In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler...In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler were integrated synthetically. A set of practical multi-scale monitoring system on settlement of super-large pile-group foundation in deep water was put forward. The reliable settlement results are obtained by means of multi-sensor data fusion. Finite element model of pile-group foundation is established. By analysis of finite element simulated calculation of pile-group foundation, rules of settlement and uneven settlement obtained by monitoring and calculation results are coincident and the absolute error of settlement between them is 4.7 mm. The research shows that it is reasonable and feasible to monitor settlement of pile-group foundation with the system, and it can provide a method for the same type pile-group foundation in deep water.展开更多
Anthropogenic activity-induced sinkholes pose a serious threat to building safety and human life nowadays.Real-time detection and early warning of sinkhole formation are a key and urgent problem in urban areas.This pa...Anthropogenic activity-induced sinkholes pose a serious threat to building safety and human life nowadays.Real-time detection and early warning of sinkhole formation are a key and urgent problem in urban areas.This paper presents an experimental study to evaluate the feasibility of fiber optic strain sensing nerves in sinkhole monitoring.Combining the artificial neural network(ANN)and particle image velocimetry(PIV)techniques,a series of model tests have been performed to explore the relationship between strain measurements and sinkhole development and to establish a conversion model from strain data to ground settlements.It is demonstrated that the failure mechanism of the soil above the sinkhole developed from a triangle failure plane to a vertical failure plane with increasing collapse volume.Meanwhile,the soil-embedded fiber optic strain sensing nerves allowed deformation monitoring of the ground soil in real time.Furthermore,the characteristics of the measured strain profiles indicate the locations of sinkholes and the associated shear bands.Based on the strain data,the ANN model predicts the ground settlement well.Additionally,micro-anchored fiber optic cables have been proven to increase the soil-to-fiber strain transfer efficiency for large deformation monitoring of ground collapse.展开更多
The spatial and temporal deformation patterns and deformation control indicators of highfill foundations directly affect the design,construction and operational safety of high-fill projects.In situ monitoring can comp...The spatial and temporal deformation patterns and deformation control indicators of highfill foundations directly affect the design,construction and operational safety of high-fill projects.In situ monitoring can comprehensively reflect the deformation of high-fill during and after construction.In this paper,we have first designed and installed an integrated wireless remote monitoring system for high-fill to achieve real-time dynamic monitoring of settlement,pore water pressure and soil pressure of the fill foundation.Based on the monitoring results of nearly one year of the construction period and two years after construction,it was found that the deformation amount and deformation rate of the high-fill foundation showed a non-linear growth relationship with the filling rate and filling height.The settlement deformation of the high-fill foundation during the loading period was mainly dominated by the original foundation soil,accounting for 54.4%of the total settlement on average;the settlement deformation during the post-construction period was mainly dominated by the filling body,accounting for 77.04%of the total settlement on average,and the settlement deformation during the post-construction period mainly occurred in the first year after construction.The analysis of the deformation mechanism suggests that the deformation of the filling body is dominated by exhaust consolidation during the loading period and drainage consolidation during the post-construction period;the deformation of the original foundation soil is dominated by drainage consolidation during the loading period and drainage consolidation develops slowly during the post-construction period.It is recommended that the original foundation should be reinforced before the large area filling construction,and that the filling rate should be strictly controlled during construction.The research results can provide a scientific basis for deformation calculation and stability assessment of high-fill foundations.展开更多
The formation of thawed interlayer beneath embankment can result in embankment settlement in permafrost regions. Based on the data on ground temperatures and deformations beneath the embankment, observed in-situ along...The formation of thawed interlayer beneath embankment can result in embankment settlement in permafrost regions. Based on the data on ground temperatures and deformations beneath the embankment, observed in-situ along the QinghaiTibet Railway in permafrost regions from 2006 to2013, characteristics of the thawed interlayer beneath the embankment and its influence on the embankment settlement are studied. The results indicate that the thawed interlayer hardly forms beneath the natural field, and beneath the embankments from the Qinghai-Tibet Railway the thawed interlayer develops widely, and it can be refrozen totally in the regions with lower mean annual ground temperature, and developed further in the regions with higher mean annual ground temperature.The thawed interlayer is closely related to the embankment settlement. The ice content of permafrost underlying the thawed interlayer influences the settlement of embankment. The higher the ice content is, the larger the settlement is, and vice versa. The increase in thickness of thawed interlayer mainly results from the decline of artificial permafrost table in high-temperature permafrost regions.展开更多
