Wind energy (WE) has become immensely popular for distributed generation (DG). This case presents the monitoring, modeling, control, and analysis of the two-level three-phase WE based DG system where the electric ...Wind energy (WE) has become immensely popular for distributed generation (DG). This case presents the monitoring, modeling, control, and analysis of the two-level three-phase WE based DG system where the electric grid interfacing custom power device (CPD) is controlled to perform the smart exchanging of electric power as per the Indian grid code. WE is connected to DC link of CPD for the grid integration purpose. The CPD based distributed static compensator, i.e. the distributed static synchronous compensator (DSTATCOM), is utilized for injecting the wind power to the point of common coupling (PCC) and also acts against the reactive power demand. The novel indirect current control scheme of DSTATCOM regulates the power import and export between the WE and the electric grid system. It also acts as a compensator and performs both the key features simultaneously. Hence, the penetration of additional generated WE power to the grid is increased by 20% to 25%. The burden of reactive power compensation from grid is reduced by DSTATCOM. The modeling and simulation are done in MATLAB. The results are validated and verified.展开更多
This paper proposes to study the coordination of protective devices when 8 MW synchronous generators are interconnected to distribution System of PEA. The coordination between recloser and drop out fuse is investigate...This paper proposes to study the coordination of protective devices when 8 MW synchronous generators are interconnected to distribution System of PEA. The coordination between recloser and drop out fuse is investigated in this paper. The three-phase fault is simulated using digital simulation and electrical network calculation program (DIgSILENT). The results are shown that the short circuit current from substation is reduced comparing to the distribution system without DG connected. It causes to protective device coordination inconsistently, so the maintenance will be delayed more than expected.展开更多
Protection of radial distribution networks is widely based on coordinated inverse time overcurrent relays (OCRs) ensuring both effectiveness and selectivity. However, the integration of distributed generation (DG) int...Protection of radial distribution networks is widely based on coordinated inverse time overcurrent relays (OCRs) ensuring both effectiveness and selectivity. However, the integration of distributed generation (DG) into an existing distribution network not only inevitably increases fault current levels to levels that may exceed the OCR ratings, but it may also disturb the original overcurrent relay coordination adversely effecting protection selectivity. To analyze the potentially adverse impact of DG on distribution system protective devices with respect to circuit breaker ratings and OCR coordination fault current studies are carried out for common reference test system under the influence of additional DG. The possible advantages of Superconducting Fault Current Limiter (SFCL) as a means to limit the adverse effect of DG on distribution system protection and their effectiveness will be demonstrated. Furthermore, minimum SFCL impedances required to avoid miss-operation of the primary and back-up OCRs are determined. The theoretical analysis will be validated using the IEEE 13-bus distribution test system is used. Both theoretical and simulation results indicate that the proposed application of SFCL is a viable option to effectively mitigate the DG impact on protective devices, thus enhancing the reliability of distribution network interfaced with DG.展开更多
To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model...To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.展开更多
Islanding detection is an essential function for safety and reliability in grid-connected distributed generation (DG) systems. Several methods for islanding detection are proposed, but most of them may fail under mult...Islanding detection is an essential function for safety and reliability in grid-connected distributed generation (DG) systems. Several methods for islanding detection are proposed, but most of them may fail under multi-source configurations, or they may produce important power quality degradation which gets worse with increasing DG penetration. This paper presents an active islanding detection algorithm for Voltage Source Inverter (VSI) based multi-source DG systems. The proposed method is based on the Voltage Positive Feedback (VPF) theory to generate a limited active power perturbation. Theoretical analyses were performed and simulations by MATLAB /Simulink /SimPowerSystems were used to evaluate the algorithm’s performance and its advantages concerning the time response and the effects on power quality, which turned out to be negligible. The algorithm performance was tested under critical conditions: load with unity power factor, load with high quality factor, and load matching DER’s powers.展开更多
