During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progres...During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable.展开更多
In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis c...In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions.展开更多
Based on advanced computer technology,internet of things(IOT) technology,project management concept and professional technology and combined with the innovative theories,methods and techniques in earlier hydropower pr...Based on advanced computer technology,internet of things(IOT) technology,project management concept and professional technology and combined with the innovative theories,methods and techniques in earlier hydropower projects,the life- cycle risk management system of high earth- rock dam project for Nuozhadu project was developed. The system mainly includes digital dam,three-dimensional design,construction quality monitoring,safety assessment and warning,etc,to integrally manage and analyze the dam design,constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safety quality monitoring in the project life cycle,and provided the basic platform for the scientific management of the construction and operation safety of high earth- rock dam. Application in Nuozhadu earth- rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality,and provided a new way for the quality safety control of high earth-rock dam.展开更多
A cascading failure of landslide dams caused by strong earthquakes or torrential rains in mountainous river valleys can pose great threats to people’s lives,properties,and infrastructures.In this study,based on the t...A cascading failure of landslide dams caused by strong earthquakes or torrential rains in mountainous river valleys can pose great threats to people’s lives,properties,and infrastructures.In this study,based on the three-dimensional Reynoldsaveraged Navier-Stokes equations(RANS),the renormalization group(RNG)k-εturbulence model,suspended and bed load transport equations,and the instability discriminant formula of dam breach side slope,and the explicit finite volume method(FVM),a detailed numerical simulation model for calculating the hydro-morphodynamic characteristics of cascading dam breach process has been developed.The developed numerical model can simulate the breach hydrograph and the dam breach morphology evolution during the cascading failure process of landslide dams.A model test of the breaches of two cascading landslide dams has been used as the validation case.The comparison of the calculated and measured results indicates that the breach hydrograph and the breach morphology evolution process of the upstream and downstream dams are generally consistent with each other,and the relative errors of the key breaching parameters,i.e.,the peak breach flow and the time to peak of each dam,are less than±5%.Further,the comparison of the breach hydrographs of the upstream and downstream dams shows that there is an amplification effect of the breach flood on the cascading landslide dam failures.Three key parameters,i.e.,the distance between the upstream and the downstream dams,the river channel slope,and the downstream dam height,have been used to study the flood amplification effect.The parameter sensitivity analyses show that the peak breach flow at the downstream dam decreases with increasing distance between the upstream and the downstream dams,and the downstream dam height.Further,the peak breach flow at the downstream dam first increases and then decreases with steepening of the river channel slope.When the flood caused by the upstream dam failure flows to the downstream dam,it can produce a surge wave that overtops and erodes the dam crest,resulting in a lowering of the dam crest elevation.This has an impact on the failure occurrence time and the peak breach flow of the downstream dam.The influence of the surge wave on the downstream dam failure process is related to the volume of water that overtops the dam crest and the erosion characteristics of dam material.Moreover,the cascading failure case of the Xiaogangjian and Lower Xiaogangjian landslide dams has also been used as the representative case for validating the model.In comparisons of the calculated and measured breach hydrographs and final breach morphologies,the relative errors of the key dam breaching parameters are all within±10%,which verify the rationality of the model is applicable to real-world cases.Overall,the numerical model developed in this study can provide important technical support for the risk assessment and emergency treatment of failures of cascading landslide dams.展开更多
A physically-based numerical three-dimensional earthen dam piping failure model is developed for homogeneous and zoned soil dams.This model is an erosion model,coupled with force/moment equilibrium analyses.Orifice fl...A physically-based numerical three-dimensional earthen dam piping failure model is developed for homogeneous and zoned soil dams.This model is an erosion model,coupled with force/moment equilibrium analyses.Orifice flow and two-dimensional(2D)shallow water equations(SWE)are solved to simulate dam break flows at different breaching stages.Erosion rates of different soils with different construction compaction efforts are calculated using corresponding erosion formulae.The dam's real shape,soil properties,and surrounding area are programmed.Large outer 2D-SWE grids are used to control upstream and downstream hydraulic conditions and control the boundary conditions of orifice flow,and inner 2D-SWE flow is used to scour soil and perform force/moment equilibrium analyses.This model is validated using the European Commission IMPACT(Investigation of Extreme Flood Processes and Uncertainty)Test#5 in Norway,Teton Dam failure in Idaho,USA,and Quail Creek Dike failure in Utah,USA.All calculated peak outflows are within 10%errors of observed values.Simulation results show that,for a V-shaped dam like Teton Dam,a piping breach location at the abutment tends to result in a smaller peak breach outflow than the piping breach location at the dam's center;and if Teton Dam had broken from its center for internal erosion,a peak outflow of 117851 m'/s,which is 81%larger than the peak outflow of 65120 m3/s released from its right abutment,would have been released from Teton Dam.A lower piping inlet elevation tends to cause a faster/earlier piping breach than a higher piping inlet elevation.展开更多
