The efficiency of businesses is often hindered by the challenges encountered in traditional Supply Chain Manage-ment(SCM),which is characterized by elevated risks due to inadequate accountability and transparency.To a...The efficiency of businesses is often hindered by the challenges encountered in traditional Supply Chain Manage-ment(SCM),which is characterized by elevated risks due to inadequate accountability and transparency.To address these challenges and improve operations in green manufacturing,optimization algorithms play a crucial role in supporting decision-making processes.In this study,we propose a solution to the green lot size optimization issue by leveraging bio-inspired algorithms,notably the Stork Optimization Algorithm(SOA).The SOA draws inspiration from the hunting and winter migration strategies employed by storks in nature.The theoretical framework of SOA is elaborated and mathematically modeled through two distinct phases:exploration,based on migration simulation,and exploitation,based on hunting strategy simulation.To tackle the green lot size optimization issue,our methodology involved gathering real-world data,which was then transformed into a simplified function with multiple constraints aimed at optimizing total costs and minimizing CO_(2) emissions.This function served as input for the SOA model.Subsequently,the SOA model was applied to identify the optimal lot size that strikes a balance between cost-effectiveness and sustainability.Through extensive experimentation,we compared the performance of SOA with twelve established metaheuristic algorithms,consistently demonstrating that SOA outperformed the others.This study’s contribution lies in providing an effective solution to the sustainable lot-size optimization dilemma,thereby reducing environmental impact and enhancing supply chain efficiency.The simulation findings underscore that SOA consistently achieves superior outcomes compared to existing optimization methodologies,making it a promising approach for green manufacturing and sustainable supply chain management.展开更多
Despite cities being recognized as being potential sources of microplastic pollution to the wider environment, most surveys of COVID-19 plastic-based litter have been undertaken through linear transects of marine beac...Despite cities being recognized as being potential sources of microplastic pollution to the wider environment, most surveys of COVID-19 plastic-based litter have been undertaken through linear transects of marine beaches. For the far fewer number of studies conducted on inland and urban locations, the site-specific focus has primarily been surveys along the length of streets. The present study is the first to specifically assess the standing stock (i.e., moment-in-time) of littered face masks for the entire surface area of urban parking lots. The density of face masks in 50 parking lots in a Canadian coastal town (0.00054 m2 ± 0.00051 m2) was found to be significantly greater than the background level of littering of town streets. Face mask density was significantly related to visitation “usage” of parking lots as gauged by the areal size of the lots and of their onsite buildings, as well as the number of vehicles present. Neither parking lot typology nor estimates of inferred export (various measures of wind exposure) and entrapment (various metrics of obstruction) of face masks had a significant influence on the extent of whole-lot littering. In consequence, modelling of the potential input of mask-derived microplastics to the marine environment from coastal communities can use the areal density of face masks found here in association with the total surface area of lots for individual municipalities as determined through GIS analysis.展开更多
In recent years,disorderly parking and difficult charging of electric bicycles have been challenges in urban management.The rapid growth of electric bicycles is in contradiction with the lack of dedicated parking spac...In recent years,disorderly parking and difficult charging of electric bicycles have been challenges in urban management.The rapid growth of electric bicycles is in contradiction with the lack of dedicated parking spaces and charging service facilities in towns and villages.To solve the issue of parking and charging electric bicycles in limited urban and rural spaces,prefabricated building technology is applied to the design of a multi-story electric bicycle parking lot.The multi-story prefabricated electric bicycle parking lot is utilized in urban and rural planning and design to upgrade parking facilities in old urban areas,land-constrained commercial areas,as well as counties,towns,and rural areas with inadequate municipal facilities.Multi-story prefabricated electric bicycle parking lots are the application exploration of industrial buildings,and promote the high-quality development planning and construction of towns and counties and villages.Compared with the single-story metal charging station,the multi-story assembled electric bicycle parking lot has the characteristics of integrating parking and charging,being more durable and safer in structure,accommodating a large number of vehicles,and improving the space utilization rate.展开更多
In this paper we shall extend the paper [1] to a separate Taylor's Theorem with respect to a lot of centers, namely Newton's Theorem Of a lot of centers. From it we obtain the analogous results in the paper [2...In this paper we shall extend the paper [1] to a separate Taylor's Theorem with respect to a lot of centers, namely Newton's Theorem Of a lot of centers. From it we obtain the analogous results in the paper [2]. namely an interpolation formula of the difference of higher order. Finally we give their applications.展开更多