Due to the increasing demand of energy and the need for nonconventional energy sources, distributed generation (DG) has come into play. The trend of unidirectional power flow has been gradually shifting. With new tech...Due to the increasing demand of energy and the need for nonconventional energy sources, distributed generation (DG) has come into play. The trend of unidirectional power flow has been gradually shifting. With new technology comes new challenges, the introduction of DG into the conventional power system brings various challenges;one of the major challenges is system protection under DG sources. These sources pose a significant challenge due to bidirectional flows from DGs as well as lower fault current contribution from inverter interfaced DGs. This paper reviews existing protection schemes that have been suggested for active distribution networks. Most of these protection strategies apply only to smaller distribution systems implying that they may need to be extended to larger systems with a much higher penetration of distributed generation. In the end, a potential protection scheme has also been recommended as a future work.展开更多
Distributed generation (DG) is the future of energy. This technology allows the bidirectional flow of power within an electrical network. Researchers are faced with many challenges to the accurate implementation of pr...Distributed generation (DG) is the future of energy. This technology allows the bidirectional flow of power within an electrical network. Researchers are faced with many challenges to the accurate implementation of protection schemes for DG-connected distribution network. The schemes designed must satisfy the performance requirements of selectivity, reliability, and sensitivity. Most researchers opine that conventional protection schemes based on over current detection are insufficient to completely and accurately protect a DG-connected distributed power system. There are many challenges?that?need to be tackled before embarking upon the journey to successfully implement these schemes. This paper summarizes the major challenges which one can encounter while designing protection schemes for DG-connected distribution networks. Some possible solutions from the literature are also mentioned. Moreover, a suggested solution for protecting future active distribution networks is provided. It is expected that this paper will act as a benchmark for future researchers in this field to tackle the challenges related to the protection of active distribution networks.展开更多
Power loss and voltage uncertainty are the major issues prevalently faced in the design of distribution systems.But such issues can be resolved through effective usage of networking reconfiguration that has a combinat...Power loss and voltage uncertainty are the major issues prevalently faced in the design of distribution systems.But such issues can be resolved through effective usage of networking reconfiguration that has a combination of Distributed Generation(DG)units from distribution networks.In this point of view,optimal placement and sizing of DGs are effective ways to boost the performance of power systems.The optimum allocation of DGs resolves various problems namely,power loss,voltage profile improvement,enhanced reliability,system stability,and performance.Several research works have been conducted to address the distribution system problems in terms of power loss,energy loss,voltage profile,and voltage stability depending upon optimal DG distribution.With this motivation,the current study designs a Chaotic Artificial Flora Optimization based on Optimal Placement and Sizing of DGs(CAFO-OPSDG)to enhance the voltage profiles and mitigate the power loss.Besides,the CAFO algorithm is derived from the incorporation of chaos theory concept into conventional artificial flora optimization AFO algorithm with an aim to enhance the global optimization abilities.The fitness function of CAFO-OPSDG algorithm involves voltage regulation,power loss minimization,and penalty cost.To consider the actual power system scenario,the penalty factor acts as an important element not only to minimize the total power loss but to increase the voltage profiles as well.The experimental validation of the CAFO-OPSDG algorithm was conducted against IEEE 33 Bus system and IEEE 69 Bus system.The outcomes were examined under various test scenarios.The results of the experiment established that the presented CAFO-OPSDG model is effective in terms of reducing the power loss and voltage deviation and boost-up the voltage profile for the specified system.展开更多
Nowadays, renewable energy resources play an important role in replacing conventional energy resources such as fossil fuel by integrating solar, wind and geothermal energy. Photovoltaic energy is one?of?the very promi...Nowadays, renewable energy resources play an important role in replacing conventional energy resources such as fossil fuel by integrating solar, wind and geothermal energy. Photovoltaic energy is one?of?the very promising renewable energy resources which grew rapidly in the past few years, it can be used to produce electric energy through photovoltaic process. The primary objective of the research proposed in this paper is to facilitate the increasing penetration levels of PV systems in the electric distribution networks. In this work, the PV module electrical model is presented based on the mathematical equations and was implemented on MATLAB to simulate the non-linear characteristics I-V and P-V curves with variable input parameters which are irradiance and temperature based on Riyadh region. In addition, the reliability evaluation of distribution networks, including distributed generators of solar photovoltaic (PV) with varying output power capacity is presented also. The Monte Carlo simulation algorithm is applied to test the distribution network which is RBTS Bus 2 and the same has been conducted on the original case of distribution network substation 7029 which is located at KSA Riyadh. The two distribution networks have been modified to include the PV’s distributed generators. The distributed generators contribute to supply a part of the load during normal mode and supply the entire load during component failure or failure of grid operation supply. The PV stochastic models have been used to simulate the randomness of these resources. Moreover, the study shows that the implementation and integration of renewable resources as distributed generations have improved the reliability of the distribution networks.展开更多