Granular debris plays a significant role in determining damming deposit characteristics. An indepth understanding of how variations in grain size distribution(GSD) and geometric configurations impact the behavior of g...Granular debris plays a significant role in determining damming deposit characteristics. An indepth understanding of how variations in grain size distribution(GSD) and geometric configurations impact the behavior of granular debris during the occurrence of granular debris is essential for precise assessment and effective mitigation of landslide hazards in mountainous terrains. This research aims to investigate the impact of GSD and geometric configurations on sliding and damming properties through laboratory experiments. The geometric configurations were categorized into three categories based on the spatial distribution of maximum volume: located at the front(Type Ⅰ), middle(Type Ⅱ), and rear(Type Ⅲ) of the granular debris. Our experimental findings highlight that the sliding and damming processes primarily depend on the interaction among the geometric configuration, grain size, and GSD in granular debris. Different sliding and damming mechanisms across various geometric configurations induce variability in motion parameters and deposition patterns. For Type Ⅰ configurations, the front debris functions as the critical and primary driving component, with energy dissipation primarily occurring through inter-grain interactions. In contrast, Type Ⅱ configurations feature the middle debris as the dominant driving component, experiencing hindrance from the front debris and propulsion from the rear, leading to complex alterations in sliding motion. Here, energy dissipation arises from a combination of inter-grain and grain-substrate interactions. Lastly, in Type Ⅲ configurations, both the middle and rear debris serve as the main driving components, with the rear sliding debris impeded by the front. In this case, energy dissipation predominantly results from grainsubstrate interaction. Moreover, we have quantitatively demonstrated that the inverse grading in damming deposits, where coarse grain moves upward and fine grain moves downward, is primarily caused by grain sorting due to collisions among the grains and between the grain and the base. The impact of grain on the horizontal channel further aids grain sorting and contributes to inverse grading. The proposed classification of three geometric configurations in our study enhances the understanding of damming properties from the view of mechanism, which provides valuable insights for related study about damming granular debris.展开更多
This study investigates the long-term performance of laboratory dam concrete in different curing environments over ten years and the microstructure of 17-year-old laboratory concrete and actual concrete cores drilled ...This study investigates the long-term performance of laboratory dam concrete in different curing environments over ten years and the microstructure of 17-year-old laboratory concrete and actual concrete cores drilled from the Three Gorges Dam.The mechanical properties of the laboratory dam concrete,whether cured in natural or standard environments,continued to improve over time.Furthermore,the laboratory dam concrete exhibited good resistance to diffusion and a refined microstructure after 17 years.However,curing and long-term exposure to the local natural environment reduced the frost resistance.Microstructural analyses of the laboratory concrete samples demonstrated that moderate-heat cement and fine fly ash(FA)particles were almost fully hydrated to form compact micro structures consisting of large quantities of homogeneous calcium(alumino)silicate hydrate(C-(A)-S-H)gels and a few crystals.No obvious interfacial transition zones were observed in the microstructure owing to the longterm pozzolanic reaction.This dense and homogenous microstructure was the crucial reason for the excellent long-term performance of the dam concrete.A high FA volume also played a significant role in the microstructural densification and performance growth of dam concrete at a later age.The concrete drilled from the dam surface exhibited a loose microstructure with higher microporosity,indicating that concrete directly exposed to the actual service environment suffered degradation caused by water and wind attacks.In this study,both macro-performance and microstructural analyses revealed that the application of moderate-heat cement and FA resulted in a dense and homogenous microstructure,which ensured the excellent long-term performance of concrete from the Three Gorges Dam after 17 years.Long-term exposure to an actual service environment may lead to microstructural degradation of the concrete surface.Therefore,the retained long-term dam concrete samples need to be further researched to better understand its microstructural evolution and development of its properties.展开更多
