DCS (distributed control system) plays a decisive role in the overall operation of a nuclear power plant. If DCS fails, it will seriously affect the normal production of nuclear power plant, causing great losses. So...DCS (distributed control system) plays a decisive role in the overall operation of a nuclear power plant. If DCS fails, it will seriously affect the normal production of nuclear power plant, causing great losses. So it is very important to take perfect lightning protection measures on DCS of the nuclear power plant. In this paper, according to the actual situation of DCS in a nuclear power plant, by controlling lightning point, securely booting lightning into the ground network, improving low-resistance ground network, eliminating ground loops, determining the safety space, surge protection of power and signal, a set of complete lightning protection design scheme was systematically put forward. Some specific lightning protection measures were highlighted, such as the DCS grounding, equipotential bonds and shields, and some specific considerations were put forward. All of these could offer reference in the practical application.展开更多
A nuclear power plant real-time engineering simulator was developed based on general-purpose ther- mal-hydraulic system simulation code RELAP5. It mainly consists of three parts:improved thermal-hydraulic system simul...A nuclear power plant real-time engineering simulator was developed based on general-purpose ther- mal-hydraulic system simulation code RELAP5. It mainly consists of three parts:improved thermal-hydraulic system simulation code RELAP5,control and protection system and human-machine interface. A normal transient of CHASHMA nuclear power plant turbine step load change from 100% to 90% of full power,was simulated by the en- gineering simulator as an application example. This paper presents structure and main features of the engineering simulator,and application results are shown and discussed.展开更多
The main technical backgrounds and requirements are introduced with regard to earthquake ground motion design parameters in several domestic and American standards,codes and guides involved in the seismic analysis and...The main technical backgrounds and requirements are introduced with regard to earthquake ground motion design parameters in several domestic and American standards,codes and guides involved in the seismic analysis and design activities of nuclear power plants in China.Based on the research results from site seismic safety evaluation of domestic nuclear power plant projects in the last years,characteristics and differences of site specific design spectra are analyzed in comparison with standard response spectra,and the suitability of standard response spectra for domestic nuclear power plant projects is discussed.展开更多
With the global warming and sea level rising, it is widely recognized that there is an increasing tendency of typhoon occurrence frequency and intensity. The defenses code against typhoon attacks for nuclear power pla...With the global warming and sea level rising, it is widely recognized that there is an increasing tendency of typhoon occurrence frequency and intensity. The defenses code against typhoon attacks for nuclear power plant should be calibrated because of the increasing threat of typhoon disaster and severe consequences. This paper discusses the probabilistic approach of definitions about "probable maximum typhoon" and "probable maximum storm surge" in nuclear safety regulations of China and has made some design code calibrations by use of a newly proposed Double Layer Nested Mtdti-objective Probability Model (DLNMPM).展开更多
: Consideration of the dynamic effects of the site and structural parameter uncertainty is required by the standards for nuclear power plants (NPPs) in most countries. The anti-seismic standards provide two basic m...: Consideration of the dynamic effects of the site and structural parameter uncertainty is required by the standards for nuclear power plants (NPPs) in most countries. The anti-seismic standards provide two basic methods to analyze parameter uncertainty. Directly manually dealing with the calculated floor response spectra (FRS) values of deterministic approaches is the first method. The second method is to perform probability statistical analysis of the FRS results on the basis of the Monte Carlo method. The two methods can only reflect the overall effects of the uncertain parameters, and the results cannot be screened for a certain parameter's influence and contribution. In this study, based on the dynamic analyses of the floor response spectra of NPPs, a comprehensive index of the assessed impact for various uncertain parameters is presented and recommended, including the correlation coefficient, the regression slope coefficient and Tornado swing. To compensate for the lack of guidance in the NPP seismic standards, the proposed method can effectively be used to evaluate the contributions of various parameters from the aspects &sensitivity, acuity and statistical swing correlations. Finally, examples are provided to verify the set of indicators from systematic and intuitive perspectives, such as the uncertainty of the impact of the structure parameters and the contribution to the FRS of NPPs. The index is sensitive to different types of parameters, which provides a new technique for evaluating the anti-seismic parameters required for NPPs.展开更多
The State Nuclear Power Technology Corporation (SNPTC), which is responsible for the development of third-generation nuclear power technology in China, has completed the preliminary designs
An intelligent design software system for the power station pipe-prefabrication (PPDS) has been developed in the paper,which is taking pipe material database as core and developed on the platform of AutoCAD and Borlan...An intelligent design software system for the power station pipe-prefabrication (PPDS) has been developed in the paper,which is taking pipe material database as core and developed on the platform of AutoCAD and Borland C++. Whereas design and construction of power plants in China belong to different deportments,the input and recognition problem of pipeline system disposition chart must be solved firstly for the prefabrication design.Based on AI technology,the model fast building subsystem (MFBS) was established for entering the 3-D pipeline graph data,so that the problems of reconstruction of pipeline digital model and computer identification of original 2-D design data can be solved. The optimization design scheme in the pipe-prefabrication process has been studied and also the corresponding algorithm put forward.The technique and system mentioned can effectively raise the pipe-prefabrication design quality and efficiency in the con- struction of large scale power plants,reduce the period of design and the waste of raw material.PPCADS has still offered the functions such as the construction design for pipeline prefabricated process,the detailing drawing for manufacturing pipe section and automatic generating the technical files for the completed project.展开更多
基金Research Fund for Youth in Jiangsu Provincial Meteorological Bureau,China(Q201007)
文摘DCS (distributed control system) plays a decisive role in the overall operation of a nuclear power plant. If DCS fails, it will seriously affect the normal production of nuclear power plant, causing great losses. So it is very important to take perfect lightning protection measures on DCS of the nuclear power plant. In this paper, according to the actual situation of DCS in a nuclear power plant, by controlling lightning point, securely booting lightning into the ground network, improving low-resistance ground network, eliminating ground loops, determining the safety space, surge protection of power and signal, a set of complete lightning protection design scheme was systematically put forward. Some specific lightning protection measures were highlighted, such as the DCS grounding, equipotential bonds and shields, and some specific considerations were put forward. All of these could offer reference in the practical application.
