In pit excavation,cement is introduced into ground by deep mixing method to form an improved soil raft below final formation level to diminish deflection of retaining wall and effect on surrounding structure.Owning to...In pit excavation,cement is introduced into ground by deep mixing method to form an improved soil raft below final formation level to diminish deflection of retaining wall and effect on surrounding structure.Owning to complicated site conditions and improper workmanship,there are always some regions left untreated in the embedded improved soil raft.In this work,Several schemes of cement-soil mixed piles arrangement are modeled in order to discuss the effect of different cement-soil reinforced regions on protection for adjacent running tunnels.Finite element results show that:when lateral regions above tunnels are not enhanced by cement-soil mixed piles,effect of enlarging vertical enhanced regions around tunnels on diminishing lateral displacement of tunnel is really small;enhancing the lateral regions next to retaining wall is more effective in reducing the deflection of tunnel and retaining wall;uplifting of tunnel under the middle pit mainly depends on lateral reinforced regions and lateral displacements of retaining wall;as cement-soil mixed piles near retaining wall in east pit are removed during east pit excavation,effect of cement-soil mixed piles in east pit on reducing the final wall deflection can be neglected;upward shaft resistances are exerted along left side of diaphragm wall during excavation,which helps to reduce the wall deflection;positive effect of single-head cement-soil mixed piles in east pit is to decreasing the uplifting of soil inside east pit.Double-head cement-soil mixed piles arranged in"T"shape decrease the effect of east pit excavation on tunnels under middle pit apparently.展开更多
文摘为研究湿陷性黄土地区DDC法(孔内深层强夯法)进行地基处理时合理桩间距的控制问题,在代表性场地采用不同桩间距处理地基,对其处理前后地基土的干密度和湿陷系数等指标做了比对,并分析其挤密效果,得出当桩间距为预成孔直径d的3倍时,地基土受到挤密所产生的侧向力是相对均匀的,当桩间距>3.0d时,三桩间土体的挤密效果明显较两桩间差,故挤密法处理湿陷性黄土地基时的有效挤密区为3.0d,即DDC处理地基时的合理桩间距为3.0 d.
基金Supported by the National Natural Science Foundation of China(Grant No.51208071)
文摘In pit excavation,cement is introduced into ground by deep mixing method to form an improved soil raft below final formation level to diminish deflection of retaining wall and effect on surrounding structure.Owning to complicated site conditions and improper workmanship,there are always some regions left untreated in the embedded improved soil raft.In this work,Several schemes of cement-soil mixed piles arrangement are modeled in order to discuss the effect of different cement-soil reinforced regions on protection for adjacent running tunnels.Finite element results show that:when lateral regions above tunnels are not enhanced by cement-soil mixed piles,effect of enlarging vertical enhanced regions around tunnels on diminishing lateral displacement of tunnel is really small;enhancing the lateral regions next to retaining wall is more effective in reducing the deflection of tunnel and retaining wall;uplifting of tunnel under the middle pit mainly depends on lateral reinforced regions and lateral displacements of retaining wall;as cement-soil mixed piles near retaining wall in east pit are removed during east pit excavation,effect of cement-soil mixed piles in east pit on reducing the final wall deflection can be neglected;upward shaft resistances are exerted along left side of diaphragm wall during excavation,which helps to reduce the wall deflection;positive effect of single-head cement-soil mixed piles in east pit is to decreasing the uplifting of soil inside east pit.Double-head cement-soil mixed piles arranged in"T"shape decrease the effect of east pit excavation on tunnels under middle pit apparently.