitoring Qinghai-TibetRailway EMBANKMENT settlement Thawed INTERLAYER
下载PDF
Settlement Prediction for Buildings Surrounding Foundation Pits Based on a Stationary Auto-regression Model 被引量:3
6
作者 TIAN Lin-ya HUA Xi-sheng 《Journal of China University of Mining and Technology》 EI 2007年第1期78-81,共4页
To ensure the safety of buildings surrounding foundation pits, a study was made on a settlement monitoring and trend prediction method. A statistical testing method for analyzing the stability of a settlement monitori... To ensure the safety of buildings surrounding foundation pits, a study was made on a settlement monitoring and trend prediction method. A statistical testing method for analyzing the stability of a settlement monitoring datum has been discussed. According to a comprehensive survey, data of 16 stages at operating control point, were verified by a standard t test to determine the stability of the operating control point. A stationary auto-regression model, AR(p), used for the observation point settlement prediction has been investigated. Given the 16 stages of the settlement data at an observation point, the applicability of this model was analyzed. Settlement of last four stages was predicted using the stationary auto-regression model AR (1); the maximum difference between predicted and measured values was 0.6 mm, indicating good prediction results of the model. Hence, this model can be applied to settlement predictions for buildings surrounding foundation pits. 展开更多
关键词 foundation pit BUILDING settlement monitoring datum stability stationary auto-regression model settlement prediction
下载PDF
Settlement prediction and behaviour of pile foundations in deep clayey soil deposits 被引量:1
7
作者 马建林 Hussein Yousif Aziz +1 位作者 苏春晖 石聪 《Journal of Central South University》 SCIE EI CAS 2014年第4期1554-1564,共11页
A new measurement technique is used to determine the settlement of bridge pile foundation and the thickness of deep compressed soft layer. The finite element Plaxis 3D foundation program is used in the analysis with a... A new measurement technique is used to determine the settlement of bridge pile foundation and the thickness of deep compressed soft layer. The finite element Plaxis 3D foundation