To ensure the safety of buildings surrounding foundation pits, a study was made on a settlement monitoring and trend prediction method. A statistical testing method for analyzing the stability of a settlement monitori...To ensure the safety of buildings surrounding foundation pits, a study was made on a settlement monitoring and trend prediction method. A statistical testing method for analyzing the stability of a settlement monitoring datum has been discussed. According to a comprehensive survey, data of 16 stages at operating control point, were verified by a standard t test to determine the stability of the operating control point. A stationary auto-regression model, AR(p), used for the observation point settlement prediction has been investigated. Given the 16 stages of the settlement data at an observation point, the applicability of this model was analyzed. Settlement of last four stages was predicted using the stationary auto-regression model AR (1); the maximum difference between predicted and measured values was 0.6 mm, indicating good prediction results of the model. Hence, this model can be applied to settlement predictions for buildings surrounding foundation pits.展开更多
A new measurement technique is used to determine the settlement of bridge pile foundation and the thickness of deep compressed soft layer. The finite element Plaxis 3D foundation program is used in the analysis with a...A new measurement technique is used to determine the settlement of bridge pile foundation and the thickness of deep compressed soft layer. The finite element Plaxis 3D foundation program is used in the analysis with a proposed empirical equation to modify the input parameters represented by the soil compression modulus. The results of the numerical analysis using the proposed empirical equation provide insight to the settlement analysis of pile groups in soft clayey soils; consequently, the finite element Plaxis 3D program can be a useful tool for numerical analysis. The numerical analysis is modified by adjusting the calculation of compression modulus from those obtained under pressure between 100-200 kPa by which the results of the settlement are modified and thus matching the realistic measurements. The absolute error is 3 mm which is accepted compared with the last researches. This scenario can be applied for the similar problems in the theoretical applications of deep foundations.展开更多
Based on ground temperatures and deformations monitored at the Xieshuihe site along the Qinghai-Tibet Highway(QTH)in permafrost regions from 2004 to 2015,variation of artificial permafrost table(APT),maximum frozen de...Based on ground temperatures and deformations monitored at the Xieshuihe site along the Qinghai-Tibet Highway(QTH)in permafrost regions from 2004 to 2015,variation of artificial permafrost table(APT),maximum frozen depth(MFD),thawed interlayer thickness(TIT)and ground temperature beneath embankment is analyzed,respectively.The results indicate that under the embankment,the change of APT occurred from October to December of that year and presented a deepening trend.The change of MFD occurred from April to June of that year with no obvious change trend,and TIT had an increasing trend year by year,which mainly resulted from the deepening artificial permafrost table.Mean annual ground temperature at 0.5 m depth was 3.91°C higher beneath the embankment center than that under the natural field.The rising ground temperature at shallow layer of embankment resulted in the development of thawed interlayer beneath the embankment and warming of underlying permafrost.Embankment settlement is closely associated with TIT.Greater settlement easily occurs when permafrost with higher ice content exists under the thawed interlayer,and in turn the settlement is smaller when permafrost with lower ice content exists under the thawed interlayer.展开更多
Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determi...Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.展开更多
基金Project(2002CB412707) supported by the National Basic Research Program of ChinaProject(2006BAG04B05) supported by the National Science and Technology Pillar Program during the 11th Five-Year Plan of ChinaProject(2010B14414) supported by the Scientific Research Program of Center University in China
文摘In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler were integrated synthetically. A set of practical multi-scale monitoring system on settlement of super-large pile-group foundation in deep water was put forward. The reliable settlement results are obtained by means of multi-sensor data fusion. Finite element model of pile-group foundation is established. By analysis of finite element simulated calculation of pile-group foundation, rules of settlement and uneven settlement obtained by monitoring and calculation results are coincident and the absolute error of settlement between them is 4.7 mm. The research shows that it is reasonable and feasible to monitor settlement of pile-group foundation with the system, and it can provide a method for the same type pile-group foundation in deep water.