The capacitated lot sizing and scheduling problem that involves indetermining the production amounts and release dates for several items over a given planning horizonare given to meet dynamic order demand without incu...The capacitated lot sizing and scheduling problem that involves indetermining the production amounts and release dates for several items over a given planning horizonare given to meet dynamic order demand without incurring backloggings. The problem consideringovertime capacity is studied. The mathematical model is presented, and a genetic algorithm (GA)approach is developed to solve the problem. The initial solutions are generated after usingheuristic method. Capacity balancing procedure is employed to stipulate the feasibility of thesolutions. In addition, a technique based on Tabu search (TS) is inserted into the genetic algorithmdeal with the scheduled overtime and help the convergence of algorithm. Computational simulation isconducted to test the efficiency of the proposed hybrid approach, which turns out to improve boththe solution quality and execution speed.展开更多
Studies show that supply chain cooperation improves supply chain performance. However, it remains a challenge to develop and implement the realistic supply chain cooperation scheme. We investigate a two-echelon supply...Studies show that supply chain cooperation improves supply chain performance. However, it remains a challenge to develop and implement the realistic supply chain cooperation scheme. We investigate a two-echelon supply chain planning problem with capacity acquisition decision under asymmetric cost and demand information. A simple negotiation-based coordination mechanism is developed to synchronize production/order strategies of a supplier and a buyer. The coordination scheme shows how the supplier and the buyer modify their production and order policy in order to find a joint economic lot sizing plan, which saves the overall supply chain cost. The allocation of the cooperation benefit is determined by negotiation. Due to the complexity of the multiple periods, multiple level supply chain lot sizing with capacity decision, a heuristic algorithm is developed to find coordination solutions. Finally, the results of the numerical study indicate the performance of supply chain coordination scheme.展开更多
In flexible job-shop batch scheduling problem, the optimal lot-size of different process is not always the same because of different processing time and set-up time. Even for the same process of the same workpiece, th...In flexible job-shop batch scheduling problem, the optimal lot-size of different process is not always the same because of different processing time and set-up time. Even for the same process of the same workpiece, the choice of machine also affects the optimal lot-size. In addition, different choices of lot-size between the constrained processes will impact the manufacture efficiency. Considering that each process has its own appropriate lot-size, we put forward the concept of scheduling with lot-splitting based on process and set up the scheduling model of lot-splitting to critical path process as the core. The model could update the set of batch process and machine selection strategy dynamically to determine processing route and arrange proper lot-size for different processes, to achieve the purpose of optimizing the makespan and reducing the processing batches effectively. The experiment results show that, comparing with lot-splitting scheduling scheme based on workpiece, this model optimizes the makespan and improves the utilization efficiency of the machine. It also greatly decreases the machined batches (42%) and reduces the complexity of shop scheduling production management.展开更多
In order to solve the problem that the drivers can't find the optimal parking lot timely,a reservation based optimal parking lot recommendation model in Internet of Vehicle(IoV) environment is designed.Based on th...In order to solve the problem that the drivers can't find the optimal parking lot timely,a reservation based optimal parking lot recommendation model in Internet of Vehicle(IoV) environment is designed.Based on the users oriented parking information recommendation system,the model considers subjective demands of drivers comprehensively,makes a deeply analysis of the evaluation indicators.This recommendation model uses a phased selection method to calculate the optimal objective parking lot.The first stage is screening which based on the users' subjective parking demands;the second stage is processing the candidate parking lots through multiple attribute decision making.Simulation experiments show that this model can effectively solve the problems encountered in the process of finding optimal parking lot,save the driver's parking time and parking costs and also improve the overall utilization of parking facilities to ease the traffic congestion caused by vehicles parked patrol.展开更多
