Based on the framework of method of successive averages(MSA), a modified stochastic user-equilibrium assignment algorithm was proposed, which can be used to calculate the passenger flow distribution of urban rail tran...Based on the framework of method of successive averages(MSA), a modified stochastic user-equilibrium assignment algorithm was proposed, which can be used to calculate the passenger flow distribution of urban rail transit(URT) under network operation. In order to describe the congestion's impact to passengers' route choices, a generalized cost function with in-vehicle congestion was set up. Building on the k-th shortest path algorithm, a method for generating choice set with time constraint was embedded, considering the characteristics of network operation. A simple but efficient route choice model, which was derived from travel surveys for URT passengers in China, was introduced to perform the stochastic network loading at each iteration in the algorithm. Initial tests on the URT network in Shanghai City show that the methodology, with rational calculation time, promises to compute more precisely the passenger flow distribution of URT under network operation, compared with those practical algorithms used in today's China.展开更多
Urban rail transit(URT) has been playing an important role in urban sustainable development with its advantages of high speed,large capacity,high efficiency and low pollution.Estimating URT network scale is the key to...Urban rail transit(URT) has been playing an important role in urban sustainable development with its advantages of high speed,large capacity,high efficiency and low pollution.Estimating URT network scale is the key to ensure the scientificity and feasibility of its construction.The existing studies on rational scale of URT network have not dealt with the interaction of supply and demand.This paper describes the establishment of a system dynamics model of rational URT network scale determination,considering the interaction between URT construction and city social economic development as well as the dynamic equilibrium of capital supply and traffic demand,and the verification of the model validity by applying it to the case of Wuhan City's URT construction.展开更多
The skip-stop operation strategy (SOS) is rarely applied to Chinese urban rail transit networks because it is a simple scheme and a less universally popular transportation service. However, the SOS has performance a...The skip-stop operation strategy (SOS) is rarely applied to Chinese urban rail transit networks because it is a simple scheme and a less universally popular transportation service. However, the SOS has performance advantages, in that the total trip time can be reduced depending on the number of skipped stations, crowds of passengers can be rapidly evacuated at congested stations in peak periods, and the cost to transit companies is reduced. There is a contradiction between reducing the trip time under the SOS and increasing the passengers' waiting times under an all-stop scheme. Given this situation, the three objectives of our study were to minimize the waiting and trip times of all passengers and the travel times of trains. A comprehensive estimation model is presented for the SOS. The mechanism through which the trip time for all passengers is affected by the SOS is analyzed in detail. A 0-I integer programming formulation is established for the three objectives, and is solved using a tabu search algorithm. Finally, an example is presented to demonstrate that the estimation method for the SOS is capable of optimizing the timetable and operation schemes for a Chinese urban rail transit network.展开更多
Current urban rail transit has become a major mode of transportation, and passenger is an important factor of urban rail transport, so this article is based on passenger and the degree of the road network structure, c...Current urban rail transit has become a major mode of transportation, and passenger is an important factor of urban rail transport, so this article is based on passenger and the degree of the road network structure, calculating the point intensity of stations of urban rail transit, and then reaching a station importance by integrating many point intensities in a survey cycle time, and getting the station importance of urban rail transit network through concrete examples.展开更多
This paper studies the short-term prediction methods of sectional passenger flow, and selects BP neural network combined with the characteristics of sectional passenger flow itself. With a case study, we design three ...This paper studies the short-term prediction methods of sectional passenger flow, and selects BP neural network combined with the characteristics of sectional passenger flow itself. With a case study, we design three different schemes. We use Matlab to realize the prediction of the sectional passenger flow of the Beijing subway Line 2 and make comparative analysis. The empirical research shows that combining data characteristics of sectional passenger flow with the BP neural network have good prediction accuracy.展开更多
Urban rail transit (URT) disruptions present considerable challenges due to several factors: i) a high probability of occurrence, arising from facility failures, disasters, and vandalism;ii) substantial negative effec...Urban rail transit (URT) disruptions present considerable challenges due to several factors: i) a high probability of occurrence, arising from facility failures, disasters, and vandalism;ii) substantial negative effects, notably the delay of numerous passengers;iii) an escalating frequency, attributable to the gradual aging of facilities;and iv) severe penalties, including substantial fines for abnormal operation. This article systematically reviews URT disruption management literature from the past decade, categorizing it into pre-disruption and post-disruption measures. The pre-disruption research focuses on reducing the effects of disruptions through network analysis, passenger behavior analysis, resource allocation for protection and backup, and enhancing system resilience. Conversely, post-disruption research concentrates on restoring normal operations through train rescheduling and bus bridging services. The review reveals that while post-disruption strategies are thoroughly explored, pre-disruption research is predominantly analytical, with a scarcity of practical pre-emptive solutions. Moreover, future research should focus more on increasing the interchangeability of transport modes, reinforcing redundancy relationships between URT lines, and innovating post-disruption strategies.展开更多
In order to study the interaction among the traction power supply,the train group and the operation dispatching of urban rail transit,a coupling simulation system of power supply system,trains and dispatching manageme...In order to study the interaction among the traction power supply,the train group and the operation dispatching of urban rail transit,a coupling simulation system of power supply system,trains and dispatching management is constructed.In order to solve the problems of different timescales and difficult cooperation operation for related subsystems,a multi-bus distributed real-time network architecture based on hierarchical management of communication data is established,and simulation management software is developed to facilitate the free expansion of the simulation system.Meanwhile,the track line,train operation and other large timescale subsystems are realized by the pure digital simulation.And the time-sensitive subsystems,such as train traction system,braking system,auxiliary power supply system and network system etc.,are built by the semi-physical simulation.In this article,the system structure and the main implementation principle of each simulation subsystem are given in detail,and the system is tested and verified at the end.The results show that the simulation system can meet the expected requirements.展开更多
基金Project(2007AA11Z236) supported by the National High Technology Research and Development Program of ChinaProject(2012M5209O1) supported by China Postdoctoral Science Foundation
文摘Based on the framework of method of successive averages(MSA), a modified stochastic user-equilibrium assignment algorithm was proposed, which can be used to calculate the passenger flow distribution of urban rail transit(URT) under network operation. In order to describe the congestion's impact to passengers' route choices, a generalized cost function with in-vehicle congestion was set up. Building on the k-th shortest path algorithm, a method for generating choice set with time constraint was embedded, considering the characteristics of network operation. A simple but efficient route choice model, which was derived from travel surveys for URT passengers in China, was introduced to perform the stochastic network loading at each iteration in the algorithm. Initial tests on the URT network in Shanghai City show that the methodology, with rational calculation time, promises to compute more precisely the passenger flow distribution of URT under network operation, compared with those practical algorithms used in today's China.