program is used in the analysis with a proposed empirical equation to modify the input parameters represented by the soil compression modulus. The results of the numerical analysis using the proposed empirical equation provide insight to the settlement analysis of pile groups in soft clayey soils; consequently, the finite element Plaxis 3D program can be a useful tool for numerical analysis. The numerical analysis is modified by adjusting the calculation of compression modulus from those obtained under pressure between 100-200 kPa by which the results of the settlement are modified and thus matching the realistic measurements. The absolute error is 3 mm which is accepted compared with the last researches. This scenario can be applied for the similar problems in the theoretical applications of deep foundations. 展开更多
关键词 compression modulus 3D finite elements settlement monitoring soil plasticity
下载PDF
Characteristics of thawed interlayer and its effect on settlement beneath embankment in permafrost regions--A case study for the Qinghai-Tibet Highway
8
作者 ZhiZhong Sun HongLei Wang +2 位作者 WenJie Feng YongZhi Liu ShuJuan Zhang 《Research in Cold and Arid Regions》 CSCD 2017年第5期447-454,共8页
Based on ground temperatures and deformations monitored at the Xieshuihe site along the Qinghai-Tibet Highway(QTH)in permafrost regions from 2004 to 2015,variation of artificial permafrost table(APT),maximum frozen de... Based on ground temperatures and deformations monitored at the Xieshuihe site along the Qinghai-Tibet Highway(QTH)in permafrost regions from 2004 to 2015,variation of artificial permafrost table(APT),maximum frozen depth(MFD),thawed interlayer thickness(TIT)and ground temperature beneath embankment is analyzed,respectively.The results indicate that under the embankment,the change of APT occurred from October to December of that year and presented a deepening trend.The change of MFD occurred from April to June of that year with no obvious change trend,and TIT had an increasing trend year by year,which mainly resulted from the deepening artificial permafrost table.Mean annual ground temperature at 0.5 m depth was 3.91°C higher beneath the embankment center than that under the natural field.The rising