Currently,more than ten ultrahigh arch dams have been constructed or are being constructed in China.Safety control is essential to long-term operation of these dams.This study employed the flexibility coefficient and ...Currently,more than ten ultrahigh arch dams have been constructed or are being constructed in China.Safety control is essential to long-term operation of these dams.This study employed the flexibility coefficient and plastic complementary energy norm to assess the structural safety of arch dams.A comprehensive analysis was conducted,focusing on differences among conventional methods in characterizing the structural behavior of the Xiaowan arch dam in China.Subsequently,the spatiotemporal characteristics of the measured performance of the Xiaowan dam were explored,including periodicity,convergence,and time-effect characteristics.These findings revealed the governing mechanism of main factors.Furthermore,a heterogeneous spatial panel vector model was developed,considering both common factors and specific factors affecting the safety and performance of arch dams.This model aims to comprehensively illustrate spatial heterogeneity between the entire structure and local regions,introducing a specific effect quantity to characterize local deformation differences.Ultimately,the proposed model was applied to the Xiaowan arch dam,accurately quantifying the spatiotemporal heterogeneity of dam performance.Additionally,the spatiotemporal distri-bution characteristics of environmental load effects on different parts of the dam were reasonably interpreted.Validation of the model prediction enhances its credibility,leading to the formulation of health diagnosis criteria for future long-term operation of the Xiaowan dam.The findings not only enhance the predictive ability and timely control of ultrahigh arch dams'performance but also provide a crucial basis for assessing the effectiveness of engineering treatment measures.展开更多
The construction of dams for intercepting and storing water has altered surface water distributions, landsea water exchanges, and the load response of the solid Earth. The lack of accurate estimation of reservoir prop...The construction of dams for intercepting and storing water has altered surface water distributions, landsea water exchanges, and the load response of the solid Earth. The lack of accurate estimation of reservoir properties through the land surface and hydrological models can lead to water storage simulation and extraction errors. This impact is particularly evident in many artificial reservoirs in China. The study aims to comprehensively assess the spatiotemporal distribution and trends of water storage in medium and large reservoirs(MLRs) in Chinese mainland during 1950-2016, and to investigate the gravity,displacement, and strain effects induced by the reservoir mass concentration using the load elasticity theory. In addition, the impoundment contributions of MLRs to the relative sea level changes were assessed using a sea-level equation. The results show impoundment increases in the MLRs during1950-2016, particularly in the Yangtze River(Changjiang) and southern basins, causing significant elastic load effects in the surrounding areas of the reservoirs and increasing the relative sea level in China's offshore. However, long-term groundwater estimation trends are overestimated and underestimated in the Yangtze River and southwestern basins, respectively, due to the neglect of the MLRs impacts or the uncertainty of the hydrological model's output(e.g., soil moisture, etc.). The construction of MLRs may reduce the water mass input from land to the ocean, thus slowing global sea level rise. The results of the impact of human activities on the regional water cycle provide important references and data support for improving the integration of hydrological models, evaluating Earth's viscoelastic responses under longterm reservoir storage, enhancing in-situ and satellite geodetic measurements, and identifying the main factors driving sea level changes.展开更多
阐述数字幅度调制(Digital Amplitude Modulation,DAM)中波发射机模数(Analog to Digital,A/D)转换原理、A/D转换板主要组成部分及其作用,列举A/D转换板在实际运行中出现的常见故障案例,对常见故障给出分析和处理方法,为今后该板的故障...阐述数字幅度调制(Digital Amplitude Modulation,DAM)中波发射机模数(Analog to Digital,A/D)转换原理、A/D转换板主要组成部分及其作用,列举A/D转换板在实际运行中出现的常见故障案例,对常见故障给出分析和处理方法,为今后该板的故障分析和处理工作提供参考。展开更多
Erosion as a natural process produces soils, which are very important natural resources for the fest land plant- and animal kingdoms. Loss of the soil cover reduces agricultural production, biodiversity, and the role ...Erosion as a natural process produces soils, which are very important natural resources for the fest land plant- and animal kingdoms. Loss of the soil cover reduces agricultural production, biodiversity, and the role of soil as a filter for infiltrating water to replenish the groundwater. It also threatens the food supplies. The knowledge of erosion rates of rocks and terrains is important for developing proactive measures to protect soils from erosion and loss. In this study, erosion rates of catchment areas were calculated based on dams’ catchment extensions and the sediment loads transported by flood flows into dams’ lakes. The study results show that the chemically, via floodwater, transported quantities of materials are negligible compared to the solid materials transported by the water. It calculates erosion rates ranging from 0.013 to 0.212 mm/yr (13 - 212 m/10<sup>6</sup> yr) for the different catchment areas. Erosion rates in Jordan are, generally, higher than those calculated for the different parts of the world ranging from 2.5 to 60 m/10<sup>6</sup> yr. This fact can be explained by the very steep topography, calcareous rock cover of the catchment areas and the barren rock exposures.展开更多
