It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime...It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.展开更多
Aiming at the comparatively laggard level of power plant electrical system automation, this paper analyzes the feasibility,necessity and some key points of the application of integrated automation technology to power ...Aiming at the comparatively laggard level of power plant electrical system automation, this paper analyzes the feasibility,necessity and some key points of the application of integrated automation technology to power plant electrical system. New idea using fieldbus control system technology is presented. This paper also gives the outline and detailed schemes.展开更多
The introduction of several small and large-scale industries,malls,shopping complexes,and domestic applications has significantly increased energy consumption.The aim of the work is to simulate a technically viable an...The introduction of several small and large-scale industries,malls,shopping complexes,and domestic applications has significantly increased energy consumption.The aim of the work is to simulate a technically viable and economically optimum hybrid power system for residential buildings.The proposed micro-grid model includes four power generators:solar power,wind power,Electricity Board(EB)source,and a Diesel Generator(DG)set,with solar and wind power performing as major sources and the EB supply and DG set serving as backup sources.The core issue in direct current to alternate current conversion is harmonics distortion,a five-stage multilevel inverter is employed with the assistance of an intelligent control system is simulated and the optimum system configuration is estimated to reduce harmonics and improve the power quality.The monthly demand for residential buildings is 13-15 Megawatts.So,almost 433 Kilo-Watts(KW)of electricity is required every day,and if it is used for 8 h per day,50-60 KW of electricity is needed per hour.The overall micro-grid model’s operation and performance are established using MATLAB/SIMULINK software,and simulation results are provided.The simulation results show that the developed system is both cost-effective and environment friendly resulting in yearly cost reductions.展开更多
文摘It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.
文摘Aiming at the comparatively laggard level of power plant electrical system automation, this paper analyzes the feasibility,necessity and some key points of the application of integrated automation technology to power plant electrical system. New idea using fieldbus control system technology is presented. This paper also gives the outline and detailed schemes.
文摘The introduction of several small and large-scale industries,malls,shopping complexes,and domestic applications has significantly increased energy consumption.The aim of the work is to simulate a technically viable and economically optimum hybrid power system for residential buildings.The proposed micro-grid model includes four power generators:solar power,wind power,Electricity Board(EB)source,and a Diesel Generator(DG)set,with solar and wind power performing as major sources and the EB supply and DG set serving as backup sources.The core issue in direct current to alternate current conversion is harmonics distortion,a five-stage multilevel inverter is employed with the assistance of an intelligent control system is simulated and the optimum system configuration is estimated to reduce harmonics and improve the power quality.The monthly demand for residential buildings is 13-15 Megawatts.So,almost 433 Kilo-Watts(KW)of electricity is required every day,and if it is used for 8 h per day,50-60 KW of electricity is needed per hour.The overall micro-grid model’s operation and performance are established using MATLAB/SIMULINK software,and simulation results are provided.The simulation results show that the developed system is both cost-effective and environment friendly resulting in yearly cost reductions.
基金supported by National Natural Science Foundation of China(61533013,61273144)Scientific Technology Research and Development Plan Project of Tangshan(13130298B)Scientific Technology Research and Development Plan Project of Hebei(z2014070)