The complexity of the actual operating environment of EMU trains and the interaction between the reliability of system components have become a huge challenge for the maintenance scheduling of EMU trains. In response ...The complexity of the actual operating environment of EMU trains and the interaction between the reliability of system components have become a huge challenge for the maintenance scheduling of EMU trains. In response to these problems, the evolution of reliability and failure rate under the influence of environmental factors, failure correlations and economy correlations is analyzed. We assume bogie systems form the EMU train in series. The failure correlation matrix of the bogie systems is modeled. With the lowest total maintenance cost as the optimization objective, a decision-making model for EMU train maintenance is established. A dynamic maintenance strategy is proposed for the model, which can improve maintenance plans efficiently. Artificial bee colony algorithm is applied to further iteratively optimize the threshold parameters in the strategy. The results are calculated and verified by a numerical example. The results show the effectiveness of the maintenance decision model. The dynamic maintenance strategy in this paper is compared with the traditional opportunistic maintenance strategy. The proposed maintenance strategy outperforms the traditional opportunistic maintenance strategy in the numerical example.展开更多
An accurate and objective assessment of the health status of EMU trains is of great importance.In order to make sure the trains are functional,reliable,and endurable in their full life cycle(FLC),health assessment met...An accurate and objective assessment of the health status of EMU trains is of great importance.In order to make sure the trains are functional,reliable,and endurable in their full life cycle(FLC),health assessment method for EMU trains after Level 3-5 maintenance and repair is studied.First,the element-selection principles and the assessment rules are defined;second,to present the complex topological relationship between the elements in assessment,a functional logical structure construction method is proposed;third,a health value calculation model is defined based on the element’s characteristics and their logical structures.The health variables of each element is calculated and fitted following the steps in the corresponding weight calculation methods.The assessment method is proved to be applicable and effective.展开更多
为解决当前动车组高级修工艺管理存在的问题,基于高级修部件物料清单(BOM,Bill of Materials)和工艺BOM的构建逻辑,以及工艺基础数据标准化、参数化、结构化的实际需要,融合工艺BOM与工艺流程的映射方法,采用SpringBoot+VUE前后端分离...为解决当前动车组高级修工艺管理存在的问题,基于高级修部件物料清单(BOM,Bill of Materials)和工艺BOM的构建逻辑,以及工艺基础数据标准化、参数化、结构化的实际需要,融合工艺BOM与工艺流程的映射方法,采用SpringBoot+VUE前后端分离的开发架构,设计了高级修工艺数字化管理系统。该系统实现了高级修工艺编制规范的统一和编制流程的优化,可自动生成工艺流程图和甘特图,并将准确的规格数据传输到制造执行系统(MES),已在中国铁路上海局集团有限公司上海动车段转向架车间开展应用,满足工艺数字化管理和辅助数字化生产的需要。展开更多
基金Sponsored by the National Natural Science Foundation of China(Grant No. 72061022)。
文摘The complexity of the actual operating environment of EMU trains and the interaction between the reliability of system components have become a huge challenge for the maintenance scheduling of EMU trains. In response to these problems, the evolution of reliability and failure rate under the influence of environmental factors, failure correlations and economy correlations is analyzed. We assume bogie systems form the EMU train in series. The failure correlation matrix of the bogie systems is modeled. With the lowest total maintenance cost as the optimization objective, a decision-making model for EMU train maintenance is established. A dynamic maintenance strategy is proposed for the model, which can improve maintenance plans efficiently. Artificial bee colony algorithm is applied to further iteratively optimize the threshold parameters in the strategy. The results are calculated and verified by a numerical example. The results show the effectiveness of the maintenance decision model. The dynamic maintenance strategy in this paper is compared with the traditional opportunistic maintenance strategy. The proposed maintenance strategy outperforms the traditional opportunistic maintenance strategy in the numerical example.
文摘An accurate and objective assessment of the health status of EMU trains is of great importance.In order to make sure the trains are functional,reliable,and endurable in their full life cycle(FLC),health assessment method for EMU trains after Level 3-5 maintenance and repair is studied.First,the element-selection principles and the assessment rules are defined;second,to present the complex topological relationship between the elements in assessment,a functional logical structure construction method is proposed;third,a health value calculation model is defined based on the element’s characteristics and their logical structures.The health variables of each element is calculated and fitted following the steps in the corresponding weight calculation methods.The assessment method is proved to be applicable and effective.
文摘为解决当前动车组高级修工艺管理存在的问题,基于高级修部件物料清单(BOM,Bill of Materials)和工艺BOM的构建逻辑,以及工艺基础数据标准化、参数化、结构化的实际需要,融合工艺BOM与工艺流程的映射方法,采用SpringBoot+VUE前后端分离的开发架构,设计了高级修工艺数字化管理系统。该系统实现了高级修工艺编制规范的统一和编制流程的优化,可自动生成工艺流程图和甘特图,并将准确的规格数据传输到制造执行系统(MES),已在中国铁路上海局集团有限公司上海动车段转向架车间开展应用,满足工艺数字化管理和辅助数字化生产的需要。