With the characteristics of seepage flow in earth-rock dams, a seepagemonitoring model was established based on the finite element method for 3-D seepage flow togetherwith observed data and was used to analyze and mon...With the characteristics of seepage flow in earth-rock dams, a seepagemonitoring model was established based on the finite element method for 3-D seepage flow togetherwith observed data and was used to analyze and monitor the seepage of dams. In order to find out andmonitor the seepage status of the whole dam, the separation of seepage a-mount for dam body, damfoundation and side banks was made theoretically by using the model. Practical example shows thatthe accuracy of computed results is satisfactory and the separation results are more objective.展开更多
In this study,a numerical model,which can capture the full process of the development of seepage passages,the collapse of dams and the failure due to overtopping,is proposed for earth-rock dams.The critical incipient ...In this study,a numerical model,which can capture the full process of the development of seepage passages,the collapse of dams and the failure due to overtopping,is proposed for earth-rock dams.The critical incipient velocity for the occurrence of seepage failure is derived by analyzing the forces acting on soil particles in the seepage passage.The sediment transport formula is proposed to simulate the erosion process and the evolution of breach within the dam.In this model,the grain size distribution,the compaction density and the strength of dam materials are reasonably accounted for.Furthermore,the influences of the direction of seepage paths,the slope of the dam and the velocity of water flow on the amount of erosion are also taken into consideration.The proposed model and the corresponding numerical programs are employed to simulate the development of breaches and discharge of two typical cases due to seepage failure.The development of breaches,the history of discharge and the peak flood flux predicted by the numerical models are rather comparable to the measured data,which confirms the validity of the proposed model and the feasibility of applying the model in evaluating the disaster consequences and preparing the emergency counter measurements in the case of dam collapse.展开更多
In order to accurately predict and control the aging process of dams, new information should be collected continuously to renew the quantitative evaluation of dam safety levels. Owing to the complex structural charact...In order to accurately predict and control the aging process of dams, new information should be collected continuously to renew the quantitative evaluation of dam safety levels. Owing to the complex structural characteristics of dams, it is quite difficult to predict the time-varying factors affecting their safety levels. It is not feasible to employ dynamic reliability indices to evaluate the actual safety levels of dams. Based on the relevant regulations for dam safety classification in China, a dynamic probability description of dam safety levels was developed. Using the Bayesian approach and effective information mining, as well as real-time information, this study achieved more rational evaluation and prediction of dam safety levels. With the Bayesian expression of discrete stochastic variables, the a priori probabilities of the dam safety levels determined by experts were combined wfth the likelihood probability of the real-time check information, and the probability information for the evaluation of dam safety levels was renewed. The probability index was then applied to dam rehabilitation decision-making. This method helps reduce the difficulty and uncertainty of the evaluation of dam safety levels and complies with the current safe decision-making regulations for dams in China. It also enhances the application of current risk analysis methods for dam safety levels.展开更多
The unique structure and complex deformation characteristics of concrete face rockfill dams(CFRDs)create safety monitoring challenges.This study developed an improved random forest(IRF)model for dam health monitoring ...The unique structure and complex deformation characteristics of concrete face rockfill dams(CFRDs)create safety monitoring challenges.This study developed an improved random forest(IRF)model for dam health monitoring modeling by replacing the decision tree in the random forest(RF)model with a novel M5'model tree algorithm.The factors affecting dam deformation were preliminarily selected using the statistical model,and the grey relational degree theory was utilized to reduce the dimensions of model input variables.Finally,a deformation prediction model of CFRDs was established using the IRF model.The ten-fold cross-validation method was used to quantitatively analyze the parameters affecting the IRF algorithm.The performance of the established model was verified using data from three specific measurement points on the Jishixia dam and compared with other dam deformation prediction models.At point ES-10,the performance evaluation indices of the IRF model were superior to those of the M5'model tree and RF models and the classical support vector regression(SVR)and back propagation(BP)neural network models,indicating the satisfactory performance of the IRF model.The IRF model also outperformed the SVR and BP models in settlement prediction at points ES2-8 and ES4-10,demonstrating its strong anti-interference and generalization capabilities.This study has developed a novel method for forecasting and analyzing dam settlements with practical significance.Moreover,the established IRF model can also provide guidance for modeling health monitoring of other structures.展开更多
基金National Natural Science Foundation of China(No.51379192)
文摘During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable.