基金support provided by the National Natural Science Foundation of China(Grant Nos.42225702,and 42077232)the Open Research Project Program of the State Key Laboratory of Internet of Things for Smart City(University of Macao)(Grant No.SKL-IoTSC(UM)-2021-2023/ORP/GA10/2022).
文摘Anthropogenic activity-induced sinkholes pose a serious threat to building safety and human life nowadays.Real-time detection and early warning of sinkhole formation are a key and urgent problem in urban areas.This paper presents an experimental study to evaluate the feasibility of fiber optic strain sensing nerves in sinkhole monitoring.Combining the artificial neural network(ANN)and particle image velocimetry(PIV)techniques,a series of model tests have been performed to explore the relationship between strain measurements and sinkhole development and to establish a conversion model from strain data to ground settlements.It is demonstrated that the failure mechanism of the soil above the sinkhole developed from a triangle failure plane to a vertical failure plane with increasing collapse volume.Meanwhile,the soil-embedded fiber optic strain sensing nerves allowed deformation monitoring of the ground soil in real time.Furthermore,the characteristics of the measured strain profiles indicate the locations of sinkholes and the associated shear bands.Based on the strain data,the ANN model predicts the ground settlement well.Additionally,micro-anchored fiber optic cables have been proven to increase the soil-to-fiber strain transfer efficiency for large deformation monitoring of ground collapse.
基金supported by the Youth Science and Technology Fund Program in Gansu Province(20JR5RA434 and 20JR10RA200)National Natural Science Foundation of China(52168051)+1 种基金Gansu Province University Innovation Fund Project(2020A031)Gansu Provincial Science and Technology Plan Fund Project(22CX8GA112)。
文摘The spatial and temporal deformation patterns and deformation control indicators of highfill foundations directly affect the design,construction and operational safety of high-fill projects.In situ monitoring can comprehensively reflect the deformation of high-fill during and after construction.In this paper,we have first designed and installed an integrated wireless remote monitoring system for high-fill to achieve real-time dynamic monitoring of settlement,pore water pressure and soil pressure of the fill foundation.Based on the monitoring results of nearly one year of the construction period and two years after construction,it was found that the deformation amount and deformation rate of the high-fill foundation showed a non-linear growth relationship with the filling rate and filling height.The settlement deformation of the high-fill foundation during the loading period was mainly dominated by the original foundation soil,accounting for 54.4%of the total settlement on average;the settlement deformation during the post-construction period was mainly dominated by the filling body,accounting for 77.04%of the total settlement on average,and the settlement deformation during the post-construction period mainly occurred in the first year after construction.The analysis of the deformation mechanism suggests that the deformation of the filling body is dominated by exhaust consolidation during the loading period and drainage consolidation during the post-construction period;the deformation of the original foundation soil is dominated by drainage consolidation during the loading period and drainage consolidation develops slowly during the post-construction period.It is recommended that the original foundation should be reinforced before the large area filling construction,and that the filling rate should be strictly controlled during construction.The research results can provide a scientific basis for deformation calculation and stability assessment of high-fill foundations.