The rapid spreading of the Photovoltaic (PV) Systems as Distributed Generation (DG) in medium and low voltage networks created many effects and changes on the existing power system networks. In this work, two methods ...The rapid spreading of the Photovoltaic (PV) Systems as Distributed Generation (DG) in medium and low voltage networks created many effects and changes on the existing power system networks. In this work, two methods have been used and applied to determine the optimal allocation and sizing of the PV to be installed as DGs (ranging from 250 kW up to 3 MW). The first one is to determine the location according to the maximal power losses reduction over the feeder. The second one is by using the Harmony Search Algorithm which is claimed to be a powerful technique for optimal allocation of PV systems. The results of the two techniques were compared and found to be nearly closed. Furthermore, investigation on the effects on the feeder in terms of voltage levels, power factor readings, and short circuit current levels has been done. All calculations and simulations are conducted by using the MATLAB Simulation Program. Some field calculations and observations have been expended in order to substantiate the research findings and validation.展开更多
The setting work of backup protection using steady-state current is tedious,and mismatches occasionally occur due to the increased proportion of distributed generations(DGs)connected to the power grid.Thus,there is a ...The setting work of backup protection using steady-state current is tedious,and mismatches occasionally occur due to the increased proportion of distributed generations(DGs)connected to the power grid.Thus,there is a practical need to study a backup protection technology that does not require step-by-step setting and can be adaptively coordinated.This paper proposes an action sequence adaptive to fault positions that uses only positive sequence fault component(PSFC)voltage.Considering the influence of DGs,the unified time dial setting can be obtained by selecting specific points.The protection performance is improved by using the adjacent upstream and downstream protections to meet the coordination time interval in the case of metallic faults at the near-and far-ends of the line.Finally,the expression and implementation scheme for inverse-time backup protection(ITBP)based on the unified characteristic equation is given.Simulation results show that this scheme can adapt to DG penetration scenarios and can realize the adaptive coordination of multi-level relays.展开更多
In distribution systems,network reconfiguration and capacitor placement are commonly used to diminish power losses and keep voltage profiles within acceptable limits.Moreover,the problem of DG allocation and sizing is...In distribution systems,network reconfiguration and capacitor placement are commonly used to diminish power losses and keep voltage profiles within acceptable limits.Moreover,the problem of DG allocation and sizing is great important.In this work,a combination of a fuzzy multi-objective approach and bacterial foraging optimization(BFO) as a meta-heuristic algorithm is used to solve the simultaneous reconfiguration and optimal sizing of DGs and shunt capacitors in a distribution system.Each objective is transferred into fuzzy domain using its membership function.Then,the overall fuzzy satisfaction function is formed and considered a fitness function inasmuch as the value of this function has to be maximized to gain the optimal solution.The numerical results show that the presented algorithm improves the performance much more than other meta-heuristic algorithms.Simulation results found that simultaneous reconfiguration with DG and shunt capacitors allocation(case 5) has 77.41%,42.15%,and 56.14%improvements in power loss reduction,load balancing,and voltage profile indices,respectively in 33-bus test system.This result found 87.27%,35.82%,and 54.34%improvements of mentioned indices respectively for 69-bus system.展开更多
In this paper a short-circuit computation(SCC) procedure for large-scale distribution systems with high penetration of distributed generators based on contemporary technologies is proposed. The procedure is suitable f...In this paper a short-circuit computation(SCC) procedure for large-scale distribution systems with high penetration of distributed generators based on contemporary technologies is proposed. The procedure is suitable for real-time calculations.Modeling of modern distributed generators differs from the modeling of traditional synchronous and induction generators.Hence, SCC procedures found on the presumption of distribution systems with only traditional generators are not suitable in nowadays systems. In the work presented in this paper, for computation of the state of the system with short-circuit, the improved backward/forward sweep(IBFS) procedure is used.Computation results show that the IBFS procedure is much more robust than previous SCC procedures, as it takes into account all distribution system elements, including modern distributed generators.展开更多