文摘In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions.
文摘Based on advanced computer technology,internet of things(IOT) technology,project management concept and professional technology and combined with the innovative theories,methods and techniques in earlier hydropower projects,the life- cycle risk management system of high earth- rock dam project for Nuozhadu project was developed. The system mainly includes digital dam,three-dimensional design,construction quality monitoring,safety assessment and warning,etc,to integrally manage and analyze the dam design,constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safety quality monitoring in the project life cycle,and provided the basic platform for the scientific management of the construction and operation safety of high earth- rock dam. Application in Nuozhadu earth- rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality,and provided a new way for the quality safety control of high earth-rock dam.
基金financially supported by the National Natural Science Foundation of China(Grant Nos.U22A20602,U2040221).
文摘A cascading failure of landslide dams caused by strong earthquakes or torrential rains in mountainous river valleys can pose great threats to people’s lives,properties,and infrastructures.In this study,based on the three-dimensional Reynoldsaveraged Navier-Stokes equations(RANS),the renormalization group(RNG)k-εturbulence model,suspended and bed load transport equations,and the instability discriminant formula of dam breach side slope,and the explicit finite volume method(FVM),a detailed numerical simulation model for calculating the hydro-morphodynamic characteristics of cascading dam breach process has been developed.The developed numerical model can simulate the breach hydrograph and the dam breach morphology evolution during the cascading failure process of landslide dams.A model test of the breaches of two cascading landslide dams has been used as the validation case.The comparison of the calculated and measured results indicates that the breach hydrograph and the breach morphology evolution process of the upstream and downstream dams are generally consistent with each other,and the relative errors of the key breaching parameters,i.e.,the peak breach flow and the time to peak of each dam,are less than±5%.Further,the comparison of the breach hydrographs of the upstream and downstream dams shows that there is an amplification effect of the breach flood on the cascading landslide dam failures.Three key parameters,i.e.,the distance between the upstream and the downstream dams,the river channel slope,and the downstream dam height,have been used to study the flood amplification effect.The parameter sensitivity analyses show that the peak breach flow at the downstream dam decreases with increasing distance between the upstream and the downstream dams,and the downstream dam height.Further,the peak breach flow at the downstream dam first increases and then decreases with steepening of the river channel slope.When the flood caused by the upstream dam failure flows to the downstream dam,it can produce a surge wave that overtops and erodes the dam crest,resulting in a lowering of the dam crest elevation.This has an impact on the failure occurrence time and the peak breach flow of the downstream dam.The influence of the surge wave on the downstream dam failure process is related to the volume of water that overtops the dam crest and the erosion characteristics of dam material.Moreover,the cascading failure case of the Xiaogangjian and Lower Xiaogangjian landslide dams has also been used as the representative case for validating the model.In comparisons of the calculated and measured breach hydrographs and final breach morphologies,the relative errors of the key dam breaching parameters are all within±10%,which verify the rationality of the model is applicable to real-world cases.Overall,the numerical model developed in this study can provide important technical support for the risk assessment and emergency treatment of failures of cascading landslide dams.
