This study aimed to develop a guideline for therapeutic drug monitoring(TDM) of vancomycin. We adopted the new guideline definition from the Institute of Medicine(IOM), adhered closely to the six domains of the Ap...This study aimed to develop a guideline for therapeutic drug monitoring(TDM) of vancomycin. We adopted the new guideline definition from the Institute of Medicine(IOM), adhered closely to the six domains of the Appraisal of Guidelines for Research & Evaluation Ⅱ(AGREE Ⅱ), and made recommendations based on systematic reviews. We established a Guideline Steering Group and a Guideline Development Group, formulated 12 questions in the form of Population, Intervention, Comparison, Outcome(PICO) and completed a literature search. As far as we know, we will develop the first evidenced-based guideline for vancomycin TDM under the framework of the Grade of Recommendations Assessment, Development and Evaluation(GRADE).展开更多
Background:Occupational therapists can play a key role in early identifica-tion of delay at the population health level by providing education to public health employees on how to implement developmental monitoring wi...Background:Occupational therapists can play a key role in early identifica-tion of delay at the population health level by providing education to public health employees on how to implement developmental monitoring with caregivers of children birth to age 5.Methods:A pretest posttest design was utilized to assess the online education and training that was provided to Department of Public Health employees(N=339),including Head Start,Special Supplemental Nutrition Program for Women,Infants and Children,Home Visiting,and Early Intervention.Results:Analysis of pretest‐posttest survey data showed significant results for all 12 key learning outcomes.Six out of 12 outcomes were found to have a large effect size(d>0.8),4 outcomes indicated a medium effect size(d>0.5),and 2 outcomes had a small effect size(d>0.2).Participants gained knowledge of the“Learn the Signs.Act Early.”(LTSAE)developmental monitoring program,the difference between developmental monitoring and screening,the state's referral system and age‐appropriate parental engagement activities through knowledge of child development.Conclusions:Occupational therapists are child development specialists who can provide education on developmental monitoring and activities for parental engagement.The online course proved to be an effective platform to promote LTSAE within state agencies.展开更多
In this work, we used a linear CCD to detect the whole physical developing process of silver diffusion transfer reversal process in photographic chemistry. The influence of the ingredient of the working solution was s...In this work, we used a linear CCD to detect the whole physical developing process of silver diffusion transfer reversal process in photographic chemistry. The influence of the ingredient of the working solution was studied.展开更多
Following a small-scale wedge failure at Yukon Zinc's Wolverine Mine in Yukon, Canada, a vibration monitoring program was added to the existing rockbolt pull testing regime. The failure in the 1150 drift occurred aft...Following a small-scale wedge failure at Yukon Zinc's Wolverine Mine in Yukon, Canada, a vibration monitoring program was added to the existing rockbolt pull testing regime. The failure in the 1150 drift occurred after numerous successive blasts in an adjacent tunnel had loosened friction bolts passing through an unmapped fault. Analysis of blasting vibration revealed that support integrity is not compromised unless there is a geological structure to act as a failure plane. The peak particle velocity(PPV) rarely exceeded 250 mm/s with a frequency larger than 50 Hz. As expected, blasting more competent rock resulted in higher PPVs. In such cases, reducing the round length from 3.5 m to 2.0 m was an effective means of limiting potential rock mass and support damage.展开更多
This paper introduces the high-speed electrical multiple unit (EMO) life cycle, including the design, manufacturing, testing, and maintenance stages. It also presents the train control and monitoring system (TCMS)...This paper introduces the high-speed electrical multiple unit (EMO) life cycle, including the design, manufacturing, testing, and maintenance stages. It also presents the train control and monitoring system (TCMS) software development platform, the TCMS testing and verification bench, the EMU driving simulation platform, and the EMU remote data transmittal and maintenance platform. All these platforms and benches combined together make up the EMU life cycle cost (LCC) system. Each platform facilitates EMU LCC management and is an important part of the system.展开更多
文摘This study aimed to develop a guideline for therapeutic drug monitoring(TDM) of vancomycin. We adopted the new guideline definition from the Institute of Medicine(IOM), adhered closely to the six domains of the Appraisal of Guidelines for Research & Evaluation Ⅱ(AGREE Ⅱ), and made recommendations based on systematic reviews. We established a Guideline Steering Group and a Guideline Development Group, formulated 12 questions in the form of Population, Intervention, Comparison, Outcome(PICO) and completed a literature search. As far as we know, we will develop the first evidenced-based guideline for vancomycin TDM under the framework of the Grade of Recommendations Assessment, Development and Evaluation(GRADE).
基金OT18‐1802:National Capacity Building Center on Disability in Public Health,Grant/Award Number:SUBAWARD AGREEMENT#28‐21‐8814。
文摘Background:Occupational therapists can play a key role in early identifica-tion of delay at the population health level by providing education to public health employees on how to implement developmental monitoring with caregivers of children birth to age 5.Methods:A pretest posttest design was utilized to assess the online education and training that was provided to Department of Public Health employees(N=339),including Head Start,Special Supplemental Nutrition Program for Women,Infants and Children,Home Visiting,and Early Intervention.Results:Analysis of pretest‐posttest survey data showed significant results for all 12 key learning outcomes.Six out of 12 outcomes were found to have a large effect size(d>0.8),4 outcomes indicated a medium effect size(d>0.5),and 2 outcomes had a small effect size(d>0.2).Participants gained knowledge of the“Learn the Signs.Act Early.”(LTSAE)developmental monitoring program,the difference between developmental monitoring and screening,the state's referral system and age‐appropriate parental engagement activities through knowledge of child development.Conclusions:Occupational therapists are child development specialists who can provide education on developmental monitoring and activities for parental engagement.The online course proved to be an effective platform to promote LTSAE within state agencies.
文摘In this work, we used a linear CCD to detect the whole physical developing process of silver diffusion transfer reversal process in photographic chemistry. The influence of the ingredient of the working solution was studied.
文摘Following a small-scale wedge failure at Yukon Zinc's Wolverine Mine in Yukon, Canada, a vibration monitoring program was added to the existing rockbolt pull testing regime. The failure in the 1150 drift occurred after numerous successive blasts in an adjacent tunnel had loosened friction bolts passing through an unmapped fault. Analysis of blasting vibration revealed that support integrity is not compromised unless there is a geological structure to act as a failure plane. The peak particle velocity(PPV) rarely exceeded 250 mm/s with a frequency larger than 50 Hz. As expected, blasting more competent rock resulted in higher PPVs. In such cases, reducing the round length from 3.5 m to 2.0 m was an effective means of limiting potential rock mass and support damage.
文摘This paper introduces the high-speed electrical multiple unit (EMO) life cycle, including the design, manufacturing, testing, and maintenance stages. It also presents the train control and monitoring system (TCMS) software development platform, the TCMS testing and verification bench, the EMU driving simulation platform, and the EMU remote data transmittal and maintenance platform. All these platforms and benches combined together make up the EMU life cycle cost (LCC) system. Each platform facilitates EMU LCC management and is an important part of the system.