文摘A nuclear power plant real-time engineering simulator was developed based on general-purpose ther- mal-hydraulic system simulation code RELAP5. It mainly consists of three parts:improved thermal-hydraulic system simulation code RELAP5,control and protection system and human-machine interface. A normal transient of CHASHMA nuclear power plant turbine step load change from 100% to 90% of full power,was simulated by the en- gineering simulator as an application example. This paper presents structure and main features of the engineering simulator,and application results are shown and discussed.
基金funded by the Basic Science Research Foundation of IEM(Grant No.2006A02)the National Natural Sciences Foundation of China (90715038)
文摘The main technical backgrounds and requirements are introduced with regard to earthquake ground motion design parameters in several domestic and American standards,codes and guides involved in the seismic analysis and design activities of nuclear power plants in China.Based on the research results from site seismic safety evaluation of domestic nuclear power plant projects in the last years,characteristics and differences of site specific design spectra are analyzed in comparison with standard response spectra,and the suitability of standard response spectra for domestic nuclear power plant projects is discussed.
基金supported by the Nationam Natural Science Foundation of China(Grant No.50679076)Office of State Flood Control and Drought Relief Headquarters of China(Grant No.20060120)
文摘With the global warming and sea level rising, it is widely recognized that there is an increasing tendency of typhoon occurrence frequency and intensity. The defenses code against typhoon attacks for nuclear power plant should be calibrated because of the increasing threat of typhoon disaster and severe consequences. This paper discusses the probabilistic approach of definitions about "probable maximum typhoon" and "probable maximum storm surge" in nuclear safety regulations of China and has made some design code calibrations by use of a newly proposed Double Layer Nested Mtdti-objective Probability Model (DLNMPM).
基金the State Key Program of the National Natural Science Fundation of China under Grant No.51138001the Science Fund for Creative Research Groups of the National Natural Science Foundation of China under Grant No.51421064+2 种基金the State Key Laboratory of Coastal and Offshore Engineering Young Scholars Innovation Fund(LY1609)the Fundamental Research Funds for the Central Universities under Grant No.DUT15TD17the Open Research Fund of Hunan Province Key Laboratory of Key Technologies for Water Power Resources Development under Grant No.PKLHD20130
文摘: Consideration of the dynamic effects of the site and structural parameter uncertainty is required by the standards for nuclear power plants (NPPs) in most countries. The anti-seismic standards provide two basic methods to analyze parameter uncertainty. Directly manually dealing with the calculated floor response spectra (FRS) values of deterministic approaches is the first method. The second method is to perform probability statistical analysis of the FRS results on the basis of the Monte Carlo method. The two methods can only reflect the overall effects of the uncertain parameters, and the results cannot be screened for a certain parameter's influence and contribution. In this study, based on the dynamic analyses of the floor response spectra of NPPs, a comprehensive index of the assessed impact for various uncertain parameters is presented and recommended, including the correlation coefficient, the regression slope coefficient and Tornado swing. To compensate for the lack of guidance in the NPP seismic standards, the proposed method can effectively be used to evaluate the contributions of various parameters from the aspects &sensitivity, acuity and statistical swing correlations. Finally, examples are provided to verify the set of indicators from systematic and intuitive perspectives, such as the uncertainty of the impact of the structure parameters and the contribution to the FRS of NPPs. The index is sensitive to different types of parameters, which provides a new technique for evaluating the anti-seismic parameters required for NPPs.
文摘The State Nuclear Power Technology Corporation (SNPTC), which is responsible for the development of third-generation nuclear power technology in China, has completed the preliminary designs
文摘An intelligent design software system for the power station pipe-prefabrication (PPDS) has been developed in the paper,which is taking pipe material database as core and developed on the platform of AutoCAD and Borland C++. Whereas design and construction of power plants in China belong to different deportments,the input and recognition problem of pipeline system disposition chart must be solved firstly for the prefabrication design.Based on AI technology,the model fast building subsystem (MFBS) was established for entering the 3-D pipeline graph data,so that the problems of reconstruction of pipeline digital model and computer identification of original 2-D design data can be solved. The optimization design scheme in the pipe-prefabrication process has been studied and also the corresponding algorithm put forward.The technique and system mentioned can effectively raise the pipe-prefabrication design quality and efficiency in the con- struction of large scale power plants,reduce the period of design and the waste of raw material.PPCADS has still offered the functions such as the construction design for pipeline prefabricated process,the detailing drawing for manufacturing pipe section and automatic generating the technical files for the completed project.