文摘A physically-based numerical three-dimensional earthen dam piping failure model is developed for homogeneous and zoned soil dams.This model is an erosion model,coupled with force/moment equilibrium analyses.Orifice flow and two-dimensional(2D)shallow water equations(SWE)are solved to simulate dam break flows at different breaching stages.Erosion rates of different soils with different construction compaction efforts are calculated using corresponding erosion formulae.The dam's real shape,soil properties,and surrounding area are programmed.Large outer 2D-SWE grids are used to control upstream and downstream hydraulic conditions and control the boundary conditions of orifice flow,and inner 2D-SWE flow is used to scour soil and perform force/moment equilibrium analyses.This model is validated using the European Commission IMPACT(Investigation of Extreme Flood Processes and Uncertainty)Test#5 in Norway,Teton Dam failure in Idaho,USA,and Quail Creek Dike failure in Utah,USA.All calculated peak outflows are within 10%errors of observed values.Simulation results show that,for a V-shaped dam like Teton Dam,a piping breach location at the abutment tends to result in a smaller peak breach outflow than the piping breach location at the dam's center;and if Teton Dam had broken from its center for internal erosion,a peak outflow of 117851 m'/s,which is 81%larger than the peak outflow of 65120 m3/s released from its right abutment,would have been released from Teton Dam.A lower piping inlet elevation tends to cause a faster/earlier piping breach than a higher piping inlet elevation.
基金support of the National Natural Science Foundation of China(U20A20111,42107189).
文摘Granular debris plays a significant role in determining damming deposit characteristics. An indepth understanding of how variations in grain size distribution(GSD) and geometric configurations impact the behavior of granular debris during the occurrence of granular debris is essential for precise assessment and effective mitigation of landslide hazards in mountainous terrains. This research aims to investigate the impact of GSD and geometric configurations on sliding and damming properties through laboratory experiments. The geometric configurations were categorized into three categories based on the spatial distribution of maximum volume: located at the front(Type Ⅰ), middle(Type Ⅱ), and rear(Type Ⅲ) of the granular debris. Our experimental findings highlight that the sliding and damming processes primarily depend on the interaction among the geometric configuration, grain size, and GSD in granular debris. Different sliding and damming mechanisms across various geometric configurations induce variability in motion parameters and deposition patterns. For Type Ⅰ configurations, the front debris functions as the critical and primary driving component, with energy dissipation primarily occurring through inter-grain interactions. In contrast, Type Ⅱ configurations feature the middle debris as the dominant driving component, experiencing hindrance from the front debris and propulsion from the rear, leading to complex alterations in sliding motion. Here, energy dissipation arises from a combination of inter-grain and grain-substrate interactions. Lastly, in Type Ⅲ configurations, both the middle and rear debris serve as the main driving components, with the rear sliding debris impeded by the front. In this case, energy dissipation predominantly results from grainsubstrate interaction. Moreover, we have quantitatively demonstrated that the inverse grading in damming deposits, where coarse grain moves upward and fine grain moves downward, is primarily caused by grain sorting due to collisions among the grains and between the grain and the base. The impact of grain on the horizontal channel further aids grain sorting and contributes to inverse grading. The proposed classification of three geometric configurations in our study enhances the understanding of damming properties from the view of mechanism, which provides valuable insights for related study about damming granular debris.
基金the financial supports provided by the National Natural Science Foundation of China(U2040222,52293431,and 52278259)。
文摘This study investigates the long-term performance of laboratory dam concrete in different curing environments over ten years and the microstructure of 17-year-old laboratory concrete and actual concrete cores drilled from the Three Gorges Dam.The mechanical properties of the laboratory dam concrete,whether cured in natural or standard environments,continued to improve over time.Furthermore,the laboratory dam concrete exhibited good resistance to diffusion and a refined microstructure after 17 years.However,curing and long-term exposure to the local natural environment reduced the frost resistance.Microstructural analyses of the laboratory concrete samples demonstrated that moderate-heat cement and fine fly ash(FA)particles were almost fully hydrated to form compact micro structures consisting of large quantities of homogeneous calcium(alumino)silicate hydrate(C-(A)-S-H)gels and a few crystals.No obvious interfacial transition zones were observed in the microstructure owing to the longterm pozzolanic reaction.This dense and homogenous microstructure was the crucial reason for the excellent long-term performance of the dam concrete.A high FA volume also played a significant role in the microstructural densification and performance growth of dam concrete at a later age.The concrete drilled from the dam surface exhibited a loose microstructure with higher microporosity,indicating that concrete directly exposed to the actual service environment suffered degradation caused by water and wind attacks.In this study,both macro-performance and microstructural analyses revealed that the application of moderate-heat cement and FA resulted in a dense and homogenous microstructure,which ensured the excellent long-term performance of concrete from the Three Gorges Dam after 17 years.Long-term exposure to an actual service environment may lead to microstructural degradation of the concrete surface.Therefore,the retained long-term dam concrete samples need to be further researched to better understand its microstructural evolution and development of its properties.
