From 2019 to 2021,China Seismic Experimental Site has built twelve 300 m deep well multi-measurement comprehensive observation stations in the cross-fault area of the Aninghe-Zemuhe fault zone,integrating BBVS120 very...From 2019 to 2021,China Seismic Experimental Site has built twelve 300 m deep well multi-measurement comprehensive observation stations in the cross-fault area of the Aninghe-Zemuhe fault zone,integrating BBVS120 very broadband borehole seismometer,RZB four-gauge borehole strainmeter and geothermometer with resolution up to 0.0001℃.The borehole diameter is 150 mm and the inner diameter of the sleeve is 130 mm.The multi-item integrated observation system is divided into two parts:underground and surface.The downhole part is mainly composed of sensor and power supply signal isolation.展开更多
基金funded by National Key Research and Development Project(Grant No.2022YFC2204301)the Special Fund of the Institute of Earthquake Forecasting,China Earthquake Administration(Grant No.CEAIEF2022030105).
文摘From 2019 to 2021,China Seismic Experimental Site has built twelve 300 m deep well multi-measurement comprehensive observation stations in the cross-fault area of the Aninghe-Zemuhe fault zone,integrating BBVS120 very broadband borehole seismometer,RZB four-gauge borehole strainmeter and geothermometer with resolution up to 0.0001℃.The borehole diameter is 150 mm and the inner diameter of the sleeve is 130 mm.The multi-item integrated observation system is divided into two parts:underground and surface.The downhole part is mainly composed of sensor and power supply signal isolation.