基金supported by the National Natural Science Foundation of China(Grant Nos.41571064,41630636 and 41471061)the Independent Research of the State Key Laboratory of Frozen Soil Engineering(SKLFSE-ZT-09)
文摘The formation of thawed interlayer beneath embankment can result in embankment settlement in permafrost regions. Based on the data on ground temperatures and deformations beneath the embankment, observed in-situ along the QinghaiTibet Railway in permafrost regions from 2006 to2013, characteristics of the thawed interlayer beneath the embankment and its influence on the embankment settlement are studied. The results indicate that the thawed interlayer hardly forms beneath the natural field, and beneath the embankments from the Qinghai-Tibet Railway the thawed interlayer develops widely, and it can be refrozen totally in the regions with lower mean annual ground temperature, and developed further in the regions with higher mean annual ground temperature.The thawed interlayer is closely related to the embankment settlement. The ice content of permafrost underlying the thawed interlayer influences the settlement of embankment. The higher the ice content is, the larger the settlement is, and vice versa. The increase in thickness of thawed interlayer mainly results from the decline of artificial permafrost table in high-temperature permafrost regions.
基金Project 50279005 supported by the National Natural Science Foundation of China
文摘To ensure the safety of buildings surrounding foundation pits, a study was made on a settlement monitoring and trend prediction method. A statistical testing method for analyzing the stability of a settlement monitoring datum has been discussed. According to a comprehensive survey, data of 16 stages at operating control point, were verified by a standard t test to determine the stability of the operating control point. A stationary auto-regression model, AR(p), used for the observation point settlement prediction has been investigated. Given the 16 stages of the settlement data at an observation point, the applicability of this model was analyzed. Settlement of last four stages was predicted using the stationary auto-regression model AR (1); the maximum difference between predicted and measured values was 0.6 mm, indicating good prediction results of the model. Hence, this model can be applied to settlement predictions for buildings surrounding foundation pits.
基金Project(SWJT11ZT04)supported by the Central College Foundation of ChinaProject(2008g032-A)supported by the Major Projects S&T Foundation of China’s Ministry of Railways,China
文摘A new measurement technique is used to determine the settlement of bridge pile foundation and the thickness of deep compressed soft layer. The finite element Plaxis 3D foundation program is used in the analysis with a proposed empirical equation to modify the input parameters represented by the soil compression modulus. The results of the numerical analysis using the proposed empirical equation provide insight to the settlement analysis of pile groups in soft clayey soils; consequently, the finite element Plaxis 3D program can be a useful tool for numerical analysis. The numerical analysis is modified by adjusting the calculation of compression modulus from those obtained under pressure between 100-200 kPa by which the results of the settlement are modified and thus matching the realistic measurements. The absolute error is 3 mm which is accepted compared with the last researches. This scenario can be applied for the similar problems in the theoretical applications of deep foundations.
基金supported by the National Natural Science Foundation of China (No. 41571064)the Key Program of National Natural Science Foundation of China (No. 41630636)the Independent Research of the State Key Laboratory of Frozen Soil Engineering (No. SKLFSE-ZT-09)
文摘Based on ground temperatures and deformations monitored at the Xieshuihe site along the Qinghai-Tibet Highway(QTH)in permafrost regions from 2004 to 2015,variation of artificial permafrost table(APT),maximum frozen depth(MFD),thawed interlayer thickness(TIT)and ground temperature beneath embankment is analyzed,respectively.The results indicate that under the embankment,the change of APT occurred from October to December of that year and presented a deepening trend.The change of MFD occurred from April to June of that year with no obvious change trend,and TIT had an increasing trend year by year,which mainly resulted from the deepening artificial permafrost table.Mean annual ground temperature at 0.5 m depth was 3.91°C higher beneath the embankment center than that under the natural field.The rising ground temperature at shallow layer of embankment resulted in the development of thawed interlayer beneath the embankment and warming of underlying permafrost.Embankment settlement is closely associated with TIT.Greater settlement easily occurs when permafrost with higher ice content exists under the thawed interlayer,and in turn the settlement is smaller when permafrost with lower ice content exists under the thawed interlayer.
文摘Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically,and mathematical model and determinant conditions of settlement were proposed simultaneously,taking Beijing—Tianjin intercity railway as an example.