基金Funded by Independent Innovation Grant of Huazhong University of Science & Technology (No. M2009013)
文摘Urban rail transit(URT) has been playing an important role in urban sustainable development with its advantages of high speed,large capacity,high efficiency and low pollution.Estimating URT network scale is the key to ensure the scientificity and feasibility of its construction.The existing studies on rational scale of URT network have not dealt with the interaction of supply and demand.This paper describes the establishment of a system dynamics model of rational URT network scale determination,considering the interaction between URT construction and city social economic development as well as the dynamic equilibrium of capital supply and traffic demand,and the verification of the model validity by applying it to the case of Wuhan City's URT construction.
基金financed by the National Basic Research Program of China, under project ID 2012CB725403
文摘The skip-stop operation strategy (SOS) is rarely applied to Chinese urban rail transit networks because it is a simple scheme and a less universally popular transportation service. However, the SOS has performance advantages, in that the total trip time can be reduced depending on the number of skipped stations, crowds of passengers can be rapidly evacuated at congested stations in peak periods, and the cost to transit companies is reduced. There is a contradiction between reducing the trip time under the SOS and increasing the passengers' waiting times under an all-stop scheme. Given this situation, the three objectives of our study were to minimize the waiting and trip times of all passengers and the travel times of trains. A comprehensive estimation model is presented for the SOS. The mechanism through which the trip time for all passengers is affected by the SOS is analyzed in detail. A 0-I integer programming formulation is established for the three objectives, and is solved using a tabu search algorithm. Finally, an example is presented to demonstrate that the estimation method for the SOS is capable of optimizing the timetable and operation schemes for a Chinese urban rail transit network.
文摘Current urban rail transit has become a major mode of transportation, and passenger is an important factor of urban rail transport, so this article is based on passenger and the degree of the road network structure, calculating the point intensity of stations of urban rail transit, and then reaching a station importance by integrating many point intensities in a survey cycle time, and getting the station importance of urban rail transit network through concrete examples.
文摘This paper studies the short-term prediction methods of sectional passenger flow, and selects BP neural network combined with the characteristics of sectional passenger flow itself. With a case study, we design three different schemes. We use Matlab to realize the prediction of the sectional passenger flow of the Beijing subway Line 2 and make comparative analysis. The empirical research shows that combining data characteristics of sectional passenger flow with the BP neural network have good prediction accuracy.
基金supported by the National Natural Science Foundation of China(Grant Nos.72122014 and 72061127003)the Sustainable Urban Future Laboratory of ZJU-UIUC Institute.
文摘Urban rail transit (URT) disruptions present considerable challenges due to several factors: i) a high probability of occurrence, arising from facility failures, disasters, and vandalism;ii) substantial negative effects, notably the delay of numerous passengers;iii) an escalating frequency, attributable to the gradual aging of facilities;and iv) severe penalties, including substantial fines for abnormal operation. This article systematically reviews URT disruption management literature from the past decade, categorizing it into pre-disruption and post-disruption measures. The pre-disruption research focuses on reducing the effects of disruptions through network analysis, passenger behavior analysis, resource allocation for protection and backup, and enhancing system resilience. Conversely, post-disruption research concentrates on restoring normal operations through train rescheduling and bus bridging services. The review reveals that while post-disruption strategies are thoroughly explored, pre-disruption research is predominantly analytical, with a scarcity of practical pre-emptive solutions. Moreover, future research should focus more on increasing the interchangeability of transport modes, reinforcing redundancy relationships between URT lines, and innovating post-disruption strategies.
文摘In order to study the interaction among the traction power supply,the train group and the operation dispatching of urban rail transit,a coupling simulation system of power supply system,trains and dispatching management is constructed.In order to solve the problems of different timescales and difficult cooperation operation for related subsystems,a multi-bus distributed real-time network architecture based on hierarchical management of communication data is established,and simulation management software is developed to facilitate the free expansion of the simulation system.Meanwhile,the track line,train operation and other large timescale subsystems are realized by the pure digital simulation.And the time-sensitive subsystems,such as train traction system,braking system,auxiliary power supply system and network system etc.,are built by the semi-physical simulation.In this article,the system structure and the main implementation principle of each simulation subsystem are given in detail,and the system is tested and verified at the end.The results show that the simulation system can meet the expected requirements.