Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pr...Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability.展开更多
This article introduces the concepts relating to deep-cut vacuum distillation and its suitability,and analyzes the deep-cut vacuum distillation technique licensed by the KBC Advanced Technologies to the 10 Mt/a CDU/VD...This article introduces the concepts relating to deep-cut vacuum distillation and its suitability,and analyzes the deep-cut vacuum distillation technique licensed by the KBC Advanced Technologies to the 10 Mt/a CDU/VDU of the Qingdao refinery and makes comparison on the test run data after commissioning of the distillation unit. The test results have confirmed that the operation of the CDU/VDU had reached the expected goal to achieve good social and economic benefits.展开更多
基金Financial supports are from the National Natural Science Foundation of China (No. 50874104)the Scientific Research Industrialization Project of Jiangsu Universities (No. JH07-023)
文摘Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability.
文摘This article introduces the concepts relating to deep-cut vacuum distillation and its suitability,and analyzes the deep-cut vacuum distillation technique licensed by the KBC Advanced Technologies to the 10 Mt/a CDU/VDU of the Qingdao refinery and makes comparison on the test run data after commissioning of the distillation unit. The test results have confirmed that the operation of the CDU/VDU had reached the expected goal to achieve good social and economic benefits.