This paper introduces the problems emerged in the developing process of Nanning Medium-voltage distribution network to adapt the progress of HV network. These problems are: (1) unreasonable structure (large amount of ...This paper introduces the problems emerged in the developing process of Nanning Medium-voltage distribution network to adapt the progress of HV network. These problems are: (1) unreasonable structure (large amount of radical type 10 kV lines); (2) one 10 kV line for each customer (causing difficulties for line corridors); (3) circuit breaker are widely used for MV customers (result in complicated substation structure); (4) lots of overhead 10 kV lines in urban area. Ring circuit, insulated cables, load break switches, and fast acting fuses etc. advanced technologies are proposed for the retrofit of urban distribution network.展开更多
文摘This paper introduces the problems emerged in the developing process of Nanning Medium-voltage distribution network to adapt the progress of HV network. These problems are: (1) unreasonable structure (large amount of radical type 10 kV lines); (2) one 10 kV line for each customer (causing difficulties for line corridors); (3) circuit breaker are widely used for MV customers (result in complicated substation structure); (4) lots of overhead 10 kV lines in urban area. Ring circuit, insulated cables, load break switches, and fast acting fuses etc. advanced technologies are proposed for the retrofit of urban distribution network.