Distributed Generation (DG) unlike centralized electrical generation aims to generate electrical energy on small scale as near as possible to the load centers, interchanging electric power with the network. Moreover, ...Distributed Generation (DG) unlike centralized electrical generation aims to generate electrical energy on small scale as near as possible to the load centers, interchanging electric power with the network. Moreover, DGs influence distribution system parameters such as reliability, loss reduction and efficiency while they are highly dependent on their situation in the distribution network. This paper focuses on optimal placement and estimation of DG capacity for installation and takes more number of significant parameters into account compare to the previous studies which consider just a few parameters for their optimization algorithms. Using a proposed optimal Genetic Algorithm, a destination function that includes the cost parameters (such as loss reduction, fuel price, etc.) has been optimized. This method is also capable of changing the weights of each cost parameter in the destination function of the Genetic Algorithm and the matrix of coefficients in the DIGSILENT environment. It has been applied and simulated on a sample IEEE 13-bus network. The obtained results show that any change in the weight of each parameter in the destination function of the Genetic Algorithm and in the matrix of coefficients leads to a meaningful change in the location and capacity of the prospective DG in the distribution network.展开更多
This paper proposes a multi-objective index-based approach to optimally determine the size and location of multi-distributed generators (DG) units in distribution system with different load models. It is shown that lo...This paper proposes a multi-objective index-based approach to optimally determine the size and location of multi-distributed generators (DG) units in distribution system with different load models. It is shown that load models can significantly affect the optimal location and sizing of DG resources in distribution systems. The proposed multi-objective function to be optimized includes a short circuit level parameter to represent the protective device requirements. The proposed function also considers a wide range of technical issues such as active and reactive power losses of the system, the voltage profile, the line loading and the MVA intake by the grid. The optimization technique based on particle swarm optimization (PSO) is introduced. The analysis of continuation power flow to determine the effect of DG units on the most sensitive buses to voltage collapse is carried out. The proposed algorithm is tested using the 38-bus radial system and the IEEE 30-bus meshed system. The results show the effectiveness of the proposed algorithm.展开更多
The performance of DFIG-based wind generation systems that interconnected to solid networks is well understood and prevalent in Europe and North America. However, the application of these renewable generating stations...The performance of DFIG-based wind generation systems that interconnected to solid networks is well understood and prevalent in Europe and North America. However, the application of these renewable generating stations to weak network has been examined in very limited occasions. Weak networks have a range of limitations from system capacities to CFCT restrictions which would need to be well understood prior to wind energy integration. Of particular interest would be how much wind generation could be integrated into a weak network prior to increasing voltage and frequency stability issues brought about by penetration issues. This paper introduces a simple and practical approach based on the equal area criteria to investigate the stability of weak networks. Simulation results that are presented to show the proposed approach is a viable preliminary assessment tool to determine system stability on weak networks with wind power penetration.展开更多
The utilization of wind generation equipment, such as DFIGs (double fed induction generators), interconnected to islanded power generation and distribution systems is investigated in order to determine their effects...The utilization of wind generation equipment, such as DFIGs (double fed induction generators), interconnected to islanded power generation and distribution systems is investigated in order to determine their effects on the overall system operating characteristics and stability. The use of a stable power station (with high speed machines) will be critical in achieving fast and reliable transient response to network events, in particular, when large transient loads are expected on a continuous basis, i.e., industrial mining and mineral processing equipment. Simulation results of this paper assist in understanding how small power stations and wind generation equipment respond to large transients in an islanded network. In particular, detailed simulations and analyses will be presented on impacts of distributed wind generation units (1.5 MW DF1G) on the stability of a small weak network. The novelty of this paper is on detailed analyses and simulation of weak networks with interconnects DFIG's including their impacts on system stability under various transient operating conditions.展开更多