This paper presents an economic lot-sizing problem with perishable inventory and general economies of scale cost functions. For the case with backlogging allowed, a mathematical model is formulated, and several proper...This paper presents an economic lot-sizing problem with perishable inventory and general economies of scale cost functions. For the case with backlogging allowed, a mathematical model is formulated, and several properties of the optimal solutions are explored. With the help of these optimality properties, a polynomial time approximation algorithm is developed by a new method. The new method adopts a shift technique to obtain a feasible solution of subproblem and takes the optimal solution of the subproblem as an approximation solution of our problem. The worst case performance for the approximation algorithm is proven to be (4√2 + 5)/7. Finally, an instance illustrates that the bound is tight.展开更多
The paper develops an algorithm that solves economic lot size problem in O(n~2) time in the Wagner-Whitin case. The algorithm is based on the standard dynamic programming approach which requires the computation of the...The paper develops an algorithm that solves economic lot size problem in O(n~2) time in the Wagner-Whitin case. The algorithm is based on the standard dynamic programming approach which requires the computation of the maximal relative benefit for some possible subplans of the production plan. In this algorithm the authors have studied the forward property and decomposition properties which can make computation easy. The proposed algorithm appears to perform quite reasonably for practical application.展开更多
A mathematical model to determine the optimal production lot size for a deteriorating production system under an extended product inspection policy is developed. The last-K product inspection policy is considered so t...A mathematical model to determine the optimal production lot size for a deteriorating production system under an extended product inspection policy is developed. The last-K product inspection policy is considered so that the nonconforming items can be reduced, under which the last K products in a production lot are inspected and the nonconforming items from those inspected are reworked. Consider that the products produced towards the end of a production lot are more likely to be nonconforming, is proposed an extended product inspection policy for a deteriorating production system. That is, in a production lot, product inspections are performed among the middle K1 items and after inspections, all of the last K2 products are directly reworked without inspections. Our objective here is the joint optimization of the production lot size and the corresponding extended inspection policy such that the expected total cost per unit time is minimized. Since there is no closed form expression for our optimal policy, the existence for the optimal production inspection policy and an upper bound for the optimal lot size are obtained. Furthermore, an efficient solution procedure is provided to search for the optimal policy. Finally, numerical examples are given to illustrate the proposed model and indicate that the expected total cost per unit time of our product inspection model is less than that of the last-K inspection policy.展开更多
In order to study the capacitated lot sizing problem for a supply chain of corporate multi-location factories to minimize the total costs of production, inventory and transportation under the system capacity restricti...In order to study the capacitated lot sizing problem for a supply chain of corporate multi-location factories to minimize the total costs of production, inventory and transportation under the system capacity restriction and product due date, while at the same time considering the menu distributed balance, the mathematical programming models are decomposed and reduced from the 3 levels into 2 levels according to the idea of just-in-time production. In order to overcome the premature convergence of ACA (ant colony algorithms), the idea of mute operation is adopted in genetic algorithms and a PACA (parallel ant colony algorithms) is proposed for supply chain optimization. Finally, an illustrative example is given, and a comparison is made with standard BAB (Branch and Bound) and PACA approach. The result shows that the latter is more effective and promising.展开更多
In the future smart cities,parking lots(PLs)can accommodate hundreds of electric vehicles(EVs)at the same time.This trend creates an opportunity for PLs to serve as a potential flexibility resource,considering growing...In the future smart cities,parking lots(PLs)can accommodate hundreds of electric vehicles(EVs)at the same time.This trend creates an opportunity for PLs to serve as a potential flexibility resource,considering growing penetration of EVs and integration of distributed energy resources DER(such as photovoltaic and energy storages).Given this background,this paper proposes a comprehensive evaluation framework to investigate the potential role of DER-integrated PLs(DPL)with the capability of vehicle-to-grid(V2G)in improving the reliability of the distribution network.For this aim,first,an overview for the distribution system with DPLs is provided.Then,a generic model for the available generation capacity(AGC)of DPLs with consideration of EV scheduling strategy is developed.On the above basis,an iterative-based algorithm leveraging sequential Monte Carlo simulation is presented to quantify the contribution of DPLs to the reliability of the system.In order to verify the effectiveness of the proposed method,a series of numerical studies are carried out.The simulation results show that the integration of DPLs with the V2G capability could help to improve the reliability performance of distribution grid to a great extent and reduce the adverse impact incurred by EV accommodation,if utilized properly.展开更多