ground temperature at shallow layer of embankment resulted in the development of thawed interlayer beneath the embankment and warming of underlying permafrost.Embankment settlement is closely associated with TIT.Greater settlement easily occurs when permafrost with higher ice content exists under the thawed interlayer,and in turn the settlement is smaller when permafrost with lower ice content exists under the thawed interlayer. 展开更多
关键词 thawed INTERLAYER EMBANKMENT IN-SITU monitoring settlement Qinghai-Tibet HIGHWAY
下载PDF
Observation and evaluation of bridge settlement in Beijing—Tianjin intercity railway
9
作者 Ding Yuanwen 《Engineering Sciences》 EI 2012年第1期56-60,共5页
Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determi... Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example. 展开更多
关键词 Beijing--Tianjin intercity railway BRIDGE settlement monitoring EVALUATION
下载PDF
基于静力水准的采空区地表变形监测及误差分析 被引量:2
10
作者 李学良 李宏艳 白国良 《煤炭技术》 CAS 2024年第2期154-158,共5页
目前,采空区上方的地表沉降变形监测主要采用人工水准仪测量,该方法效率低、成本高、周期长,且无法实现自动化实时监测。为解决上述问题,引入静力水准自动化监测技术,在分析静力水准自动化监测工作原理及监测系统构成的基础上,对其可靠... 目前,采空区上方的地表沉降变形监测主要采用人工水准仪测量,该方法效率低、成本高、周期长,且无法实现自动化实时监测。为解决上述问题,引入静力水准自动化监测技术,在分析静力水准自动化监测工作原理及监测系统构成的基础上,对其可靠性、误差来源及消除方法进行了深入探讨,最后结合条带采空区上方地表监测实例从监测方案、测点布置、数据分析等多个角度进行了系统研究。研究结果表明:该技术能够满足条带采空区上方地表沉降变形自动化监测的要求,可为相关监测工作提供技术支撑。 展开更多
关键词 静力水准 条带采空区 沉降监测 自动化
下载PDF
基于北斗系统的地表与地下一体式沉降监测新方法
11
作者 韩文斌 于永堂 +2 位作者 孙茉 郑建国 欧阳山 《灾害学》 CSCD 北大核心 2024年第1期69-74,共6页
为实现对地质灾害易发区地表沉降与地下沉降的同步、实时、自动监测,研发了基于北斗系统的地质体地表与地下一体化沉降监测新方法。该方法融合了北斗系统、静力水准仪、分层沉降标等沉降监测技术,监测原理如下:在稳定区域设置北斗基准点... 为实现对地质灾害易发区地表沉降与地下沉降的同步、实时、自动监测,研发了基于北斗系统的地质体地表与地下一体化沉降监测新方法。该方法融合了北斗系统、静力水准仪、分层沉降标等沉降监测技术,监测原理如下:在稳定区域设置北斗基准点,在监测区域设置工作基点与监测点;工作基点处的北斗卫星接收机与静力水准仪安装至同一桩上,北斗卫星接收机观测工作基点处静力水准仪的绝对沉降;监测点处的静力水准仪与分层沉降标同轴连接,分层沉降标将深层沉降引至地面由静力水准仪观测;北斗系统与静力水准系统同步采集数据,数据经时间同步后分别得到工作基点和监测点的绝对沉降量。该新方法成功解决了大面积沉降监测中面临的非稳定工作基点校测问题,实现了对地质体地表与地下沉降的远程和实时监测。 展开更多
关键词 北斗卫星定位系统 静力水准系统 沉降监测 分层沉降
下载PDF
北京丰台站改扩建项目分期施工沉降变形分析
12
作者 王媛 李伟强 唐虎 《岩土工程技术》 2024年第4期420-426,共7页
为确保丰台站改扩建施工期间既有铁路运输线不受影响,项目划分为3个施工区域,分两期先后施工,并于分期施工衔接部位设置了沉降后浇带。车站主体以现浇混凝土框架结构为主,后浇带的存在严重制约后期施工进度。为此,采用有限元计算软件PLA... 为确保丰台站改扩建施工期间既有铁路运输线不受影响,项目划分为3个施工区域,分两期先后施工,并于分期施工衔接部位设置了沉降后浇带。车站主体以现浇混凝土框架结构为主,后浇带的存在严重制约后期施工进度。为此,采用有限元计算软件PLAXIS3D对地层、结构及施工步序精细化建模,进行上部结构-基础-地基的协同沉降变形计算分析。分析结果显示,后浇带两侧因后期施工引起的差异沉降满足规范及设计要求,据此取消了沉降后浇带,为保证施工工期创造了条件。项目沉降监测数据及运行状况表明协同分析预测结果可靠,可供类似工程参考。 展开更多