基金supported by the National Natural Science Foundation of China(Grant No.52079046).
文摘Currently,more than ten ultrahigh arch dams have been constructed or are being constructed in China.Safety control is essential to long-term operation of these dams.This study employed the flexibility coefficient and plastic complementary energy norm to assess the structural safety of arch dams.A comprehensive analysis was conducted,focusing on differences among conventional methods in characterizing the structural behavior of the Xiaowan arch dam in China.Subsequently,the spatiotemporal characteristics of the measured performance of the Xiaowan dam were explored,including periodicity,convergence,and time-effect characteristics.These findings revealed the governing mechanism of main factors.Furthermore,a heterogeneous spatial panel vector model was developed,considering both common factors and specific factors affecting the safety and performance of arch dams.This model aims to comprehensively illustrate spatial heterogeneity between the entire structure and local regions,introducing a specific effect quantity to characterize local deformation differences.Ultimately,the proposed model was applied to the Xiaowan arch dam,accurately quantifying the spatiotemporal heterogeneity of dam performance.Additionally,the spatiotemporal distri-bution characteristics of environmental load effects on different parts of the dam were reasonably interpreted.Validation of the model prediction enhances its credibility,leading to the formulation of health diagnosis criteria for future long-term operation of the Xiaowan dam.The findings not only enhance the predictive ability and timely control of ultrahigh arch dams'performance but also provide a crucial basis for assessing the effectiveness of engineering treatment measures.
基金supported by the National Natural Science Foundation of China (No.42274110 and 42374106)long-term monitoring project in the Three Gorges Reservoir area (the National Natural Science Foundation of China,No.41874090 and 41504065)。
文摘The construction of dams for intercepting and storing water has altered surface water distributions, landsea water exchanges, and the load response of the solid Earth. The lack of accurate estimation of reservoir properties through the land surface and hydrological models can lead to water storage simulation and extraction errors. This impact is particularly evident in many artificial reservoirs in China. The study aims to comprehensively assess the spatiotemporal distribution and trends of water storage in medium and large reservoirs(MLRs) in Chinese mainland during 1950-2016, and to investigate the gravity,displacement, and strain effects induced by the reservoir mass concentration using the load elasticity theory. In addition, the impoundment contributions of MLRs to the relative sea level changes were assessed using a sea-level equation. The results show impoundment increases in the MLRs during1950-2016, particularly in the Yangtze River(Changjiang) and southern basins, causing significant elastic load effects in the surrounding areas of the reservoirs and increasing the relative sea level in China's offshore. However, long-term groundwater estimation trends are overestimated and underestimated in the Yangtze River and southwestern basins, respectively, due to the neglect of the MLRs impacts or the uncertainty of the hydrological model's output(e.g., soil moisture, etc.). The construction of MLRs may reduce the water mass input from land to the ocean, thus slowing global sea level rise. The results of the impact of human activities on the regional water cycle provide important references and data support for improving the integration of hydrological models, evaluating Earth's viscoelastic responses under longterm reservoir storage, enhancing in-situ and satellite geodetic measurements, and identifying the main factors driving sea level changes.
文摘阐述数字幅度调制(Digital Amplitude Modulation,DAM)中波发射机模数(Analog to Digital,A/D)转换原理、A/D转换板主要组成部分及其作用,列举A/D转换板在实际运行中出现的常见故障案例,对常见故障给出分析和处理方法,为今后该板的故障分析和处理工作提供参考。
文摘Erosion as a natural process produces soils, which are very important natural resources for the fest land plant- and animal kingdoms. Loss of the soil cover reduces agricultural production, biodiversity, and the role of soil as a filter for infiltrating water to replenish the groundwater. It also threatens the food supplies. The knowledge of erosion rates of rocks and terrains is important for developing proactive measures to protect soils from erosion and loss. In this study, erosion rates of catchment areas were calculated based on dams’ catchment extensions and the sediment loads transported by flood flows into dams’ lakes. The study results show that the chemically, via floodwater, transported quantities of materials are negligible compared to the solid materials transported by the water. It calculates erosion rates ranging from 0.013 to 0.212 mm/yr (13 - 212 m/10<sup>6</sup> yr) for the different catchment areas. Erosion rates in Jordan are, generally, higher than those calculated for the different parts of the world ranging from 2.5 to 60 m/10<sup>6</sup> yr. This fact can be explained by the very steep topography, calcareous rock cover of the catchment areas and the barren rock exposures.