Using CiteSpace visualization software,literature research on roof parking lot in recent 20 years is analyzed,and the research direction and development of the relevant papers are integrated and induced.From utilizati...Using CiteSpace visualization software,literature research on roof parking lot in recent 20 years is analyzed,and the research direction and development of the relevant papers are integrated and induced.From utilization development,roof greening and technical practice,overall consideration and grasp of the feasibility of roof parking lot are conducted.Realization paths of two kinds of roof parking lots are provided:suspended PRT stereo parking lot and telescopic rail elevator,and it is committed to providing feasible suggestions and reference for future roof parking lot.展开更多
Our research focuses on the development of two cooperative approaches for resolution of the multi-item capacitated lot-sizing problems with time windows and setup times (MICLSP-TW-ST). In this paper we combine variabl...Our research focuses on the development of two cooperative approaches for resolution of the multi-item capacitated lot-sizing problems with time windows and setup times (MICLSP-TW-ST). In this paper we combine variable neighborhood search and accurate mixed integer programming (VNS-MIP) to solve MICLSP-TW-ST. It concerns so a particularly important and difficult problem in production planning. This problem is NP-hard in the strong sense. Moreover, it is very difficult to solve with an exact method;it is for that reason we have made use of the approximate methods. We improved the variable neighborhood search (VNS) algorithm, which is efficient for solving hard combinatorial optimization problems. This problem can be viewed as an optimization problem with mixed variables (binary variables and real variables). The new VNS algorithm was tested against 540 benchmark problems. The performance of most of our approaches was satisfactory and performed better than the algorithms already proposed in the literature.展开更多
Having been named executor of her late boyfriend's estate. Oedipa Maas. the protagonist, a housewife, started her journey and soon found herself enmeshed in a worldwide conspiracy, meeting some extremely interesting ...Having been named executor of her late boyfriend's estate. Oedipa Maas. the protagonist, a housewife, started her journey and soon found herself enmeshed in a worldwide conspiracy, meeting some extremely interesting and absurd characters, quite beyond her imagination and self-knowledge. These characters came from different walks of life and social classes, but all have some defects and deficiencies in one way or another, both physically or mentally. Meanwhile, they seemed to be busy involving themselves in some ridiculous and meaningless tasks or missions of work or life, lingering and struggling, with uncertainty and hopelessness for the future. In this way. Pynchon's The Crying of Lot 49 presents us a chaotic and meaningless postmodern society which gradually turns into decadence and entropy. These absurd and pathetic characters were exactly, without doubt, both products and victims of this materialized, alienated and depressing postmodern society. The fiction is humorous, obscure, and very complicated, involving politics, history., religion, science and art etc.. This paper is to analyse the absurdity of some main characters in this fiction.展开更多
基金This research is funded by the Science Committee of the Ministry of Science and Higher Education of the Republic of Kazakhstan,Grant No.AP19674517.
文摘The efficiency of businesses is often hindered by the challenges encountered in traditional Supply Chain Manage-ment(SCM),which is characterized by elevated risks due to inadequate accountability and transparency.To address these challenges and improve operations in green manufacturing,optimization algorithms play a crucial role in supporting decision-making processes.In this study,we propose a solution to the green lot size optimization issue by leveraging bio-inspired algorithms,notably the Stork Optimization Algorithm(SOA).The SOA draws inspiration from the hunting and winter migration strategies employed by storks in nature.The theoretical framework of SOA is elaborated and mathematically modeled through two distinct phases:exploration,based on migration simulation,and exploitation,based on hunting strategy simulation.To tackle the green lot size optimization issue,our methodology involved gathering real-world data,which was then transformed into a simplified function with multiple constraints aimed at optimizing total costs and minimizing CO_(2) emissions.This function served as input for the SOA model.Subsequently,the SOA model was applied to identify the optimal lot size that strikes a balance between cost-effectiveness and sustainability.Through extensive experimentation,we compared the performance of SOA with twelve established metaheuristic algorithms,consistently demonstrating that SOA outperformed the others.This study’s contribution lies in providing an effective solution to the sustainable lot-size optimization dilemma,thereby reducing environmental impact and enhancing supply chain efficiency.The simulation findings underscore that SOA consistently achieves superior outcomes compared to existing optimization methodologies,making it a promising approach for green manufacturing and sustainable supply chain management.