关键词 沉降后浇带 沉降计算分析 差异沉降 沉降监测数据
下载PDF
压差式光纤光栅静力水准仪的设计与研究
13
作者 覃荷瑛 赖丹萍 周文龙 《压电与声光》 CAS 北大核心 2024年第1期54-60,共7页
为实现对建筑结构不均匀沉降的有效监测,基于光纤光栅与连通器的基本原理,该文设计了一种压差式光纤光栅静力水准仪,并对该水准仪进行了理论推导、标定试验及静态特性分析。试验结果表明,该水准仪灵敏度为6.5 pm/mm,线性拟合度R^(2)为0.... 为实现对建筑结构不均匀沉降的有效监测,基于光纤光栅与连通器的基本原理,该文设计了一种压差式光纤光栅静力水准仪,并对该水准仪进行了理论推导、标定试验及静态特性分析。试验结果表明,该水准仪灵敏度为6.5 pm/mm,线性拟合度R^(2)为0.999,非线性误差为1.48%,迟滞性误差为0.74%,重复性误差为5.72%,总精度为5.95%。为增大该水准仪灵敏度特性,对原有的波纹膜片改进与分析,结果表明,改进后的水准仪灵敏度为11.87 pm/mm,较改进前提升了约1.8倍。该结构形式的水准仪可对建筑物的沉降进行有效监测,为建筑物结构健康监测提供有效的技术支持。 展开更多
关键词 结构健康监测 光纤BRAGG光栅 不均匀沉降 静力水准仪 监测性能
下载PDF
盾构下穿诱发框架结构沉降实测与模拟分析
14
作者 刘庭金 陈培钊 +1 位作者 蔡良怡 林志威 《施工技术(中英文)》 CAS 2024年第4期74-80,149,共8页
为研究盾构隧道施工对上方框架结构的影响,以广州市综合管廊盾构斜交下穿中高层框架结构为工程背景,采用现场沉降监测及数值反演的方法分析结构的响应规律。结果表明:本工程盾构下穿位置的柱基沉降过程表现为主要沉降-沉降回弹-沉降稳定... 为研究盾构隧道施工对上方框架结构的影响,以广州市综合管廊盾构斜交下穿中高层框架结构为工程背景,采用现场沉降监测及数值反演的方法分析结构的响应规律。结果表明:本工程盾构下穿位置的柱基沉降过程表现为主要沉降-沉降回弹-沉降稳定3个阶段;沉降较大的柱基主要分布在盾构轴线沿线位置,差异沉降较大的柱基则主要分布在盾构轴线的周边位置;盾构的穿越位置会影响建筑物的倾斜趋势;盾构穿越后及时进行洞内二次注浆,能减小框架结构在稳定阶段的沉降、不均匀沉降及整体倾斜。 展开更多
关键词 隧道 盾构 框架结构 沉降 监测 数值模拟
下载PDF
黄淮冲积平原地区高速铁路螺杆桩复合地基应用研究 被引量:1
15
作者 李盼 《路基工程》 2024年第1期80-86,共7页
依托郑徐客运专线兰考南站路基工程螺杆桩复合地基项目,通过试桩和桩身质量检测,总结黄淮冲积平原地区螺杆桩关键施工工艺和质量控制措施,同时对螺杆桩承载力特性及复合地基进行工后沉降分析。结果表明:黄淮冲积平原地区粉质黏土、粉砂... 依托郑徐客运专线兰考南站路基工程螺杆桩复合地基项目,通过试桩和桩身质量检测,总结黄淮冲积平原地区螺杆桩关键施工工艺和质量控制措施,同时对螺杆桩承载力特性及复合地基进行工后沉降分析。结果表明:黄淮冲积平原地区粉质黏土、粉砂、细砂、圆砾土土层中可以形成螺杆桩螺纹段桩身,成桩质量良好;螺杆桩单桩承载力和复合地基承载力满足设计要求;该地区同等条件下,螺杆桩极限承载力较普通灌注桩提高约24%;复合地基沉降主要发生在填筑期;双曲线法预测得出三个观测断面工后沉降量均小于15mm,满足无砟轨道铺设要求。 展开更多
关键词 冲积平原 螺杆桩 复合地基 承载力试验 沉降监测 质量控制
下载PDF
砾砂地层盾构切削大直径群桩的刀具研究
16
作者 乔世范 张睿 +3 位作者 王广 王刚 陈道龙 张喆 《铁道科学与工程学报》 EI CAS CSCD 北大核心 2024年第5期1966-1978,共13页
刀盘刀具是盾构机实现切削功能并保证其顺利推进的主要部件,合适的刀具选型与设计在保证盾构机成功切削大直径钢筋混凝土群桩的过程中至关重要。依托沈阳地铁4号线盾构切桩工程,结合盾构穿越砾砂地层的工程特点以及切削大直径钢筋混凝... 刀盘刀具是盾构机实现切削功能并保证其顺利推进的主要部件,合适的刀具选型与设计在保证盾构机成功切削大直径钢筋混凝土群桩的过程中至关重要。依托沈阳地铁4号线盾构切桩工程,结合盾构穿越砾砂地层的工程特点以及切削大直径钢筋混凝土群桩的工程需求,对刀盘刀具进行选型,采用LS-DYNA软件模拟不同刃宽、刃角及前角的贝壳刀切削钢筋的效果。将分析结果应用于该工程,通过对比切桩前后既有隧道沉降变化规律论证刀具选型设计的合理性,并根据切桩后的贝壳刀磨损规律及盾构机排出钢筋情况,评估刀盘刀具切削效果,从而优化刀盘的刀具布置。研究结果表明:盾构刀盘采用面板+辐条复合式直角刀盘,切桩刀具采用前角-45°零后角、5 mm刃宽、90°刃角的双面刃贝壳刀,可提升盾构切桩效果;盾构切桩过程中既有隧道的变形波动控制在1.1 mm内,切桩完成后既有隧道的最大沉降仅为1.96 mm,未对既有隧道造成明显影响;刀盘布置贝壳刀时,应增加高度为210 mm的贝壳刀数量,尤其需要避免单个辐条上仅有1把高度为210 mm贝壳刀的情况,可有效提高刀盘刀具切削钢筋的能力并降低崩刃风险。刀具选型设计结果成功应用于沈阳地铁4号线切桩工程,可为今后类似工程提供参考。 展开更多
