Research on the special lifting devices for steel box girders of Sutong Bridge
1
作者 Chen Ming Wu Qihe +1 位作者 Luo Chengbin Zhou Hanfa 《Engineering Sciences》 EI 2009年第1期63-68,F0003,共7页
Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span cl... Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span closure girder and middle span closure girder.Each back span large unit is fabricated by welding several deck segments together in factory,and is erected by floating crane.As navigational clearance of the main bridge is high,the traditional truss lifting device can't satisfy the requirement of domestic lifting cranes for this kind of lifting height and weight.Hence,a kind of lighter lifting device for the erection of back span large units was accepted for this bridge.In this paper,the design and use of this lifting device is introduced.The upper structure used lifting gantry to install the standard girder segment by cantilever method.Because the bridge's navigation clearance is high,and the girder segment is wide and heavy,the meteorology and hydrology condition of the bridge district is abominable,and the requirements of long cable girder side pull-in,structure and performance propose high request to the lifting gantry.In this paper,the design and use key point of long cable pull-in angle adjustment device integrate into lifting gantry is introduced. 展开更多
关键词 Sutong Bridge large units lifting devices cantilever installation lifting gantry design and use
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部