Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span cl...Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span closure girder and middle span closure girder.Each back span large unit is fabricated by welding several deck segments together in factory,and is erected by floating crane.As navigational clearance of the main bridge is high,the traditional truss lifting device can't satisfy the requirement of domestic lifting cranes for this kind of lifting height and weight.Hence,a kind of lighter lifting device for the erection of back span large units was accepted for this bridge.In this paper,the design and use of this lifting device is introduced.The upper structure used lifting gantry to install the standard girder segment by cantilever method.Because the bridge's navigation clearance is high,and the girder segment is wide and heavy,the meteorology and hydrology condition of the bridge district is abominable,and the requirements of long cable girder side pull-in,structure and performance propose high request to the lifting gantry.In this paper,the design and use key point of long cable pull-in angle adjustment device integrate into lifting gantry is introduced.展开更多
基金National Science and Technology Support Program of China(No.2006BAG04B0)
文摘Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span closure girder and middle span closure girder.Each back span large unit is fabricated by welding several deck segments together in factory,and is erected by floating crane.As navigational clearance of the main bridge is high,the traditional truss lifting device can't satisfy the requirement of domestic lifting cranes for this kind of lifting height and weight.Hence,a kind of lighter lifting device for the erection of back span large units was accepted for this bridge.In this paper,the design and use of this lifting device is introduced.The upper structure used lifting gantry to install the standard girder segment by cantilever method.Because the bridge's navigation clearance is high,and the girder segment is wide and heavy,the meteorology and hydrology condition of the bridge district is abominable,and the requirements of long cable girder side pull-in,structure and performance propose high request to the lifting gantry.In this paper,the design and use key point of long cable pull-in angle adjustment device integrate into lifting gantry is introduced.