文摘Despite cities being recognized as being potential sources of microplastic pollution to the wider environment, most surveys of COVID-19 plastic-based litter have been undertaken through linear transects of marine beaches. For the far fewer number of studies conducted on inland and urban locations, the site-specific focus has primarily been surveys along the length of streets. The present study is the first to specifically assess the standing stock (i.e., moment-in-time) of littered face masks for the entire surface area of urban parking lots. The density of face masks in 50 parking lots in a Canadian coastal town (0.00054 m2 ± 0.00051 m2) was found to be significantly greater than the background level of littering of town streets. Face mask density was significantly related to visitation “usage” of parking lots as gauged by the areal size of the lots and of their onsite buildings, as well as the number of vehicles present. Neither parking lot typology nor estimates of inferred export (various measures of wind exposure) and entrapment (various metrics of obstruction) of face masks had a significant influence on the extent of whole-lot littering. In consequence, modelling of the potential input of mask-derived microplastics to the marine environment from coastal communities can use the areal density of face masks found here in association with the total surface area of lots for individual municipalities as determined through GIS analysis.
文摘In recent years,disorderly parking and difficult charging of electric bicycles have been challenges in urban management.The rapid growth of electric bicycles is in contradiction with the lack of dedicated parking spaces and charging service facilities in towns and villages.To solve the issue of parking and charging electric bicycles in limited urban and rural spaces,prefabricated building technology is applied to the design of a multi-story electric bicycle parking lot.The multi-story prefabricated electric bicycle parking lot is utilized in urban and rural planning and design to upgrade parking facilities in old urban areas,land-constrained commercial areas,as well as counties,towns,and rural areas with inadequate municipal facilities.Multi-story prefabricated electric bicycle parking lots are the application exploration of industrial buildings,and promote the high-quality development planning and construction of towns and counties and villages.Compared with the single-story metal charging station,the multi-story assembled electric bicycle parking lot has the characteristics of integrating parking and charging,being more durable and safer in structure,accommodating a large number of vehicles,and improving the space utilization rate.
文摘In this paper we shall extend the paper [1] to a separate Taylor's Theorem with respect to a lot of centers, namely Newton's Theorem Of a lot of centers. From it we obtain the analogous results in the paper [2]. namely an interpolation formula of the difference of higher order. Finally we give their applications.
基金This project is supported by National Natural Science Foundation of China (No.70071017, No.60074011) the Open-lab of Manufacturing System Engineering, Xi'an Jiaotong University, China.
文摘The capacitated lot sizing and scheduling problem that involves indetermining the production amounts and release dates for several items over a given planning horizonare given to meet dynamic order demand without incurring backloggings. The problem consideringovertime capacity is studied. The mathematical model is presented, and a genetic algorithm (GA)approach is developed to solve the problem. The initial solutions are generated after usingheuristic method. Capacity balancing procedure is employed to stipulate the feasibility of thesolutions. In addition, a technique based on Tabu search (TS) is inserted into the genetic algorithmdeal with the scheduled overtime and help the convergence of algorithm. Computational simulation isconducted to test the efficiency of the proposed hybrid approach, which turns out to improve boththe solution quality and execution speed.
基金supported by the National Natural Science Foundation of China (70701008)
文摘Studies show that supply chain cooperation improves supply chain performance. However, it remains a challenge to develop and implement the realistic supply chain cooperation scheme. We investigate a two-echelon supply chain planning problem with capacity acquisition decision under asymmetric cost and demand information. A simple negotiation-based coordination mechanism is developed to synchronize production/order strategies of a supplier and a buyer. The coordination scheme shows how the supplier and the buyer modify their production and order policy in order to find a joint economic lot sizing plan, which saves the overall supply chain cost. The allocation of the cooperation benefit is determined by negotiation. Due to the complexity of the multiple periods, multiple level supply chain lot sizing with capacity decision, a heuristic algorithm is developed to find coordination solutions. Finally, the results of the numerical study indicate the performance of supply chain coordination scheme.