Contemporarily,the development of distributed generations(DGs)technologies is fetching more,and their deployment in power systems is becom-ing broad and diverse.Consequently,several glitches are found in the recent st...Contemporarily,the development of distributed generations(DGs)technologies is fetching more,and their deployment in power systems is becom-ing broad and diverse.Consequently,several glitches are found in the recent studies due to the inappropriate/inadequate penetrations.This work aims to improve the reliable operation of the power system employing reliability indices using a metaheuristic-based algorithm before and after DGs penetration with feeder system.The assessment procedure is carried out using MATLAB software and Mod-ified Salp Swarm Algorithm(MSSA)that helps assess the Reliability indices of the proposed integrated IEEE RTS79 system for seven different configurations.This algorithm modifies two control parameters of the actual SSA algorithm and offers a perfect balance between the exploration and exploitation.Further,the effectiveness of the proposed schemes is assessed using various reliability indices.Also,the available capacity of the extended system is computed for the best configuration of the considered system.The results confirm the level of reli-able operation of the extended DGs along with the standard RTS system.Speci-fically,the overall reliability of the system displays superior performance when the tie lines 1 and 2 of the DG connected with buses 9 and 10,respectively.The reliability indices of this case namely SAIFI,SAIDI,CAIDI,ASAI,AUSI,EUE,and AEUE shows enhancement about 12.5%,4.32%,7.28%,1.09%,4.53%,12.00%,and 0.19%,respectively.Also,a probability of available capacity at the low voltage bus side is accomplished a good scale about 212.07 times/year.展开更多
文摘Wind energy (WE) has become immensely popular for distributed generation (DG). This case presents the monitoring, modeling, control, and analysis of the two-level three-phase WE based DG system where the electric grid interfacing custom power device (CPD) is controlled to perform the smart exchanging of electric power as per the Indian grid code. WE is connected to DC link of CPD for the grid integration purpose. The CPD based distributed static compensator, i.e. the distributed static synchronous compensator (DSTATCOM), is utilized for injecting the wind power to the point of common coupling (PCC) and also acts against the reactive power demand. The novel indirect current control scheme of DSTATCOM regulates the power import and export between the WE and the electric grid system. It also acts as a compensator and performs both the key features simultaneously. Hence, the penetration of additional generated WE power to the grid is increased by 20% to 25%. The burden of reactive power compensation from grid is reduced by DSTATCOM. The modeling and simulation are done in MATLAB. The results are validated and verified.
文摘This paper proposes to study the coordination of protective devices when 8 MW synchronous generators are interconnected to distribution System of PEA. The coordination between recloser and drop out fuse is investigated in this paper. The three-phase fault is simulated using digital simulation and electrical network calculation program (DIgSILENT). The results are shown that the short circuit current from substation is reduced comparing to the distribution system without DG connected. It causes to protective device coordination inconsistently, so the maintenance will be delayed more than expected.
文摘Protection of radial distribution networks is widely based on coordinated inverse time overcurrent relays (OCRs) ensuring both effectiveness and selectivity. However, the integration of distributed generation (DG) into an existing distribution network not only inevitably increases fault current levels to levels that may exceed the OCR ratings, but it may also disturb the original overcurrent relay coordination adversely effecting protection selectivity. To analyze the potentially adverse impact of DG on distribution system protective devices with respect to circuit breaker ratings and OCR coordination fault current studies are carried out for common reference test system under the influence of additional DG. The possible advantages of Superconducting Fault Current Limiter (SFCL) as a means to limit the adverse effect of DG on distribution system protection and their effectiveness will be demonstrated. Furthermore, minimum SFCL impedances required to avoid miss-operation of the primary and back-up OCRs are determined. The theoretical analysis will be validated using the IEEE 13-bus distribution test system is used. Both theoretical and simulation results indicate that the proposed application of SFCL is a viable option to effectively mitigate the DG impact on protective devices, thus enhancing the reliability of distribution network interfaced with DG.
基金The National Natural Science Foundation of China(No.51377021)the Science and Technology Project of State Grid Corporation of China(No.SGTJDK00DWJS1600014)
文摘To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.
文摘Islanding detection is an essential function for safety and reliability in grid-connected distributed generation (DG) systems. Several methods for islanding detection are proposed, but most of them may fail under multi-source configurations, or they may produce important power quality degradation which gets worse with increasing DG penetration. This paper presents an active islanding detection algorithm for Voltage Source Inverter (VSI) based multi-source DG systems. The proposed method is based on the Voltage Positive Feedback (VPF) theory to generate a limited active power perturbation. Theoretical analyses were performed and simulations by MATLAB /Simulink /SimPowerSystems were used to evaluate the algorithm’s performance and its advantages concerning the time response and the effects on power quality, which turned out to be negligible. The algorithm performance was tested under critical conditions: load with unity power factor, load with high quality factor, and load matching DER’s powers.