文摘With the characteristics of seepage flow in earth-rock dams, a seepagemonitoring model was established based on the finite element method for 3-D seepage flow togetherwith observed data and was used to analyze and monitor the seepage of dams. In order to find out andmonitor the seepage status of the whole dam, the separation of seepage a-mount for dam body, damfoundation and side banks was made theoretically by using the model. Practical example shows thatthe accuracy of computed results is satisfactory and the separation results are more objective.
基金supported by the National Basic Research Program of China ("973" Program) (Grant No. 2007CB714103)the National Natural Science Foundation of China (Grant No. 90815024)
文摘In this study,a numerical model,which can capture the full process of the development of seepage passages,the collapse of dams and the failure due to overtopping,is proposed for earth-rock dams.The critical incipient velocity for the occurrence of seepage failure is derived by analyzing the forces acting on soil particles in the seepage passage.The sediment transport formula is proposed to simulate the erosion process and the evolution of breach within the dam.In this model,the grain size distribution,the compaction density and the strength of dam materials are reasonably accounted for.Furthermore,the influences of the direction of seepage paths,the slope of the dam and the velocity of water flow on the amount of erosion are also taken into consideration.The proposed model and the corresponding numerical programs are employed to simulate the development of breaches and discharge of two typical cases due to seepage failure.The development of breaches,the history of discharge and the peak flood flux predicted by the numerical models are rather comparable to the measured data,which confirms the validity of the proposed model and the feasibility of applying the model in evaluating the disaster consequences and preparing the emergency counter measurements in the case of dam collapse.
基金supported by the National Science and Technology Support Program of China (Program for the Eleventh Five-Year Plan, Grant No. 2006BAC14B03 and 2006BAC05B03)the National Natural Science Foundation of China (Grant No. 50679043)
文摘In order to accurately predict and control the aging process of dams, new information should be collected continuously to renew the quantitative evaluation of dam safety levels. Owing to the complex structural characteristics of dams, it is quite difficult to predict the time-varying factors affecting their safety levels. It is not feasible to employ dynamic reliability indices to evaluate the actual safety levels of dams. Based on the relevant regulations for dam safety classification in China, a dynamic probability description of dam safety levels was developed. Using the Bayesian approach and effective information mining, as well as real-time information, this study achieved more rational evaluation and prediction of dam safety levels. With the Bayesian expression of discrete stochastic variables, the a priori probabilities of the dam safety levels determined by experts were combined wfth the likelihood probability of the real-time check information, and the probability information for the evaluation of dam safety levels was renewed. The probability index was then applied to dam rehabilitation decision-making. This method helps reduce the difficulty and uncertainty of the evaluation of dam safety levels and complies with the current safe decision-making regulations for dams in China. It also enhances the application of current risk analysis methods for dam safety levels.
基金supported by the National Natural Science Foundation of China(Grant No.51979224)the China National Funds for Distinguished Young Scientists(Grant No.52125904).
文摘The unique structure and complex deformation characteristics of concrete face rockfill dams(CFRDs)create safety monitoring challenges.This study developed an improved random forest(IRF)model for dam health monitoring modeling by replacing the decision tree in the random forest(RF)model with a novel M5'model tree algorithm.The factors affecting dam deformation were preliminarily selected using the statistical model,and the grey relational degree theory was utilized to reduce the dimensions of model input variables.Finally,a deformation prediction model of CFRDs was established using the IRF model.The ten-fold cross-validation method was used to quantitatively analyze the parameters affecting the IRF algorithm.The performance of the established model was verified using data from three specific measurement points on the Jishixia dam and compared with other dam deformation prediction models.At point ES-10,the performance evaluation indices of the IRF model were superior to those of the M5'model tree and RF models and the classical support vector regression(SVR)and back propagation(BP)neural network models,indicating the satisfactory performance of the IRF model.The IRF model also outperformed the SVR and BP models in settlement prediction at points ES2-8 and ES4-10,demonstrating its strong anti-interference and generalization capabilities.This study has developed a novel method for forecasting and analyzing dam settlements with practical significance.Moreover,the established IRF model can also provide guidance for modeling health monitoring of other structures.