The purpose of this study is to detail the ecological characteristics of phytoplankton in waters around the Daya Bay Nuclear Power Station in Guangdong (GNPS) (Fig. 1) in spring, the bloom period of algae. The collect...The purpose of this study is to detail the ecological characteristics of phytoplankton in waters around the Daya Bay Nuclear Power Station in Guangdong (GNPS) (Fig. 1) in spring, the bloom period of algae. The collections with a small temporal scale of every three days were made during 30 cruises from March to May in 1987. Such an investigation has never been carried out before in China except that the seasonal distribution and composition of phytoplankton in these regions were reported in展开更多
The Daya Bay Nuclear Power Plant in South China’s Guangdong Province began its second refueling and maintenance work for its Unit 1 on March 31, 1996. Apart from the regular work required by the plant’s annual check...The Daya Bay Nuclear Power Plant in South China’s Guangdong Province began its second refueling and maintenance work for its Unit 1 on March 31, 1996. Apart from the regular work required by the plant’s annual check- up plan, all of the present guide tubes of the control rods in Unit I will be replaced by the type of state-of-the-art tubes used in Unit 2, to make the dropping-time of the tubes more accurate. The annual check may take 80 days, thus the unit will probably re-connect with the power grid in mid June. As for Unit 2, the "exciter" of generator malfunctioned during the start of the reactor on March 6, when the second refueling and maintenance neared completion.展开更多
文摘The purpose of this study is to detail the ecological characteristics of phytoplankton in waters around the Daya Bay Nuclear Power Station in Guangdong (GNPS) (Fig. 1) in spring, the bloom period of algae. The collections with a small temporal scale of every three days were made during 30 cruises from March to May in 1987. Such an investigation has never been carried out before in China except that the seasonal distribution and composition of phytoplankton in these regions were reported in
文摘The Daya Bay Nuclear Power Plant in South China’s Guangdong Province began its second refueling and maintenance work for its Unit 1 on March 31, 1996. Apart from the regular work required by the plant’s annual check- up plan, all of the present guide tubes of the control rods in Unit I will be replaced by the type of state-of-the-art tubes used in Unit 2, to make the dropping-time of the tubes more accurate. The annual check may take 80 days, thus the unit will probably re-connect with the power grid in mid June. As for Unit 2, the "exciter" of generator malfunctioned during the start of the reactor on March 6, when the second refueling and maintenance neared completion.