基金Supported by National Key Technology R&D Program(No.2013BAJ06B)
文摘In flexible job-shop batch scheduling problem, the optimal lot-size of different process is not always the same because of different processing time and set-up time. Even for the same process of the same workpiece, the choice of machine also affects the optimal lot-size. In addition, different choices of lot-size between the constrained processes will impact the manufacture efficiency. Considering that each process has its own appropriate lot-size, we put forward the concept of scheduling with lot-splitting based on process and set up the scheduling model of lot-splitting to critical path process as the core. The model could update the set of batch process and machine selection strategy dynamically to determine processing route and arrange proper lot-size for different processes, to achieve the purpose of optimizing the makespan and reducing the processing batches effectively. The experiment results show that, comparing with lot-splitting scheduling scheme based on workpiece, this model optimizes the makespan and improves the utilization efficiency of the machine. It also greatly decreases the machined batches (42%) and reduces the complexity of shop scheduling production management.
基金partially supported by the National Natural Science Foundation of China under Grants No.60903176the Provincial Natural Science Foundation of Shandong under Grants No.ZR2012FM010,No.ZR2010FQ028+1 种基金the Program for Youth science and technology starfund of Jinan No.TNK1108the Sub-Project of the National Key Technology R&D Program No.2012BAF12B07-3
文摘In order to solve the problem that the drivers can't find the optimal parking lot timely,a reservation based optimal parking lot recommendation model in Internet of Vehicle(IoV) environment is designed.Based on the users oriented parking information recommendation system,the model considers subjective demands of drivers comprehensively,makes a deeply analysis of the evaluation indicators.This recommendation model uses a phased selection method to calculate the optimal objective parking lot.The first stage is screening which based on the users' subjective parking demands;the second stage is processing the candidate parking lots through multiple attribute decision making.Simulation experiments show that this model can effectively solve the problems encountered in the process of finding optimal parking lot,save the driver's parking time and parking costs and also improve the overall utilization of parking facilities to ease the traffic congestion caused by vehicles parked patrol.
基金supported by National Natural Science Foundation of China (No. 10671108 and 70971076)Found for the Doctoral Program of Higher Education of Ministry of Education of China (No. 20070446001)+1 种基金Innovation Planning Project of Shandong Province (No. SDYY06034)Foundation of Qufu Normal University (No. XJZ200849)
文摘This paper presents an economic lot-sizing problem with perishable inventory and general economies of scale cost functions. For the case with backlogging allowed, a mathematical model is formulated, and several properties of the optimal solutions are explored. With the help of these optimality properties, a polynomial time approximation algorithm is developed by a new method. The new method adopts a shift technique to obtain a feasible solution of subproblem and takes the optimal solution of the subproblem as an approximation solution of our problem. The worst case performance for the approximation algorithm is proven to be (4√2 + 5)/7. Finally, an instance illustrates that the bound is tight.
文摘The paper develops an algorithm that solves economic lot size problem in O(n~2) time in the Wagner-Whitin case. The algorithm is based on the standard dynamic programming approach which requires the computation of the maximal relative benefit for some possible subplans of the production plan. In this algorithm the authors have studied the forward property and decomposition properties which can make computation easy. The proposed algorithm appears to perform quite reasonably for practical application.
基金supported by the National Natural Science Foundation of China(60874034).
文摘A mathematical model to determine the optimal production lot size for a deteriorating production system under an extended product inspection policy is developed. The last-K product inspection policy is considered so that the nonconforming items can be reduced, under which the last K products in a production lot are inspected and the nonconforming items from those inspected are reworked. Consider that the products produced towards the end of a production lot are more likely to be nonconforming, is proposed an extended product inspection policy for a deteriorating production system. That is, in a production lot, product inspections are performed among the middle K1 items and after inspections, all of the last K2 products are directly reworked without inspections. Our objective here is the joint optimization of the production lot size and the corresponding extended inspection policy such that the expected total cost per unit time is minimized. Since there is no closed form expression for our optimal policy, the existence for the optimal production inspection policy and an upper bound for the optimal lot size are obtained. Furthermore, an efficient solution procedure is provided to search for the optimal policy. Finally, numerical examples are given to illustrate the proposed model and indicate that the expected total cost per unit time of our product inspection model is less than that of the last-K inspection policy.