关键词 盾构隧道 直接切桩 大直径群桩 刀具设计 沉降监测
下载PDF
岩溶区PST管桩复合地基的工程应用
17
作者 张信贵 龙林川 +2 位作者 曹帅 韩伟 张懿丹 《建筑结构》 北大核心 2024年第4期50-54,17,共6页
经对某场地高层建筑地基素填土厚度大、下伏基岩岩溶发育、以多层串珠状溶洞为主的地层条件研究,提出一种PST管桩刚性复合地基。采用试验和监测等方法来指导复合地基处理设计与施工,根据场地试桩数据来验证设计的合理性。施工完成后,采... 经对某场地高层建筑地基素填土厚度大、下伏基岩岩溶发育、以多层串珠状溶洞为主的地层条件研究,提出一种PST管桩刚性复合地基。采用试验和监测等方法来指导复合地基处理设计与施工,根据场地试桩数据来验证设计的合理性。施工完成后,采用静载荷试验对复合地基进行质量验收检测,并连续进行沉降监测。结果表明:岩溶区PST管桩复合地基是一种处理高层建筑地基很可行的方法,处理后可以满足高层建筑物对地基强度、变形及稳定性的要求。 展开更多
关键词 岩溶区 PST管桩 复合地基 静载试验 沉降监测
下载PDF
基于最优PS点获取方法的矿山工业广场沉降监测
18
作者 杨可明 李婷婷 +3 位作者 马军 李亚星 江克贵 赵项通 《中国安全科学学报》 CAS CSCD 北大核心 2024年第5期44-51,共8页
为保障矿山地面和井下工作人员、工业广场周边居民以及运煤系统运行安全,实时监测地表变形情况,提出永久散射体(PS)点的优化获取方法,以提升PS-合成孔径雷达干涉测量(InSAR)技术在沉降监测中的适用性。首先,选择淮北市郊煤矿工业广场煤... 为保障矿山地面和井下工作人员、工业广场周边居民以及运煤系统运行安全,实时监测地表变形情况,提出永久散射体(PS)点的优化获取方法,以提升PS-合成孔径雷达干涉测量(InSAR)技术在沉降监测中的适用性。首先,选择淮北市郊煤矿工业广场煤柱Ⅱ513工作面开采沉陷期间2020年10月31日—2022年8月22日共26景SAR卫星影像,运用PS-InSAR技术确定最优的PS点目标选取方法;然后,基于该方法获取该工作面回采过程中的开采损害保护区地面沉降速率、累计沉降量;最后,基于地面水准点实测数据验证PS-InSAR监测精度并分析研究区地表及建(构)筑物动态沉降情况。结果表明:相干系数和振幅离差指数双阈值法较适应于研究区沉降监测;研究区内可探测到的最大下沉速率为-26.5 mm/a,最大累计下沉值为-53.7 mm;同时,探测到研究区西北部存在岩溶塌陷地质灾害因素;利用水准数据验证精度,均方根误差(RMSE)仅为3.8 mm,决定系数达到0.91。 展开更多
关键词 永久散射体(PS) 合成孔径雷达干涉测量(InSAR) 工业广场 沉降监测 相干系数 振幅离差指数
下载PDF
高架桥梁和盾构隧道的相互影响研究
19
作者 杨进先 《工程建设与设计》 2024年第7期94-96,共3页
根据江阴滨江路快速化改造及江阴靖江长江隧道工程现场实际施工工序,在桥墩桩基部分完成情况下,隧道左线穿越高架节点,在隧道左线建成工况下完成桥梁剩余桩基及满堂支架上部结构施工,在桥梁完成施工后,隧道右线穿越高架桥梁节点。论文通... 根据江阴滨江路快速化改造及江阴靖江长江隧道工程现场实际施工工序,在桥墩桩基部分完成情况下,隧道左线穿越高架节点,在隧道左线建成工况下完成桥梁剩余桩基及满堂支架上部结构施工,在桥梁完成施工后,隧道右线穿越高架桥梁节点。论文通过Plaxis3D模型分析了盾构隧道施工对已建桥梁的影响,提出施工方案优化及监测等保障措施以确保桥梁施工过程中的隧道绝对安全。 展开更多
关键词 桥梁 盾构隧道 全套管旋转钻施工 沉降监测
下载PDF
基于光纤陀螺的堆石坝内部沉降分布式监测技术研究 被引量:3
20
作者 廖铖 蔡德所 +1 位作者 李苗 林金城 《土木工程学报》 EI CSCD 北大核心 2024年第2期77-86,共10页
针对传统堆石坝内部沉降监测技术已难于满足超高堆石坝内部沉降监测需求。文章开发了基于光纤陀螺仪(FOG)的堆石坝内部沉降分布式监测系统,该系统主要由监测管道、监测小车和牵引装置组成。推导FOG监测系统测量坝体内部沉降的原理,考虑... 针对传统堆石坝内部沉降监测技术已难于满足超高堆石坝内部沉降监测需求。文章开发了基于光纤陀螺仪(FOG)的堆石坝内部沉降分布式监测系统,该系统主要由监测管道、监测小车和牵引装置组成。推导FOG监测系统测量坝体内部沉降的原理,考虑监测小车不匀速问题,建立监测小车运行速度函数关系,引进经验模态(EMD)-小波混合降噪方法滤除监测小车运行过程中的振动噪声和FOG漂移误差。该监测系统成功应用于猴子岩面板堆石坝。现场监测结果表明,FOG2次独立测量结果的相关系数为0.986,说明FOG监测系统工作性能稳定,与水管式沉降仪测量结果基本一致,验证了该系统的可行性和准确性。 展开更多
关键词 堆石坝 内部沉降 光纤陀螺 分布式监测 经验模态-小波
下载PDF