期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
A Protocol for Developing a Clinical Practice Guideline for Therapeutic Drug Monitoring of Vancomycin 被引量:4
1
作者 叶志康 陈恳 +1 位作者 陈耀龙 翟所迪 《Journal of Huazhong University of Science and Technology(Medical Sciences)》 SCIE CAS 2016年第3期469-472,共4页
This study aimed to develop a guideline for therapeutic drug monitoring(TDM) of vancomycin. We adopted the new guideline definition from the Institute of Medicine(IOM), adhered closely to the six domains of the Ap... This study aimed to develop a guideline for therapeutic drug monitoring(TDM) of vancomycin. We adopted the new guideline definition from the Institute of Medicine(IOM), adhered closely to the six domains of the Appraisal of Guidelines for Research & Evaluation Ⅱ(AGREE Ⅱ), and made recommendations based on systematic reviews. We established a Guideline Steering Group and a Guideline Development Group, formulated 12 questions in the form of Population, Intervention, Comparison, Outcome(PICO) and completed a literature search. As far as we know, we will develop the first evidenced-based guideline for vancomycin TDM under the framework of the Grade of Recommendations Assessment, Development and Evaluation(GRADE). 展开更多
关键词 vancomycin therapeutic drug monitoring guideline Grade of Recommendations Assessment development and Evaluation
下载PDF
Occupational therapy's role in promoting the“Learn the Signs.Act Early.”developmental monitoring program to public health employees
2
作者 Kate Barlow Kelsey Sullivan Scott Lauren 《Health Care Science》 2024年第3期163-171,共9页
Background:Occupational therapists can play a key role in early identifica-tion of delay at the population health level by providing education to public health employees on how to implement developmental monitoring wi... Background:Occupational therapists can play a key role in early identifica-tion of delay at the population health level by providing education to public health employees on how to implement developmental monitoring with caregivers of children birth to age 5.Methods:A pretest posttest design was utilized to assess the online education and training that was provided to Department of Public Health employees(N=339),including Head Start,Special Supplemental Nutrition Program for Women,Infants and Children,Home Visiting,and Early Intervention.Results:Analysis of pretest‐posttest survey data showed significant results for all 12 key learning outcomes.Six out of 12 outcomes were found to have a large effect size(d>0.8),4 outcomes indicated a medium effect size(d>0.5),and 2 outcomes had a small effect size(d>0.2).Participants gained knowledge of the“Learn the Signs.Act Early.”(LTSAE)developmental monitoring program,the difference between developmental monitoring and screening,the state's referral system and age‐appropriate parental engagement activities through knowledge of child development.Conclusions:Occupational therapists are child development specialists who can provide education on developmental monitoring and activities for parental engagement.The online course proved to be an effective platform to promote LTSAE within state agencies. 展开更多
关键词 occupational therapy developmental monitoring surveillance Head Start “Learn the Signs.Act Early.”
下载PDF
THE MONITORING FOR PHYSICAL DEVELOPING PROCESS WITH A LINEAR CCD
3
作者 Jing Kun XU Ping CHEN +1 位作者 Li ZHANG De Shui ZHENG(Institute of Photographic Chemistry, Academy of Sciences, Beijing. 100101) 《Chinese Chemical Letters》 SCIE CAS CSCD 1996年第4期361-364,共4页
In this work, we used a linear CCD to detect the whole physical developing process of silver diffusion transfer reversal process in photographic chemistry. The influence of the ingredient of the working solution was s... In this work, we used a linear CCD to detect the whole physical developing process of silver diffusion transfer reversal process in photographic chemistry. The influence of the ingredient of the working solution was studied. 展开更多
关键词 THE monitoring FOR PHYSICAL DEVELOPING PROCESS WITH A LINEAR CCD
下载PDF
Analysis of blasting damage in adjacent mining excavations 被引量:4
4
作者 Nick Yugo Woo Shin 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第3期282-290,共9页
Following a small-scale wedge failure at Yukon Zinc's Wolverine Mine in Yukon, Canada, a vibration monitoring program was added to the existing rockbolt pull testing regime. The failure in the 1150 drift occurred aft... Following a small-scale wedge failure at Yukon Zinc's Wolverine Mine in Yukon, Canada, a vibration monitoring program was added to the existing rockbolt pull testing regime. The failure in the 1150 drift occurred after numerous successive blasts in an adjacent tunnel had loosened friction bolts passing through an unmapped fault. Analysis of blasting vibration revealed that support integrity is not compromised unless there is a geological structure to act as a failure plane. The peak particle velocity(PPV) rarely exceeded 250 mm/s with a frequency larger than 50 Hz. As expected, blasting more competent rock resulted in higher PPVs. In such cases, reducing the round length from 3.5 m to 2.0 m was an effective means of limiting potential rock mass and support damage. 展开更多
关键词 Blasting damage Vibration monitoring Adjacent tunnel development Dynamic loading of friction bolts Jinduicheng Molybdenum Wolver
下载PDF
High-Speed EMU TCMS Design and LCC Technology Research 被引量:2
5
作者 Hongwei Zhao Zhiping Huang Ying Mei 《Engineering》 SCIE EI 2017年第1期122-129,共8页
This paper introduces the high-speed electrical multiple unit (EMO) life cycle, including the design, manufacturing, testing, and maintenance stages. It also presents the train control and monitoring system (TCMS)... This paper introduces the high-speed electrical multiple unit (EMO) life cycle, including the design, manufacturing, testing, and maintenance stages. It also presents the train control and monitoring system (TCMS) software development platform, the TCMS testing and verification bench, the EMU driving simulation platform, and the EMU remote data transmittal and maintenance platform. All these platforms and benches combined together make up the EMU life cycle cost (LCC) system. Each platform facilitates EMU LCC management and is an important part of the system. 展开更多
关键词 Electrical multiple unit Train control and monitoring system Train communication network Life cycle cost development platform Testing bench Simulation Remote data transmittal
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部