文摘Due to the increasing demand of energy and the need for nonconventional energy sources, distributed generation (DG) has come into play. The trend of unidirectional power flow has been gradually shifting. With new technology comes new challenges, the introduction of DG into the conventional power system brings various challenges;one of the major challenges is system protection under DG sources. These sources pose a significant challenge due to bidirectional flows from DGs as well as lower fault current contribution from inverter interfaced DGs. This paper reviews existing protection schemes that have been suggested for active distribution networks. Most of these protection strategies apply only to smaller distribution systems implying that they may need to be extended to larger systems with a much higher penetration of distributed generation. In the end, a potential protection scheme has also been recommended as a future work.
文摘Distributed generation (DG) is the future of energy. This technology allows the bidirectional flow of power within an electrical network. Researchers are faced with many challenges to the accurate implementation of protection schemes for DG-connected distribution network. The schemes designed must satisfy the performance requirements of selectivity, reliability, and sensitivity. Most researchers opine that conventional protection schemes based on over current detection are insufficient to completely and accurately protect a DG-connected distributed power system. There are many challenges?that?need to be tackled before embarking upon the journey to successfully implement these schemes. This paper summarizes the major challenges which one can encounter while designing protection schemes for DG-connected distribution networks. Some possible solutions from the literature are also mentioned. Moreover, a suggested solution for protecting future active distribution networks is provided. It is expected that this paper will act as a benchmark for future researchers in this field to tackle the challenges related to the protection of active distribution networks.
文摘Power loss and voltage uncertainty are the major issues prevalently faced in the design of distribution systems.But such issues can be resolved through effective usage of networking reconfiguration that has a combination of Distributed Generation(DG)units from distribution networks.In this point of view,optimal placement and sizing of DGs are effective ways to boost the performance of power systems.The optimum allocation of DGs resolves various problems namely,power loss,voltage profile improvement,enhanced reliability,system stability,and performance.Several research works have been conducted to address the distribution system problems in terms of power loss,energy loss,voltage profile,and voltage stability depending upon optimal DG distribution.With this motivation,the current study designs a Chaotic Artificial Flora Optimization based on Optimal Placement and Sizing of DGs(CAFO-OPSDG)to enhance the voltage profiles and mitigate the power loss.Besides,the CAFO algorithm is derived from the incorporation of chaos theory concept into conventional artificial flora optimization AFO algorithm with an aim to enhance the global optimization abilities.The fitness function of CAFO-OPSDG algorithm involves voltage regulation,power loss minimization,and penalty cost.To consider the actual power system scenario,the penalty factor acts as an important element not only to minimize the total power loss but to increase the voltage profiles as well.The experimental validation of the CAFO-OPSDG algorithm was conducted against IEEE 33 Bus system and IEEE 69 Bus system.The outcomes were examined under various test scenarios.The results of the experiment established that the presented CAFO-OPSDG model is effective in terms of reducing the power loss and voltage deviation and boost-up the voltage profile for the specified system.
文摘Nowadays, renewable energy resources play an important role in replacing conventional energy resources such as fossil fuel by integrating solar, wind and geothermal energy. Photovoltaic energy is one?of?the very promising renewable energy resources which grew rapidly in the past few years, it can be used to produce electric energy through photovoltaic process. The primary objective of the research proposed in this paper is to facilitate the increasing penetration levels of PV systems in the electric distribution networks. In this work, the PV module electrical model is presented based on the mathematical equations and was implemented on MATLAB to simulate the non-linear characteristics I-V and P-V curves with variable input parameters which are irradiance and temperature based on Riyadh region. In addition, the reliability evaluation of distribution networks, including distributed generators of solar photovoltaic (PV) with varying output power capacity is presented also. The Monte Carlo simulation algorithm is applied to test the distribution network which is RBTS Bus 2 and the same has been conducted on the original case of distribution network substation 7029 which is located at KSA Riyadh. The two distribution networks have been modified to include the PV’s distributed generators. The distributed generators contribute to supply a part of the load during normal mode and supply the entire load during component failure or failure of grid operation supply. The PV stochastic models have been used to simulate the randomness of these resources. Moreover, the study shows that the implementation and integration of renewable resources as distributed generations have improved the reliability of the distribution networks.