文摘In order to study the capacitated lot sizing problem for a supply chain of corporate multi-location factories to minimize the total costs of production, inventory and transportation under the system capacity restriction and product due date, while at the same time considering the menu distributed balance, the mathematical programming models are decomposed and reduced from the 3 levels into 2 levels according to the idea of just-in-time production. In order to overcome the premature convergence of ACA (ant colony algorithms), the idea of mute operation is adopted in genetic algorithms and a PACA (parallel ant colony algorithms) is proposed for supply chain optimization. Finally, an illustrative example is given, and a comparison is made with standard BAB (Branch and Bound) and PACA approach. The result shows that the latter is more effective and promising.
基金financially supported by the National Social Science Fund of China(No.19ZDA081)Fundamental Research Funds for the Central Universities(No.2020MS067).
文摘In the future smart cities,parking lots(PLs)can accommodate hundreds of electric vehicles(EVs)at the same time.This trend creates an opportunity for PLs to serve as a potential flexibility resource,considering growing penetration of EVs and integration of distributed energy resources DER(such as photovoltaic and energy storages).Given this background,this paper proposes a comprehensive evaluation framework to investigate the potential role of DER-integrated PLs(DPL)with the capability of vehicle-to-grid(V2G)in improving the reliability of the distribution network.For this aim,first,an overview for the distribution system with DPLs is provided.Then,a generic model for the available generation capacity(AGC)of DPLs with consideration of EV scheduling strategy is developed.On the above basis,an iterative-based algorithm leveraging sequential Monte Carlo simulation is presented to quantify the contribution of DPLs to the reliability of the system.In order to verify the effectiveness of the proposed method,a series of numerical studies are carried out.The simulation results show that the integration of DPLs with the V2G capability could help to improve the reliability performance of distribution grid to a great extent and reduce the adverse impact incurred by EV accommodation,if utilized properly.
文摘Using CiteSpace visualization software,literature research on roof parking lot in recent 20 years is analyzed,and the research direction and development of the relevant papers are integrated and induced.From utilization development,roof greening and technical practice,overall consideration and grasp of the feasibility of roof parking lot are conducted.Realization paths of two kinds of roof parking lots are provided:suspended PRT stereo parking lot and telescopic rail elevator,and it is committed to providing feasible suggestions and reference for future roof parking lot.
文摘Our research focuses on the development of two cooperative approaches for resolution of the multi-item capacitated lot-sizing problems with time windows and setup times (MICLSP-TW-ST). In this paper we combine variable neighborhood search and accurate mixed integer programming (VNS-MIP) to solve MICLSP-TW-ST. It concerns so a particularly important and difficult problem in production planning. This problem is NP-hard in the strong sense. Moreover, it is very difficult to solve with an exact method;it is for that reason we have made use of the approximate methods. We improved the variable neighborhood search (VNS) algorithm, which is efficient for solving hard combinatorial optimization problems. This problem can be viewed as an optimization problem with mixed variables (binary variables and real variables). The new VNS algorithm was tested against 540 benchmark problems. The performance of most of our approaches was satisfactory and performed better than the algorithms already proposed in the literature.
文摘Having been named executor of her late boyfriend's estate. Oedipa Maas. the protagonist, a housewife, started her journey and soon found herself enmeshed in a worldwide conspiracy, meeting some extremely interesting and absurd characters, quite beyond her imagination and self-knowledge. These characters came from different walks of life and social classes, but all have some defects and deficiencies in one way or another, both physically or mentally. Meanwhile, they seemed to be busy involving themselves in some ridiculous and meaningless tasks or missions of work or life, lingering and struggling, with uncertainty and hopelessness for the future. In this way. Pynchon's The Crying of Lot 49 presents us a chaotic and meaningless postmodern society which gradually turns into decadence and entropy. These absurd and pathetic characters were exactly, without doubt, both products and victims of this materialized, alienated and depressing postmodern society. The fiction is humorous, obscure, and very complicated, involving politics, history., religion, science and art etc.. This paper is to analyse the absurdity of some main characters in this fiction.