The numerous environmental protection equipments for desulfuration,denitration,and precipitation have been installed in the domestic coal-fired power plants,while the investment and energy consumption of the units inc...The numerous environmental protection equipments for desulfuration,denitration,and precipitation have been installed in the domestic coal-fired power plants,while the investment and energy consumption of the units increase correspondingly.To reduce the operational cost and initial investment as much as possible,the working processes of the environmental protection equipments are optimized in the design and some new technologies are adopted for energy saving.These technologies include the SCR,SNCR,combined SCR and SNCR for denitration device,system without gas-gas heater design for desulfuration,desulfuration system without bypass,booster fan and induced draft fan integrated,stack and cooling tower integrated and so on.However,such measures may cause some new problems during the operation of the equipment.The problems are summarized and analyzed thoroughly and the feasible methods are provided to solve them,which could decrease the operational risk of units.The present discussion can also improve the further design of environmental protection equipments to ensure the long-term steady operation of the units.展开更多
文摘The numerous environmental protection equipments for desulfuration,denitration,and precipitation have been installed in the domestic coal-fired power plants,while the investment and energy consumption of the units increase correspondingly.To reduce the operational cost and initial investment as much as possible,the working processes of the environmental protection equipments are optimized in the design and some new technologies are adopted for energy saving.These technologies include the SCR,SNCR,combined SCR and SNCR for denitration device,system without gas-gas heater design for desulfuration,desulfuration system without bypass,booster fan and induced draft fan integrated,stack and cooling tower integrated and so on.However,such measures may cause some new problems during the operation of the equipment.The problems are summarized and analyzed thoroughly and the feasible methods are provided to solve them,which could decrease the operational risk of units.The present discussion can also improve the further design of environmental protection equipments to ensure the long-term steady operation of the units.