文摘The rapid spreading of the Photovoltaic (PV) Systems as Distributed Generation (DG) in medium and low voltage networks created many effects and changes on the existing power system networks. In this work, two methods have been used and applied to determine the optimal allocation and sizing of the PV to be installed as DGs (ranging from 250 kW up to 3 MW). The first one is to determine the location according to the maximal power losses reduction over the feeder. The second one is by using the Harmony Search Algorithm which is claimed to be a powerful technique for optimal allocation of PV systems. The results of the two techniques were compared and found to be nearly closed. Furthermore, investigation on the effects on the feeder in terms of voltage levels, power factor readings, and short circuit current levels has been done. All calculations and simulations are conducted by using the MATLAB Simulation Program. Some field calculations and observations have been expended in order to substantiate the research findings and validation.
基金supported in part by the National Natural Science Foundation of China(NSFC-UKRI_EPSRC)(No.52061635105)in part by the Science and Technology Program of SGCC(No.5100-202040327A-0-0-00).
文摘The setting work of backup protection using steady-state current is tedious,and mismatches occasionally occur due to the increased proportion of distributed generations(DGs)connected to the power grid.Thus,there is a practical need to study a backup protection technology that does not require step-by-step setting and can be adaptively coordinated.This paper proposes an action sequence adaptive to fault positions that uses only positive sequence fault component(PSFC)voltage.Considering the influence of DGs,the unified time dial setting can be obtained by selecting specific points.The protection performance is improved by using the adjacent upstream and downstream protections to meet the coordination time interval in the case of metallic faults at the near-and far-ends of the line.Finally,the expression and implementation scheme for inverse-time backup protection(ITBP)based on the unified characteristic equation is given.Simulation results show that this scheme can adapt to DG penetration scenarios and can realize the adaptive coordination of multi-level relays.
文摘In distribution systems,network reconfiguration and capacitor placement are commonly used to diminish power losses and keep voltage profiles within acceptable limits.Moreover,the problem of DG allocation and sizing is great important.In this work,a combination of a fuzzy multi-objective approach and bacterial foraging optimization(BFO) as a meta-heuristic algorithm is used to solve the simultaneous reconfiguration and optimal sizing of DGs and shunt capacitors in a distribution system.Each objective is transferred into fuzzy domain using its membership function.Then,the overall fuzzy satisfaction function is formed and considered a fitness function inasmuch as the value of this function has to be maximized to gain the optimal solution.The numerical results show that the presented algorithm improves the performance much more than other meta-heuristic algorithms.Simulation results found that simultaneous reconfiguration with DG and shunt capacitors allocation(case 5) has 77.41%,42.15%,and 56.14%improvements in power loss reduction,load balancing,and voltage profile indices,respectively in 33-bus test system.This result found 87.27%,35.82%,and 54.34%improvements of mentioned indices respectively for 69-bus system.
文摘In this paper a short-circuit computation(SCC) procedure for large-scale distribution systems with high penetration of distributed generators based on contemporary technologies is proposed. The procedure is suitable for real-time calculations.Modeling of modern distributed generators differs from the modeling of traditional synchronous and induction generators.Hence, SCC procedures found on the presumption of distribution systems with only traditional generators are not suitable in nowadays systems. In the work presented in this paper, for computation of the state of the system with short-circuit, the improved backward/forward sweep(IBFS) procedure is used.Computation results show that the IBFS procedure is much more robust than previous SCC procedures, as it takes into account all distribution system elements, including modern distributed generators.
文摘Distributed Generation (DG) unlike centralized electrical generation aims to generate electrical energy on small scale as near as possible to the load centers, interchanging electric power with the network. Moreover, DGs influence distribution system parameters such as reliability, loss reduction and efficiency while they are highly dependent on their situation in the distribution network. This paper focuses on optimal placement and estimation of DG capacity for installation and takes more number of significant parameters into account compare to the previous studies which consider just a few parameters for their optimization algorithms. Using a proposed optimal Genetic Algorithm, a destination function that includes the cost parameters (such as loss reduction, fuel price, etc.) has been optimized. This method is also capable of changing the weights of each cost parameter in the destination function of the Genetic Algorithm and the matrix of coefficients in the DIGSILENT environment. It has been applied and simulated on a sample IEEE 13-bus network. The obtained results show that any change in the weight of each parameter in the destination function of the Genetic Algorithm and in the matrix of coefficients leads to a meaningful change in the location and capacity of the prospective DG in the distribution network.
文摘This paper proposes a multi-objective index-based approach to optimally determine the size and location of multi-distributed generators (DG) units in distribution system with different load models. It is shown that load models can significantly affect the optimal location and sizing of DG resources in distribution systems. The proposed multi-objective function to be optimized includes a short circuit level parameter to represent the protective device requirements. The proposed function also considers a wide range of technical issues such as active and reactive power losses of the system, the voltage profile, the line loading and the MVA intake by the grid. The optimization technique based on particle swarm optimization (PSO) is introduced. The analysis of continuation power flow to determine the effect of DG units on the most sensitive buses to voltage collapse is carried out. The proposed algorithm is tested using the 38-bus radial system and the IEEE 30-bus meshed system. The results show the effectiveness of the proposed algorithm.
文摘The performance of DFIG-based wind generation systems that interconnected to solid networks is well understood and prevalent in Europe and North America. However, the application of these renewable generating stations to weak network has been examined in very limited occasions. Weak networks have a range of limitations from system capacities to CFCT restrictions which would need to be well understood prior to wind energy integration. Of particular interest would be how much wind generation could be integrated into a weak network prior to increasing voltage and frequency stability issues brought about by penetration issues. This paper introduces a simple and practical approach based on the equal area criteria to investigate the stability of weak networks. Simulation results that are presented to show the proposed approach is a viable preliminary assessment tool to determine system stability on weak networks with wind power penetration.
文摘The utilization of wind generation equipment, such as DFIGs (double fed induction generators), interconnected to islanded power generation and distribution systems is investigated in order to determine their effects on the overall system operating characteristics and stability. The use of a stable power station (with high speed machines) will be critical in achieving fast and reliable transient response to network events, in particular, when large transient loads are expected on a continuous basis, i.e., industrial mining and mineral processing equipment. Simulation results of this paper assist in understanding how small power stations and wind generation equipment respond to large transients in an islanded network. In particular, detailed simulations and analyses will be presented on impacts of distributed wind generation units (1.5 MW DF1G) on the stability of a small weak network. The novelty of this paper is on detailed analyses and simulation of weak networks with interconnects DFIG's including their impacts on system stability under various transient operating conditions.
文摘Contemporarily,the development of distributed generations(DGs)technologies is fetching more,and their deployment in power systems is becom-ing broad and diverse.Consequently,several glitches are found in the recent studies due to the inappropriate/inadequate penetrations.This work aims to improve the reliable operation of the power system employing reliability indices using a metaheuristic-based algorithm before and after DGs penetration with feeder system.The assessment procedure is carried out using MATLAB software and Mod-ified Salp Swarm Algorithm(MSSA)that helps assess the Reliability indices of the proposed integrated IEEE RTS79 system for seven different configurations.This algorithm modifies two control parameters of the actual SSA algorithm and offers a perfect balance between the exploration and exploitation.Further,the effectiveness of the proposed schemes is assessed using various reliability indices.Also,the available capacity of the extended system is computed for the best configuration of the considered system.The results confirm the level of reli-able operation of the extended DGs along with the standard RTS system.Speci-fically,the overall reliability of the system displays superior performance when the tie lines 1 and 2 of the DG connected with buses 9 and 10,respectively.The reliability indices of this case namely SAIFI,SAIDI,CAIDI,ASAI,AUSI,EUE,and AEUE shows enhancement about 12.5%,4.32%,7.28%,1.09%,4.53%,12.00%,and 0.19%,respectively.Also,a probability of available capacity at the low voltage bus side is accomplished a good scale about 212.07 times/year.